Tag Archives: Wind

Invent batteries to the price point of the electricity market —Donald Sadoway

MIT Prof. Donald Sadoway thinks he’s found a way to build electric-grid-scale batteries out of dirt.

Electric utilities complain solar and wind power are not baseload, capacity, energy sources because they are intermittent. You know, if they weren’t busy running up cost overruns that could easily exceed the entire annual budget of the state of Georgia, maybe the utilities could solve this problem. Meanwhile, Prof. Sadoway, instead of looking for the snazziest coolest most efficient new method of energy storage, defined the problem in terms of the market:

the demanding performance requirements of the grid, namely uncommonly high power, long service lifetime, and super low cost. We need to think about the problem differently. We need to think big. We need to think cheap.

Then he set parameters on the solution:

If you want to make something dirt cheap, make it out of dirt. Preferably dirt that’s locally sourced.

He cast about for possible precedents and found aluminum smelting gave him some ideas for using low density liquid metal at the top, high density liquid metal at the bottom, and molten salt in between. Choosing the right metals is the trick, which he thinks he’s found: magnesium at the top, and antimony at the bottom.

Is Sadoway right? Will his battery work at grid scale? I don’t know. But he’s asking the right questions, and it’s worth a try.

As Kyle Sager wrote for Heliocurrent 4 May 2012, Renewable Storage: Leave it to MIT,

Has Dr. Sadoway achieved the holy grail of renewable energy? Judge for yourself. Our attention is compelled by the degree of his certainty and the seeming simplicity of the approach. Watch MIT’s Donald Sadoway explain his vision here (link).

Seems to me there are at least two major approaches:

Continue reading

Will electricity demand increase?

Back in April Southern Company CEO Thomas A. Fanning gave yet another version of his stump speech that we saw at the shareholders’ meeting in May and that he’s video blogging on YouTube now. In April he emphasized a huge assumption with no evidence; an assumption that may just not be true.

National Energy Policy – Part 5 of 7 (30 April 2012)

This much we know: demand for electricity will increase. The Energy Information Administration projects an 18% increase in electricity demand nationally and in the southeast, we’re as expecting as much as a 25% increase over the next 20 years. So we know the need is real, immediate, and critical.

Really? Here’s recent electricity use and nearterm forcast by the U.S. Energy Information Administration:

Sure looks to me like there was a big dip in 2009, and projected use in 2013 is no higher than in 2007. What was that about “immediate”?

Now you may say, of course, that’s a recession. But what about this?

Continue reading

Why Energy Matters to You —Thomas A. Fanning

Since our coverage of the Southern Company (SO) shareholders meeting in May, SO CEO Thomas A. Fanning has started his own YouTube video series, “Why Energy Matters to You”, in which he tries to head off a real energy policy by advocating SO’s nuclear and coal strategy instead.

SO PR 28 June 2012, Southern Company Chairman Launches CEO Social Media Video Series,

Southern Company SO today unveiled the first in a series of CEO Web videos examining issues critical to the electric utility industry. The video series, “Why Energy Matters to You,” is available on YouTube and features Southern Company Chairman, President and CEO Thomas A. Fanning. Fanning announced the Web series during an appearance at the 2012 Aspen Ideas Festival in Aspen, Colo.

Here are his two episodes so far. His theme:

“I believe that every American deserves a supply of clean, safe, reliable, and affordable energy.”

Who could argue with that? It’s just SO’s ideas of how to do it that provoke some argument.

Here’s Part 1 of 2:

Why Energy Matters to You —Thomas A. Fanning Part 1 of 2

His question:

“How can better energy create more economic freedom for the American people?”

His answer is in Part 2 of 2:

Continue reading

Dear Southern Company: Green Energy Now! –Protesters

At yesterday’s Big Bets movie premiere, Southern Company doubled down and dug deeper in the hole.

Joeff Davis wrote for Fresh Loaf yesterday, Protesters picket utility’s Midtown film premiere, blast construction of new nuclear reactors

On the same day that tens of thousands of protesters rallied in Tokyo against the restart of Japan’s nuclear reactors, roughly 30 protesters chanted, marched, and handed out flyers today in Midtown to protest against Georgia Power’s construction of two new nuclear reactors in eastern Georgia. The two units, which are located about 175 miles from downtown Atlanta, are the first to be built in the United States in nearly three decades.

“Georgia Power is using our money to pay for something we don’t need, we don’t want and is killing us,” said Margie Resse as she handed out flyers outside the Fox Theatre. Southern Company, Georgia Power’s parent company, had reserved the historic Midtown venue to screen a documentary that it commissioned about the utility’s 100-year history for shareholders and executives.

The flyers claimed that Southern Company used “its notorious lobbying machine to

push a $2 billion rate hike” onto Georgia ratepayers to build “two risky nuclear reactors on the Savannah River,” which the groups say are months behind schedule and $900 million overbudget. The flyer urges ratepayers to refuse to pay a fee tacked on to utility bills that helps pay for the reactors’ construction.

Southern Company Spokesman Steve Higginbottom, standing just inside the Fox Theatre’s entrance and speaking barely above the protesters’ chants, said that Southern Company supports the rights of protesters but disputes their claims.

The “$900 million” figure cited by protesters, he said, has been alleged by Westinghouse, the manufacturer of the reactor, and Shaw, the project’s general contractor.

Um, Southern Company’s response is to talk about infighting among the consortium building the new nukes? SO could be digging themselves a hole deeper than the one the reactors sit in….

I do compliment Higginbottom and Southern Company on being consistently civil, however.

-jsq

Southern Company movie Big Bets at the Fox in Atlanta this afternoon

If you happen to be in Atlanta, there's a movie premiere this afternoon! Southern Company has made a movie out of its corporate biography, Big Bets, and is showing it today.

1:30 PM 16 July 2012
The Fox Theatre Atlanta
660 Peachtree Street NE
Atlanta, Georgia 30308

Oh, sorry, SO didn't send you a ticket? Well, I hear there will be people standing outside with signs starting around 1:30 PM. Maybe you'd like to join them. And if you're not in Atlanta, maybe you'd like to do something where you are.

Here's a preview of the movie, starring FDR: as the villain!

This appears to be the entire book online as a PDF. It starts in on FDR on page 100:

FDR had become known in utility circles as a “dangerous man” for advocating state ownership of power projects and denouncing the “sins of wildcat public-utility operators” and the “Insull monstrosity” with insinuations that all utilities were guilty of betraying the public's trust. He also proclaimed the rights of any community unhappy with its service to take over private utility operations and develop their own power sites—a “birch rod in the cupboard” to be used when good service was not provided by private companies.

Imagine that, generating your own community power! Imagine it, but you can't do it. Southern Company and Georgia Power fixed that in the 1973 Georgia Territorial Electric Service Act.

What you won't see in the movie or read about in the book, Big Bets, is much about the bet-the-farm risk of nuclear power (bond-rater Moody's phrase), or how much water nuclear uses, or the profit opportunity of renewable energy such as solar and wind power. You can see some shareholders ask SO CEO Thomas A. Fanning about some of those things in these videos from the shareholder meeting back in May. If you run into him at the movie premiere, maybe you can check in with him on whether any of his answers have evolved, for example, does he still think SO won't get to solar or wind power this decade? Or maybe you’d like to ask Southern Company some questions online.

-jsq

Fukushima children: 35.8% thyroid cysts (0.8% in control group)

ENENews reported today that Just 0.8% of children in 2001 Japanese control group had thyroid cysts or nodules — 36% in Fukushima study. Is that a risk we want in Georgia from the new nukes at Plant Vogtle? How about we deploy wind and solar instead, faster, cheaper, and on time, plus solar or wind spills do not cause thyroid cysts.

Now you may say there’s little chance of similar problems in Georgia, since Southern Company CEO Thomas A. Fanning assured us Plant Vogtle is 100 miles inland where there are no earthquakes. Still, the same could have been said of Chernobyl. And TEPCO back in 2001 reassured everyone that tsunamis were not a problem for Fukushima.

Economics, as in the stealth tax rate hike, $8.3 billion loan guarantee, cost overrun passthrough boondoggle sucking up money that could be going to make Georgia a world leader in solar and wind for jobs, energy independence and profit, is the main point. But let’s not forget the health risks of nuclear power, from Three Mile Island to Chernobyl to Fukushima. Or Southern Company’s Plant Hatch, for that matter, leaking radioactive tritium into the ground water 90 miles from here. No tsunami and no earthquake was required to produce that leak. It’s our money and our families’ health Southern Company is experimenting with.

-jsq

Sidewalk snaps up behind coal in Georgia: Snapping Shoals EMC drops Power4Georgians

Only a few months ago, Cobb EMC pulled out of Power4Georgians and their coal plant plans; now Snapping Shoals EMC does the same. The sidewalk is indeed snapping up behind coal in Georgia. As once again customers of an EMC decide to run for its board. Southern Company and Georgia Power, are you listening? Not just about coal; also about those new nukes.

The insurgent candidates have a facebook page, Smart Energy for Snapping Shoals.

PR yesterday from Georgians for Smart Energy, Snapping Shoals EMC Backs Away From Risky Coal Plant Venture

Continue reading

GA PSC Forum videos online now

I hear somebody asked about Georgia Power's Construction Work in Progress (CWIP) stealth tax charge to customers for Southern Company's new nukes at Plant Vogtle. Maybe some of these candidates for the Public Service Commission could help get Georgia Power and SO to stop suppressing solar and wind in Georgia, maybe even to lead the way.

GIPL wrote today,

Thanks to everyone who came out to our Political Forum on the Georgia Public Service Commission. We had a great turnout, and learned a lot about the 2012 candidates for the PSC.

This is a statewide election, so please share this video far and wide with your friends. The primary election will be held on July 31, and the PSC will also be on the ballot in November.

Participants in last night's forum included (from left to right) Republican Matthew Reid and Democrat Steve Oppenheimer, who are both challenging incumbent Republican Commissioner Chuck Eaton in District 3, and Republican Pam Davidson and Libertarian David Staples, who are running against incumbent Republican Commissioner Stan Wise in District 5.

Beth Bond from Southeast Green moderated the media panel featuring Kristi Swartz from the Atlanta Journal Constitution, Walter Jones from Morris News Service, and Jonathan Shapiro from WABE.

Georgia Interfaith Power & Light hosted this forum. Co-hosts included 14 local environmental, religious, and advocacy organizations, including Southeast Green, Georgia WAND, GA Sierra Club, Civic League of Regional Atlanta, Glenn Memorial UMC Environmental Committee, GreenLaw, Southeast Energy Efficiency Alliance, Common Cause, League of Women Voters, Georgia Watch, Ryan Taylor Architects LLC, Sustainable Atlanta, Regional Council of Churches of Atlanta, Inc., Trinity Presbyterian Church Sustainability Committee, and the Southern Alliance for Clean Energy.

Here's the video:

-jsq

Live streaming of Public Service Commission Forum tonight

All candidates for the Georgia Public Service Commission at a forum tonight, 7-9PM 12 July 2012. GA PSC is the body that says Georgia Power can charge its customers for cost overruns for the new nukes at Plant Vogtle; the new nukes that will suck up even more water and are already sucking up lots of money through the stealth tax Construction Work in Progress (CWIP) charge on Georgia Power customer bills. GA PSC did require Georgia Power to buy 50 MW of solar, but that’s pennies compared to the dollars Georgia Power and Southern Company are shovelling into that pit by the Savannah River. Who will stand up and say enough nuclear is too much, and let’s get on with solar and wind?

Georgia Interfaith Power and Light blogged today, PSC Debate Tonight,

Tonight, GIPL is joining forces with 14 local organizations to host a Political Forum with this year’s candidates for the Public Service Commission.

We’re having technical difficulties with the live web stream. We hope it will be up and running tonight, but if not, the debate will be posted online this week. You can check this website tonight at 7pm for live web streaming, or watch our twitter feed @GeorgiaIPL for updates.

When: Thursday, July 12, 7 – 9 p.m.
Where:
Glenn Memorial UMC’s Auditorium/Sanctuary
1660 N. Decatur Road
Atlanta, GA 30307

All four challengers in the 2012 race have confirmed their attendance. Participants

Continue reading

AP nuclear slant through omission

What's missing in AP's reporting and analysis of nuclear cost overruns?

AP published this Tuesday, News Guide: Nuclear industry facing cost pressures, perhaps as a companion to its story of the same day, Building costs increase at US nuclear sites. Like that story, the news guide is full of accurate and useful information about nuclear cost overruns, and even this good bit of analysis:

Q: Why do building costs matter to customers?

A: Because customers ultimately pay for the construction costs as part of their monthly power bills. The more a plant costs, the more customers will pay.

Yep, Georgia Power customers are already paying through that stealth tax, the construction work in progress (CWIP) charge for new nuke electricity they won't get for years if ever.

Yet something is missing. Can you spot it?

Hint:

Q: How does that compare with building coal- or gas-powered plants?

Good question, and AP correctly answers that nuclear plants are far pricier than coal or gas plants.

But are those three the only sources of energy? Where is the comparison to solar and wind power?

Well, maybe AP won't do it, but here it is already, Georgia Power deploys 1 MW solar; could have done 330 MW by now. Short version: for less than the amount of federal loan guarantees for Plant Vogtle, Southern Company could have built Georgia more solar energy production per capita than Germany, the world leader, has.

Why are we letting Georgia Power and the Southern Company pour our money down that pit near the Savannah River when they could be spending it to deploy solar and wind for more jobs, energy independence, and more profit for Georgia Power and SO? Oh, and clean air and plenty of clean water, too.

-jsq