Lowndes Area Knowledge Exchange (LAKE)

[prev][index][next] [index to photographs]

BUDGET IMPACT: N/A includes 22 residential lots. Engineering and Utilities staff have made the final inspection of the construction of Phase IV,

Adopt Resolution Accepting Infrastructure for Val Del Estates Subdivision Phase IV
ULDC contractor extension, hospital revenue certificate reissuance, LAS generator, Juvenile Justice grant, Val Del Estates infrastructure @ LCC Packet
23 October 2023

 
BUDGET IMPACT: N/A includes 22 residential lots. Engineering and Utilities staff have made the final inspection of the construction of Phase IV,
bigger PDF