Tag Archives: Withlacoochee River

Video Playlist @ LCC 2012-09-25

Fewer speakers at the Regular Session than at the previous morning’s Work Session of the Lowndes County Commission. The longest item was a citizen wishing to be heard, who only spoke for 3 and a half minutes. Up until then, the meeting took five minutes, as the Chairman noted. And everything was adopted unanimously, with little or no discussion.

Here’s the agenda, annotated below with links to the videos and a few notes, and followed by a video playlist.

  1. Call to Order
  2. Invocation
  3. Pledge of Allegiance to the Flag
  4. Minutes for Approval
    First the Chairman welcomed Leadership Lowndes.
    Then both sets of minutes were unanimously approved with no changes.
    1. Work Session — September 10, 2012
    2. Regular Session — September 11, 2012
  5. For Consideration
    1. Bevel Creek Lift Station Repair —Mike Allen
      The total for the wastewater lift station was still $38,969 with the budget impact being the insurance deductible. Unanimously approved.
    2. Dell Lease Agreement for Sheriff’s Office Laptops —Aaron Kostyu
      Six years ago the Sheriff’s Dept. leased some laptops; plan was always to roll new laptops into the lease; that will be done using drug seizure funds. Unanimously approved.
    3. Contract with Corporate Health Partners
      County Manager Joe Pritchard said they had started looking into wellness plans several years ago, $260,000 in savings in health care expenses so far; partnership with SGMC and YMCA. Commissioner Joyce Evans wanted to know how regularly it would be monitoried. Answer: quarterly. Commissioner Richard Raines moved to approve Corporate Health Partners, except instead of a three year contract, an initial one year with two one-year extensions. Unanimously approved.
    4. Agreement with Basic Life
      Joe Pritchard alluded to yesterday’s presentation from Chris Park(? Clark?) recommending a change to basic life coverage, with an approximate annual savings of slightly over $10,000. Unanimously approved.
  6. Reports-County Manager
    Joe Pritchard had no report.
  7. Citizens Wishing to be Heard Please State Name And Address
    Chairman Ashley Paulk noted it was 5:35, and then Ken Klanicki spoke for 3 and a half minutes, the longest item in the meeting, after which they adjourned.

Video Playlist
Regular Session, Lowndes County Commission (LCC),
Videos by Gretchen Quarterman for Lowndes Area Knowledge Exchange (LAKE),
Valdosta, Lowndes County, Georgia, 25 September 2012.

-jsq

Video Playlist @ LCC 2012-09-24

A parade of speakers not on the agenda extended yesterday morning’s Work Session of the Lowndes County Commission. They spoke about the conference center, about South Georgia Partnership for Homelessness, and about health and life insurance. Commissioners heard from staff about repairs to a sewage lift station and laptops for the Sheriff’s office. They vote on all these things at their Regular Session tonight at 5:30 PM.

Here’s the agenda, annotated below with links to the videos and a few notes, and followed by a video playlist.

  1. Call to Order
  2. Invocation
  3. Pledge of Allegiance to the Flag
  4. Minutes for Approval
    1. Work Session — September 10, 2012
    2. Regular Session — September 11, 2012
    The Chairman announced guests not on the agenda.
  5. For Consideration
    1. Bevel Creek Lift Station Repair
      MR Systems’ quote for SCADA control panel was $13,775, plus another control panel $25,194, for a total of $38,969. Utilities Director Mike Allen said making an addition (presumably of the $25,194 control panel) would save four weeks of downtime.
    2. Dell Lease Agreement for Sheriff’s Office Laptops
    3. Contract with Corporate Health Partners
      County Manager Joe Pritchard said they had achieved $260,000 in savings towards projected $300,000 savings in health care expenses. He introduced Chris Park(?) with Park(?) Group and Jack Curtis with Corporate Health Partners. Pritchard said the county Wanted to add a wellness program to improve employee quality of life and wellbeing. Chris Park(?) spoke first. He introduced Jack Curtis, who spoke about a wellness program proposal.
    4. Agreement with Basic Life
      Chris Park(?) spoke again, saying what he was proposing would save $10,000 or 23% over the current plan while preserving all the current benefits.
  6. Reports-County Manager
    Joe Pritchard had no report, so they adjourned.
  7. Citizens Wishing to be Heard Please State Name And Address
    That’s only for the Regular Session.

Video Playlist
Work Session, Lowndes County Commission (LCC),
Videos by Brandon Livingston for Lowndes Area Knowledge Exchange (LAKE), Valdosta, Lowndes County, Georgia, 24 September 2012.

-jsq

Sewers, laptops, and insurance @ LCC 2012-09-24

Repairs to a sewage lift station, laptops for the Sheriff’s office, and health and life insurance. I’ll bet this morning’s Lowndes County Commission Work Session will be brief.

What’s this about a Bevel Creek Lift Station Repair? That sewer line station seems to have last been mentioned in a Commission meeting 11 February 2003:

Mr. Clark stated that the Bevel Creek Lift Station rehab came in under budget enough to cover the additional $26,000.00 from the Exit 22 project.

The Commissioners (of whom only Joyce Evans is still or again on the Commission) proceeded to approve one of their famous transportation change orders.

But what is Bevel Creek? According to Watershed Assessment: The Watersheds Associated with Lowndes County, Georgia, May 2001,

Bevel Creek discharges into the Withlacoochee River in north-central Florida.

Since Bevel Creek doesn’t join the Withlacoochee River in Georgia, it’s considered as a separate watershed basin for Lowndes County.

Here’s the agenda.

LOWNDES COUNTY BOARD OF COMMISSIONERS
PROPOSED AGENDA
WORK SESSION, MONDAY, SEPTEMBER 24, 2012, 8:30 a.m.
REGULAR SESSION, TUESDAY, SEPTEMBER 25, 2012, 5:30 p.m.
327 N. Ashley Street — 2nd Floor
Continue reading

Another sewage overflow after FEMA finally decides about Valdosta wastewater plant

Since the floods of 2009 Valdosta had been waiting on FEMA to say whether it would grant some funding for improving the wastewater treatment plant that flooded then. Finally, FEMA gave a decision, no, which allowed the Valdosta City Council to choose another path. But not in time for improvements before the same plant had another wastewater overflow.

WCTV posted PR from the City of Valdosta of 17 August 2012, Major Sewage Overflow from Withlacoochee Water Pollution Control Plant,

At approximately 1 a.m. on Aug. 16, 2012, the pumps in the Influent Pump Station of the Withlacoochee Water Pollution Control Plant (WPCP) stopped working.

An emergency bypass pump system was placed into service at 12:45 a.m., on Aug. 17; and as a result, the sewer spills are no longer occurring. Contractors are currently on site investigating the cause of the failure, which has not yet been determined, while also making necessary repairs to the damaged equipment.

Sewer overflows were recorded at the following locations within the sewer collection system:

Continue reading

Withlacoochee and Little Rivers peaking, 2012-08-14

We've seen the Lowndes County PR about Withlacoochee River flooding. Ashley Tye has posted on the Emergency Management page a list of links to river gauges in Lowndes County. Here are current images from each of them, going from upstream to downstream, left to right:

Little River near Hahira (SR 122)
Little River near Hahira (SR 122)
Withlacoochee River above Valdosta (Skipper Bridge Road)
Withlacoochee River (Skipper Bridge Road)

Withlacoochee River near Foxborough (US 41)
Withlacoochee River near Foxborough (US 41)

Withlacoochee River near Quitman (US 84)
Withlacoochee River near Quitman (US 84)

You can easily see the rivers have peaked upstream at Hahira and Skipper Bridge, may be peaking at Foxborough, but the Withlacoochee is still rising downstream at Quitman.

-jsq

Flooding on the Withlacoochee?

Many of the same factors that cause the prolonged extreme drought we’ve been having (deforestation, impervious surfaces, climate change) also produce flooding when we get a little rain. The flooding map by NWS Advanced Hydrologic Prediction Service, Weather Forecast Office Tallahassee, FL, 2012-08-14 shows minor flooding on the Withlacoochee River at Skipper Bridge Road.

WTXL yesterday posted PR from Lowndes County, Georgia, Withlacoochee River under watch due to rising water, flood warnings,

LOWNDES COUNTY, Ga.—Due to rising waters and the issuance of a Flood Warning by the National Weather Service, Lowndes County Emergency Management continues to monitor rising water levels on the Withlacoochee River at the Skipper Bridge Road stream gauge site.

Currently, the water level stands at approximately 14.3 feet and is expected to crest this afternoon at approximately 14.5 feet.

While a flood warning is in effect, the only area flooded at these Minor Flooding of Withlacoochee River at Skipper Bridge Road, Lowndes County, Georgia levels are woodland areas near the river. Historically, flooding does not affect local roads and/or residences until water levels reach approximately 17 feet.

Lowndes County Emergency Management will continue to monitor conditions and additional updates will be distributed as new information becomes available. While there is no cause for immediate concern, citizens are encouraged to remain aware of their surroundings.

Residents may monitor local river levels by accessing real time stream gauge information by visiting the following link: water.weather.gov/ahps2/index.php?wfo=tae.

For more information, please contact Lowndes County Public Information Officer, Paige Dukes, 229-292-6142 or pdukes@lowndescounty.com.

Curiously, on the County’s own Press Releases web page, there’s no mention of this PR.

-jsq

 

Ponds for flood control and irrigation?

Build retaining ponds upriver to capture flood waters and use them for irrigation? That would be a start on some of the many water concerns. Tim Carroll sent the appended to a long list of people Sunday. -jsq
All,

Important news concerning storm water/flood water management in our area. As noted below in Larry’s email, much work has been done to find solutions. I made this presentation to both the local and state Chamber Governmental Affairs Council’s soliciting their support. There have also been numerous contacts with state and federal representatives concerning this issue.

As always, please let me know if you have any questions or comments.

Happy Independence Day,

Tim Carroll

From: Larry Hanson
Sent: Wednesday, June 29, 2011 4:10 PM
To: Tim Carroll
Subject: FW: Suwannee-Satilla Regional Water Plan Comments

Mayor and Council;

Any and all Georgians have the opportunity to comment on the proposed state water plan and specifically the Suwannee-Satilla Regional Water Plan that covers our region. As you know, I made a presentation to the regional water council late last year in Douglas regarding regional stormwater and the need to address this issue as part of the state water plan. The presentation was

Continue reading

Skipper Bridge Road bridge, Withlacoochee River

The old bridge got condemned during the great flood of April 2009.

Lowndes County is rebuilding the bridge over Skipper Bridge Road near the new school site. I think this is using FEMA funds.

It’s not clear that the new Staten Road bridge is high enough Continue reading

Uncontrolled growth and water problems

Daniel Mayer, November 2006
Maybe growth, growth, growth alone isn’t any better than jobs, jobs jobs alone, and water remains one of the main issues. Kay Harris wrote in the VDT 17 Feb 2011 that Aging infrastructure, growth, and other issues contribute to city’s sewer woes:
Valdosta Utilities Director Henry … Hicks addressed the sewage spills, saying they are caused by excess rain which overloads the Withlacoochee River Water Pollution Control Plant. He said growth along the river and throughout the regional watershed area has contributed to the amount of excess water running into the river.

“When you have all this growth and you create more impervious surface area (through paving and development), more and more water is running into the Withlacoochee. On average, the plant handles six million gallons a day and is equipped to accommodate twice that, but in recent rain events, we’ve gotten upwards of 15 million gallons extra in stormwater runoff and the system can’t handle that,” Hicks said.

Some of the comments on the VDT page are also interesting. Guest remarked: Continue reading