owl LAKE

Back again: Camelot Crossing subdivision, Val Del Estates street acceptance @ LCC 2022-04-25 [Up]

LAKE blog posts:

Documents received in response to a LAKE open records request:

Pictures

M

[Rezoning, Street acceptance]
Rezoning, Street acceptance

April-25-26-2022-Meeting-Packet

[PROPOSED AGENDA]
PROPOSED AGENDA
PDF

Lowndes County Division of Family and Children Services (DFCS) Board

[Pat Iverson and Rebecca Powell resigned. DFCS requests Sandra Wilcher and Lynn Orenstein.]
Pat Iverson and Rebecca Powell resigned. DFCS requests Sandra Wilcher and Lynn Orenstein.
PDF

REZ-2022-07 Hayden Park, Camelot Crossing & Val Del Rd, ~149 acres, from R-1 to C-G, P-D, and R-10

[BUDGET IMPACT: N/A to create a mixture of residential and commercial sites for development in various]
BUDGET IMPACT: N/A to create a mixture of residential and commercial sites for development in various
PDF

Lowndes County Traffic Engineering Report: N. Valdosta Road and Val Del Road

[Page 17]
Page 17
PDF

[Page 18]
Page 18
PDF

[Page 19]
Page 19
PDF

[The data was limited at other stations located in the study area and therefore they were not]
The data was limited at other stations located in the study area and therefore they were not
PDF

[located in the study area. The historical traffic volumes were projected out to existing year (2022)]
located in the study area. The historical traffic volumes were projected out to existing year (2022)
PDF

[Page 22]
Page 22
PDF

[Page 23]
Page 23
PDF

[Page 24]
Page 24
PDF

[Appendices]
Appendices
PDF

[Page 26]
Page 26
PDF

[Appendix A: Aerial Map of study area]
Appendix A: Aerial Map of study area
PDF

[Appendix A: Map of proposed turn lanes]
Appendix A: Map of proposed turn lanes
PDF

[Appendix B: Crash Data]
Appendix B: Crash Data
PDF

[Appendix C: Traffic Count Data]
Appendix C: Traffic Count Data
PDF

[Page 31]
Page 31
PDF

[On Roadway - Roadway intersection]
On Roadway - Roadway intersection
PDF

[Page 33]
Page 33
PDF

[Page 34]
Page 34
PDF

[Page 35]
Page 35
PDF

[Page 36]
Page 36
PDF

[Page 37]
Page 37
PDF

[Page 38]
Page 38
PDF

[Page 39]
Page 39
PDF

[Page 40]
Page 40
PDF

[Page 41]
Page 41
PDF

[Page 42]
Page 42
PDF

[Page 43]
Page 43
PDF

[Page 44]
Page 44
PDF

[Page 45]
Page 45
PDF

[Page 46]
Page 46
PDF

[Page 47]
Page 47
PDF

[Appendix D: Growth Rate]
Appendix D: Growth Rate
PDF

[Page 49]
Page 49
PDF

[Appendix E: AM and PM Trip Generation Distribution]
Appendix E: AM and PM Trip Generation Distribution
PDF

[Page 51]
Page 51
PDF

[Page 52]
Page 52
PDF

[Appendix F: Synchro Reports]
Appendix F: Synchro Reports
PDF

[Page 54]
Page 54
PDF

[Page 55]
Page 55
PDF

[Page 56]
Page 56
PDF

[Page 57]
Page 57
PDF

[Page 58]
Page 58
PDF

[Page 59]
Page 59
PDF

[Page 60]
Page 60
PDF

[Page 61]
Page 61
PDF

[Page 62]
Page 62
PDF

[Page 63]
Page 63
PDF

[Page 64]
Page 64
PDF

[Page 65]
Page 65
PDF

[Appendix G: ICE Tool]
Appendix G: ICE Tool
PDF

[roughly seventy five percent of all traffic crashes in Georgia occur at or adjacent to intersections. Accordingly, the Georgia SHSP includes an emphasis on enhancing]
roughly seventy five percent of all traffic crashes in Georgia occur at or adjacent to intersections. Accordingly, the Georgia SHSP includes an emphasis on enhancing
PDF

[G D QT GDOT INTERSECTION CONTROL EVALUATION (ICE) WAIVER FORM]
G D QT GDOT INTERSECTION CONTROL EVALUATION (ICE) WAIVER FORM
PDF

[Page 69]
Page 69
PDF

One Valdosta-Lowndes Community-Wide Initiative

[BUDGET IMPACT: $200,000.00 to be paid over a five-year period FUNDING SOURCE: (X) Annual (Unincorporated revenue)]
BUDGET IMPACT: $200,000.00 to be paid over a five-year period FUNDING SOURCE: (X) Annual (Unincorporated revenue)
PDF

Exit 22 Permanent Utility Easement

[BUDGET IMPACT: $1.00]
BUDGET IMPACT: $1.00
PDF

Exit 22 Temporary Construction Easement

[BUDGET IMPACT: N/A: ten foot easement is needed during the construction period to provide sufficient space to complete the water main extension.]
BUDGET IMPACT: N/A: ten foot easement is needed during the construction period to provide sufficient space to complete the water main extension.
PDF

Acceptance of FY2022 Delinquency Prevention Grant

[BUDGET IMPACT: $41,500.00 - CJCC Funding]
BUDGET IMPACT: $41,500.00 - CJCC Funding
PDF

FY2023 Juvenile Justice Incentive Grant

[BUDGET IMPACT: $195,372.00 - CJCC Funding]
BUDGET IMPACT: $195,372.00 - CJCC Funding
PDF

[C. Target Population]
C. Target Population
PDF

[RFP]
RFP
PDF

[Page 85]
Page 85
PDF

[3. Target Population]
3. Target Population
PDF

[b. How and why target population was selected:]
b. How and why target population was selected:
PDF

[youth are ineligible for FFT services other than primarily youth with severe mental or]
youth are ineligible for FFT services other than primarily youth with severe mental or
PDF

[Number of Cohorts: A total of 36 youth and their families will be served in FFT during FY]
Number of Cohorts: A total of 36 youth and their families will be served in FFT during FY
PDF

[Page 90]
Page 90
PDF

[Page 91]
Page 91
PDF

[Page 92]
Page 92
PDF

[e. Identify potential ways to increase current evidence-based service capacity for target population.]
e. Identify potential ways to increase current evidence-based service capacity for target population.
PDF

[e FY22 projected youth served compared to final number/percent of youth served to-date:]
e FY22 projected youth served compared to final number/percent of youth served to-date:
PDF

[Page 95]
Page 95
PDF

[education and training plan]
education and training plan
PDF

[Page 97]
Page 97
PDF

[Page 98]
Page 98
PDF

[Page 99]
Page 99
PDF

[Page 100]
Page 100
PDF

[Page 101]
Page 101
PDF

[Page 102]
Page 102
PDF

[Page 103]
Page 103
PDF

[Page 104]
Page 104
PDF

[calculation. For example, provide the office space square footage and the lease rate or provide the monthly tease amount and the number of months leased. For unl]
calculation. For example, provide the office space square footage and the lease rate or provide the monthly tease amount and the number of months leased. For unl
PDF

[Namo of Consultant [Service Provided [Cost per unit [Service # Units Cost]
Namo of Consultant [Service Provided [Cost per unit [Service # Units Cost
PDF

[Page 107]
Page 107
PDF

[Page 108]
Page 108
PDF

Beer License - Rakesh Parmar of Jiya 08 Investment, LLC, DBA Eagle Food Mart - 4952 Bemiss Rd., Valdosta, GA

[due to a change of ownership.]
due to a change of ownership.
PDF

Agreement with TEqBID for Surplus Sales of Heavy Equipment

[TEGBID is an online auction site specializing in heavy equipment sales.]
TEGBID is an online auction site specializing in heavy equipment sales.
PDF

Adopt Resolution Accepting Infrastructure for Val Del Estates Subdivision Phase III

[BUDGET IMPACT: N/A: located on Val Del Road]
BUDGET IMPACT: N/A: located on Val Del Road
PDF

Historic Lowndes County Courthouse Rehabilitation Project GMP (Guaranteed Maximum Price)

[BUDGET IMPACT: $9,855,808.85]
BUDGET IMPACT: $9,855,808.85
PDF

April-11-2022-Work-Session-Minutes

[REZ-2022-06 Kinderlou Forest, REZ-2022-07 Hayden Park]
REZ-2022-06 Kinderlou Forest, REZ-2022-07 Hayden Park
PDF

April-12-2022-Regular-Session-Minutes

[Proclamation, REZ-2022-06 Kinderlou]
Proclamation, REZ-2022-06 Kinderlou
PDF

/govt/loco/2022-04-25--lcc-packet