RELOCATION OF WITHLACOOCHEE WPCP TO NEW
RELOCATION OF WITHLACOOCHEE WPCP TO NEW
LOCATION 60 FEET ABOVE THE CURRENT FLOOD LEVEL
This project is planned for use of design build approach to expedite design and construction in the shortest possible time frame. An RFP for design build is expected to be advertised in the summer of 2013 following approval of the RFP by both Georgia EPD and GEFA. Upon completion, the discharge will continue to use the existing WPCP Outfall on the Withlacoochee River.
Design to Meet Current Permit Limits
- 12 Million Gallons per Day Average Day Flow
- 22 Million Gallons per Day Peak Hydraulic Capacity
- Designed to Allow Future Expansion
- Maintains Current Discharge Point
Dual Power Feeds
Sited Above Flood Plain on City Property
Estimated Cost - $20 Million
Design/Build to Accelerate Project Completion