Tag Archives: Withlacoochee River

The rest of the story on waste water —Tim Carroll

Received today from Valdosta City Council Tim Carroll, who sent it to a long list of people, apparently responding to the VDT's recent article and editorials.

All,

During my tenure as a city councilman, I have tried to keep everyone updated on events and issues with our city. I want to share and email I sent out recently that hopefully you will agree is important information. In regards to today's paper — the story has some serious errors and omissions. First of all in 2009- all we saved from the flood was the pump station. No sewage treatment was taking place and contrary to what the VDT says, then as we are now — raw sewage was going into the river. It lasted about a month in 2009. With the decision to pull equipment/tanks etc so they would not be destroyed this year — we not only saved a lot of tax payer money….but we will be able to bring the plant back on line in about a week. Reducing by several weeks the amount of sewage going into the river. In regards to city water systems being compromised — considering our water plant is 10-15 miles north of the WWTP and the amazing fact that the river flows south — your water is completely safe. Do we like discharging raw sewage into the river? Of course not. During the flood it was going to happen either way.

I want to add one other note — the men and women in our Utility department, fire, police, sanitation, engineering etc, etc Floridan Aquifer have been working long days this past week trying to manage flooding issues. They deserve our thanks. It is very frustrating for those whose homes and businesses were threatened by the flood. It is very frustrating to our city employees who have worked so hard to manage this crisis.

So as Paul Harvey says — “here is the rest of the story”.

I think Council Carroll is a bit cavalier about the city's wells being upstream of the wastewater treatment plant, because while the river may flow south, it's not clear how the Floridan Aquifer flows, especially with multiple 800 foot deep wells sucking water out of it. Also I wonder what people downstream of the Withlacoochee Wastewater Treatment Plant think of all that raw sewage coming down at them, especially considering some of them have wells downstream.

However, he makes a number of points that the VDT omitted, including a plan to do something about the situation, and appended is his "rest of the story".

Continue reading

VDT v Valdosta Re Wastewater

The VDT has apparently decided the City of Valdosta is to blame for the Withlacoochee Wastewater Woes, and has made its case in a story and two editorials. They seem to have forgotten about the overflow in 2012 already. And the VDT seems to have forgotten about it and its editor's own apparent roles in the loss of the recent SPLOST election that would have funded a new wastewater plant.

Jason Schaefer wrote for the VDT today, Money saved at river's expense: EPD investigates cause of sewage release as waters recede,

When the flooding occurred in April 2009, the City made extraordinary efforts to hold back the flooding, bringing in dirt and heavy machinery to build a berm around the influent pump station and other treatment equipment, working round the clock.

The efforts were successful. The treatment plant remained on during the duration of the flood, and Valdosta's raw sewage remained contained, though the facility incurred damages to its electrical and biological purification systems, according to Utilities Director Henry Hicks.

This year, the City opted for a different approach—cut electricity to the underwater portions of the plant, submit to the flooding and clean up afterwards.

The plant was “taken offline” Thursday at 9 a.m. “to prevent further damage to equipment and associated electrical and control systems,” according to a statement issued by the Department of the City Manager.

The City stated that as a result of the shutdown, “untreated sewage will be discharging directly into the river” at a rate of between five and six million gallons of raw sewage per day.

In addition, the floodwaters were allowed into the plant and around the remaining portions of the berm that was constructed in 2009 during the rising flood. Only half of the berm now remains, as the other half was removed to allow access to the lower portions of the plant, Hicks said.

So far, this year's response strategy seems to have saved the City money. In 2009, about $500,000 was spent in manpower, equipment and supplies to build the berm alone, and the plant, kept running, incurred significant damages though raw sewage was kept out of the river. This year, the money was not spent on the berm or to prevent the flooding, and at least 15 to 20 million gallons of raw sewage will have been released into the Withlacoochee by the time the plant is back online.

There's more in the story, which is well worth a read. Also note this inserted in the middle of the story:

Editor Kay Harris contributed to this story.

The VDT cites the EPA report, National Enforcement Initiative (FY 2011 – 2013) Keeping Raw Sewage and Contaminated Stormwater Out of Our Nation’s Waters, (more about that EPA initiative here) and continues:

Continue reading

Videos of the Withlacoochee River in flood

Here are pictures and videos of the Withlacoochee River at GA 122 18 Feb 2013 Withlacoochee River @ GA 122 27 Feb 2013 Withlacoochee River @ GA 122 on 18 February 2013 (on the left when the river was rising) and 27 February 2013 (on the right, when it was clearly in flood stage).

Pictures and videos of the Withlacoochee River at GA 122 by John S. Quarterman and Gretchen Quarterman for WWALS Watershed Coailition.


Brandon Powers for the VDT
And the Valdosta Daily Times has discovered video! VDT posted 25 February 2013, The effects of rain, which includes video of numerous locations around Lowndes County. This is all relevant to the Withlacoochee Wastewater Woes for Valdosta and Lowndes County.

-jsq

Withlacoochee Wastewater Woes for Valdosta and Lowndes County

AP picked up the story about flooding at Valdosta's Withlacoochee wasterwater treatment plant, citing the VDT and the City as sources. The City of Valdosta thinks the County should contribute to replacing the plant, or maybe the legislature will authorize a municipal option sales tax (MOST).

AP in GPBNews 1 March 2013, Valdosta Treatment Plant Floods,


Authorities shut down a Valdosta wastewater treatment plant as a river flooded critical buildings and structures. The city estimates an average of 5 million to 6 million gallons of untreated sewage will discharge daily into the Withlacoochee River until the flood waters recede and the plant can resume operation. (Photo Courtesy of John S. Quarterman via Flickr.)
VALDOSTA, Ga. —

Authorities shut down a south Georgia wastewater treatment plant as a river flooded critical buildings and structures.

Valdosta city officials said power at the plant was shut down Thursday to prevent further damage to equipment and control systems.

The city estimates an average of 5 million to 6 million gallons of untreated sewage will discharge daily into the Withlacoochee River until the flood waters recede and the plant can resume operation.

The AP story continues, but let's cut to the sources.

Continue reading

Video Playlist @ LCC 2012-09-25

Fewer speakers at the Regular Session than at the previous morning’s Work Session of the Lowndes County Commission. The longest item was a citizen wishing to be heard, who only spoke for 3 and a half minutes. Up until then, the meeting took five minutes, as the Chairman noted. And everything was adopted unanimously, with little or no discussion.

Here’s the agenda, annotated below with links to the videos and a few notes, and followed by a video playlist.

  1. Call to Order
  2. Invocation
  3. Pledge of Allegiance to the Flag
  4. Minutes for Approval
    First the Chairman welcomed Leadership Lowndes.
    Then both sets of minutes were unanimously approved with no changes.
    1. Work Session — September 10, 2012
    2. Regular Session — September 11, 2012
  5. For Consideration
    1. Bevel Creek Lift Station Repair —Mike Allen
      The total for the wastewater lift station was still $38,969 with the budget impact being the insurance deductible. Unanimously approved.
    2. Dell Lease Agreement for Sheriff’s Office Laptops —Aaron Kostyu
      Six years ago the Sheriff’s Dept. leased some laptops; plan was always to roll new laptops into the lease; that will be done using drug seizure funds. Unanimously approved.
    3. Contract with Corporate Health Partners
      County Manager Joe Pritchard said they had started looking into wellness plans several years ago, $260,000 in savings in health care expenses so far; partnership with SGMC and YMCA. Commissioner Joyce Evans wanted to know how regularly it would be monitoried. Answer: quarterly. Commissioner Richard Raines moved to approve Corporate Health Partners, except instead of a three year contract, an initial one year with two one-year extensions. Unanimously approved.
    4. Agreement with Basic Life
      Joe Pritchard alluded to yesterday’s presentation from Chris Park(? Clark?) recommending a change to basic life coverage, with an approximate annual savings of slightly over $10,000. Unanimously approved.
  6. Reports-County Manager
    Joe Pritchard had no report.
  7. Citizens Wishing to be Heard Please State Name And Address
    Chairman Ashley Paulk noted it was 5:35, and then Ken Klanicki spoke for 3 and a half minutes, the longest item in the meeting, after which they adjourned.

Video Playlist
Regular Session, Lowndes County Commission (LCC),
Videos by Gretchen Quarterman for Lowndes Area Knowledge Exchange (LAKE),
Valdosta, Lowndes County, Georgia, 25 September 2012.

-jsq

Video Playlist @ LCC 2012-09-24

A parade of speakers not on the agenda extended yesterday morning’s Work Session of the Lowndes County Commission. They spoke about the conference center, about South Georgia Partnership for Homelessness, and about health and life insurance. Commissioners heard from staff about repairs to a sewage lift station and laptops for the Sheriff’s office. They vote on all these things at their Regular Session tonight at 5:30 PM.

Here’s the agenda, annotated below with links to the videos and a few notes, and followed by a video playlist.

  1. Call to Order
  2. Invocation
  3. Pledge of Allegiance to the Flag
  4. Minutes for Approval
    1. Work Session — September 10, 2012
    2. Regular Session — September 11, 2012
    The Chairman announced guests not on the agenda.
  5. For Consideration
    1. Bevel Creek Lift Station Repair
      MR Systems’ quote for SCADA control panel was $13,775, plus another control panel $25,194, for a total of $38,969. Utilities Director Mike Allen said making an addition (presumably of the $25,194 control panel) would save four weeks of downtime.
    2. Dell Lease Agreement for Sheriff’s Office Laptops
    3. Contract with Corporate Health Partners
      County Manager Joe Pritchard said they had achieved $260,000 in savings towards projected $300,000 savings in health care expenses. He introduced Chris Park(?) with Park(?) Group and Jack Curtis with Corporate Health Partners. Pritchard said the county Wanted to add a wellness program to improve employee quality of life and wellbeing. Chris Park(?) spoke first. He introduced Jack Curtis, who spoke about a wellness program proposal.
    4. Agreement with Basic Life
      Chris Park(?) spoke again, saying what he was proposing would save $10,000 or 23% over the current plan while preserving all the current benefits.
  6. Reports-County Manager
    Joe Pritchard had no report, so they adjourned.
  7. Citizens Wishing to be Heard Please State Name And Address
    That’s only for the Regular Session.

Video Playlist
Work Session, Lowndes County Commission (LCC),
Videos by Brandon Livingston for Lowndes Area Knowledge Exchange (LAKE), Valdosta, Lowndes County, Georgia, 24 September 2012.

-jsq

Sewers, laptops, and insurance @ LCC 2012-09-24

Repairs to a sewage lift station, laptops for the Sheriff’s office, and health and life insurance. I’ll bet this morning’s Lowndes County Commission Work Session will be brief.

What’s this about a Bevel Creek Lift Station Repair? That sewer line station seems to have last been mentioned in a Commission meeting 11 February 2003:

Mr. Clark stated that the Bevel Creek Lift Station rehab came in under budget enough to cover the additional $26,000.00 from the Exit 22 project.

The Commissioners (of whom only Joyce Evans is still or again on the Commission) proceeded to approve one of their famous transportation change orders.

But what is Bevel Creek? According to Watershed Assessment: The Watersheds Associated with Lowndes County, Georgia, May 2001,

Bevel Creek discharges into the Withlacoochee River in north-central Florida.

Since Bevel Creek doesn’t join the Withlacoochee River in Georgia, it’s considered as a separate watershed basin for Lowndes County.

Here’s the agenda.

LOWNDES COUNTY BOARD OF COMMISSIONERS
PROPOSED AGENDA
WORK SESSION, MONDAY, SEPTEMBER 24, 2012, 8:30 a.m.
REGULAR SESSION, TUESDAY, SEPTEMBER 25, 2012, 5:30 p.m.
327 N. Ashley Street — 2nd Floor
Continue reading

Another sewage overflow after FEMA finally decides about Valdosta wastewater plant

Since the floods of 2009 Valdosta had been waiting on FEMA to say whether it would grant some funding for improving the wastewater treatment plant that flooded then. Finally, FEMA gave a decision, no, which allowed the Valdosta City Council to choose another path. But not in time for improvements before the same plant had another wastewater overflow.

WCTV posted PR from the City of Valdosta of 17 August 2012, Major Sewage Overflow from Withlacoochee Water Pollution Control Plant,

At approximately 1 a.m. on Aug. 16, 2012, the pumps in the Influent Pump Station of the Withlacoochee Water Pollution Control Plant (WPCP) stopped working.

An emergency bypass pump system was placed into service at 12:45 a.m., on Aug. 17; and as a result, the sewer spills are no longer occurring. Contractors are currently on site investigating the cause of the failure, which has not yet been determined, while also making necessary repairs to the damaged equipment.

Sewer overflows were recorded at the following locations within the sewer collection system:

Continue reading

Withlacoochee and Little Rivers peaking, 2012-08-14

We've seen the Lowndes County PR about Withlacoochee River flooding. Ashley Tye has posted on the Emergency Management page a list of links to river gauges in Lowndes County. Here are current images from each of them, going from upstream to downstream, left to right:

Little River near Hahira (SR 122)
Little River near Hahira (SR 122)
Withlacoochee River above Valdosta (Skipper Bridge Road)
Withlacoochee River (Skipper Bridge Road)

Withlacoochee River near Foxborough (US 41)
Withlacoochee River near Foxborough (US 41)

Withlacoochee River near Quitman (US 84)
Withlacoochee River near Quitman (US 84)

You can easily see the rivers have peaked upstream at Hahira and Skipper Bridge, may be peaking at Foxborough, but the Withlacoochee is still rising downstream at Quitman.

-jsq

Flooding on the Withlacoochee?

Many of the same factors that cause the prolonged extreme drought we’ve been having (deforestation, impervious surfaces, climate change) also produce flooding when we get a little rain. The flooding map by NWS Advanced Hydrologic Prediction Service, Weather Forecast Office Tallahassee, FL, 2012-08-14 shows minor flooding on the Withlacoochee River at Skipper Bridge Road.

WTXL yesterday posted PR from Lowndes County, Georgia, Withlacoochee River under watch due to rising water, flood warnings,

LOWNDES COUNTY, Ga.—Due to rising waters and the issuance of a Flood Warning by the National Weather Service, Lowndes County Emergency Management continues to monitor rising water levels on the Withlacoochee River at the Skipper Bridge Road stream gauge site.

Currently, the water level stands at approximately 14.3 feet and is expected to crest this afternoon at approximately 14.5 feet.

While a flood warning is in effect, the only area flooded at these Minor Flooding of Withlacoochee River at Skipper Bridge Road, Lowndes County, Georgia levels are woodland areas near the river. Historically, flooding does not affect local roads and/or residences until water levels reach approximately 17 feet.

Lowndes County Emergency Management will continue to monitor conditions and additional updates will be distributed as new information becomes available. While there is no cause for immediate concern, citizens are encouraged to remain aware of their surroundings.

Residents may monitor local river levels by accessing real time stream gauge information by visiting the following link: water.weather.gov/ahps2/index.php?wfo=tae.

For more information, please contact Lowndes County Public Information Officer, Paige Dukes, 229-292-6142 or pdukes@lowndescounty.com.

Curiously, on the County’s own Press Releases web page, there’s no mention of this PR.

-jsq