Tag Archives: Valdosta

Packet: Family Ties tabled 4-0, Personal Care denied 3-1, Sewer System approved 4-0 @ ZBOA 2024-08-20

Hurricane Debby wrought confusion on the Valdosta-Lowndes Zoning Board of Appeals (ZBOA), causing a controversial variance request to be bumped back weeks or maybe longer.

The board packet materials for that item VAR-2024-07 are somewhat lacking, since there is no WRPDO Site Map for it, and while the Zoning Location Map shows a green area to the left, nothing on that map nor in the text says the green area borders the Little River.

[Collage @ ZBOA 2024-08-20]
Collage @ ZBOA 2024-08-20

A request for a variance about Family Ties Land Division was tabled because the September ZBOA meeting was postponed for two weeks because of the hurricane. The Meeting Results Summary says “(Tabled 4-0)” but it does not say until when.

According to Terry Richards, Valdosta Daily Times, August 22, 2024, Appeals board denies variance for group home,

— The board voted to table any action on a request for a variance on family ties land division for a property at 7365 Webb Hall Road until a later meeting.

Part of the concern over the variance concerned the timing of advertisement of the meeting. Thursday’s meeting was originally scheduled to be held Aug. 6, but was postponed two weeks due to the threat of Hurricane Debby.

As state law requires a 30-day notice of meetings of this sort, board members were concerned they needed to push action on this matter further out.

There were also concerns as to whether a misprint of an address in a published legal ad would affect the situation.

According to the City of Valdosta’s ZBOA web page “The ZBOA meets the first Tuesday of each month at 2:30 p.m. in the City Hall Annex Building, Multi-Purpose Room located at 300 North Lee Street.” That would seem to mean the next ZBOA meeting will be September 3. But that is less than 30 days from now. So maybe October 1. If that is the date of the October meeting. Continue reading

Videos: All Valdosta cases: 2 small and 1 big annexation and rezoning @ GLPC 2024-07-29

All the items were for Valdosta, and the Planning Commissioners unanimously recommended approval of all of them, two of them with conditions.

[Collage @ GLPC 29 July 2024]
Collage @ GLPC 29 July 2024

Six special conditions accompany the recommendation for the Bemiss Road Yazmin Saucedo storage facility and the “event center called the “Enchanted Hall” that specializes in weddings, quincenaras, and family reunions, with an anticipated overall seating capacity of about 160 people,”.

Several people spoke against the Bemiss Road Freeman Investments rezoning from R-P to C-N. Several people explained to them that if this rezoning did not pass, the owner could put up a three-story apartment building. The unanimous recommendation for approval came with a condition of a 6-foot opaque wooden fence between this property and the three it backs up on.

No conditions were recommended for the Southern Gateway Madison Highway rezoning and annexation south of the airport. I spoke to attorney Bill Nijem and Valdosta City Planner Matt Martin afterwards. There is indeed a pond in the middle of the part of the property south of Race Track Road SE. It’s not clear what will happen to it; it may be used as a detention pond. The eventual development of the property is as yet undecided. It’s also between the Withlacoochee and Alapaha River watersheds, and not well-connected to creeks, so probably not a problem.

Below are links to each LAKE video of each agenda item, with a few notes by John S. Quarterman, followed by a LAKE video playlist.

See also Continue reading

Videos: Special Called Meeting about Opioids Settlement 2024-08-12

It’s still not clear why it was urgent to have a Special Called Meeting about Opioids Settlements when a Regular Session was scheduled for the next day of the Lowndes County Commission.

Here are LAKE videos of each agenda item, with a few notes, followed by a LAKE video playlist.

[Collage @ LCC 12 August 2024]
Collage @ LCC Special Called Meeting 12 August 2024 Continue reading

Videos: Appointments to DFACS & VLPRA, Beer and Wine, Pump Station and Forklift @ LCC Work 2024-08-12

There was some discussion in the 7-minute Monday morning Work Session of the Lowndes County Commission. They vote today (Tuesday) at 5:30 PM.

[Collage @ LCC 12 August 2024]
Collage @ LCC 12 August 2024

Regarding the Love’s Travel Stop Beer and Wine license, no public hearing is necessary if the license is for consumption off premises.

On 7.a. Pump Station Rehab, Chairman Bill Slaughter wanted to know how many lift stations the county has. Continue reading

Videos: Animal Policies, Wetland and stream credits for Kinderlou-Clyattville Road, UPS, Fire Station alterations, Moody Hydrant, Grassy Pond Utilities @ LCC Regular 2024-07-23

Five citizen speakers said spending more money on an Animal Shelter building was not a solution to a problem that needs different policies: Burton Fletcher, Nancy and Danny Griffin, Janice Monaco, and Tara Parker.

[Collage @ LCC 23 July 2024]
Collage @ LCC 23 July 2024

All the voting agenda items sailed through unanimously, including the Wetland and Stream Credits for the Kinderlou Clyattville Road Paving and Drainage project. Also, as staff recommended, they rejected as too high the bid for the 6.b. Moody Hydrant Replacement Project.

Commissioner Scottie Orenstein asked if the architect had given a budget estimate for 6.a. Alterations to Lowndes County Fire Station #10. Engineering Services Director Chad McLeod said no, but they had done an internal estimate and the project is within the estimated range. Chairman Bill Slaughter added that the project is within budget.

A Commissioner, I think Mark Wisenbaker, wanted to know whether the county had had experience with the low bidder for 6.c. Grassy Pond Utilities Replacement. Answer: yes, on the LAS project, and they’re well known in the Waycross and Ware County area.

I’m still mystified why Moody AFB doesn’t count as a stakeholder.

I had some issues with the camera direction on 5.c. Vertiv Service Contract, UPS, 911 Center, Valdosta – Clyattville Tower. The battery ran down and I lost the beginning of 5.d. Quit-Claim Deed of Abandoned Section of Race Track Road SE. Gretchen is back and will handle this coming week’s videoing.

Below are links to the LAKE video of each agenda item, with a few notes by John S. Quarterman, followed by a LAKE video playlist.

See also Continue reading

Packet: Appointments to DFACS & VLPRA, Beer and Wine, Pump Station and Forklift @ LCC 2024-08-12

Update 2024-08-13: Videos: Appointments to DFACS & VLPRA, Beer and Wine, Pump Station and Forklift @ LCC Work 2024-08-12.

Update 2024-08-11: Special Called Meeting about Opioids Settlement @ LCC 2024-08-12.

Two appointments, an alcohol license, and almost $2 million in Utilities Department bids are on the agenda for the Lowndes County Commission Work Session Monday morning at 8:30 AM. They vote Tuesday at 5:30 PM.

[Appointments to DFACS & VLPRA, Beer and Wine, Pump Station and Forklift, Force Main sewer system @ LCC 2024-08-12]
Appointments to DFACS & VLPRA, Beer and Wine, Pump Station and Forklift, Force Main sewer system @ LCC 2024-08-12

Three bids were received for the Utilities Department Forklift, with low bid at $18,100.

Only one bid, for $1.792 million, was received for the repair and rehab at 14 lift stations, out of 4 contractors who attended the mandatory pre-bid meeting. Lift stations affected are Bevel Creek, Whitewater Road, US 84, Francis Lake, Old Pine, Davidson Road, Miller Farms, Moody Family Housing, Skipper Bridge, Union Road, Kinderlou Clubhouse, Griffin, Saddle Bags, and Stone Creek.

Cost What
$1,792,027.8.00Pump Station Rehab
$18,100.00Utilities Forklift
$1,810,127.8.00Total

 

VALORGIS shows Lowndes County’s sewer lines if you turn on the Water Sewer Service Areas layer, and within that Lowndes County Sewer Lines Force Main and Gravity. Be sure to turn off Water Lines and Valdosta Sewer Line.

In case anybody doesn’t know, Lowndes County’s sewer system is separate from Valdosta’s sewer system, and has about 10% of the capacity of Valdosta’s.

Also, for some years Lowndes County has been repairing parts of its sewer system before they break. Although I hear persistent rumors that there have been unreported leaks.

[Map: Lowndes County sewer system (green lines) --VALORGIS]
Map: Lowndes County sewer system (green lines) –VALORGIS

Lonnie Denton wants to be reappointed to the Lowndes County Division of Family and Children Services (DFACS) Board and DFACS County Director Gail Finley recommends that.

Bubba Highsmith wants to be reappointed, and George Foreman also wants to be appointed, to the Valdosta-Lowndes County Parks and Recreation Authority (VLPRA) Board.

The beer and wine license request is for a new establishment, Love’s Travel Stop #550, 2319 Old Clyattville Road, Valdosta, GA.

Here is the agenda.

The board packet, received in response to a LAKE open records request, is on the LAKE website.

LOWNDES COUNTY BOARD OF COMMISSIONERS
PROPOSED AGENDA
WORK SESSION, MONDAY, AUGUST 12, 2024, 8:30 a.m.
REGULAR SESSION, TUESDAY, AUGUST 13, 2024, 5:30 p.m.
327 N. Ashley Street – 2nd Floor

Continue reading

Special Called Meeting about Opioids Settlement @ LCC 2024-08-12

Update 2024-08-15: Videos: Special Called Meeting about Opioids Settlement 2024-08-12.

According to the calendar on lowndescounty.com there’s a Special Called Meeting at 9AM Monday, August 12, 2024.

[Special Called Meeting, 9AM Monday 2024-08-12, No agenda, but about Opioids Settlements, Lowndes County Commission]
Special Called Meeting, 9AM Monday 2024-08-12, No agenda, but about Opioids Settlements, Lowndes County Commission

There’s no agenda on that website.

Apparently if you signed up to get notices of meetings, the email you get says this meeting is about the Opioids Settlement.

What could be so urgent that the Commissioners can’t wait until the Regular Session the next day is not clear.

Maybe there’s a deadline? Not clear why staff could not predict such a deadline and schedule earlier.

There’s nothing in the main page on the Georgia Attorney General’s website about any 2024 deadlines: National Opioids Settlements – Information for Georgia Cities and Counties.

Maybe the county will tell us Monday at 9AM what’s going on and why it’s so urgent.

-jsq

Investigative reporting costs money, for open records requests, copying, web hosting, gasoline, and cameras, and with sufficient funds we can pay students to do further research. You can donate to LAKE today!
http://www.l-a-k-e.org/blog/donate

Videos: Wetland and stream credits for Kinderlou-Clyattville Road, UPS, Fire Station alterations, Moody Hydrant, Grassy Pond Utilities @ LCC Work 2024-07-22

Update 2024-08-11: Videos: Animal Policies, Wetland and stream credits for Kinderlou-Clyattville Road, UPS, Fire Station alterations, Moody Hydrant, Grassy Pond Utilities @ LCC Regular 2024-07-23.

The Lowndes County Commissioners and staff were surprisingly inquisitive at yesterday morning’s Work Session. They vote this evening at 5:30 PM.

There was some discussion on 6.a. Alterations to Lowndes County Fire Station #10, which is the main station east on US 84.

[Collage @ LCC 22 July 2024]
Collage @ LCC 22 July 2024

About the 5.a. Purchase of Wetland Credits for PI#0016278 Kinderlou Clyattville Road, Gretchen noted, “There was a brief discussion of wetland credits and how they are calculated by the Army Corps of Engineers. The calculation is now cumulative to the project, not at each individual site. In my opinion, this is a good thing as a project with a lot of “little” encroachments now does not get a pass.

They also discussed the less expensive 5.b. Purchase of Stream Credits for PI#0016278, Kinderlou Clyattville Road.

Moody AFB is going back to the drawing board for the Continue reading

All Valdosta cases: 2 small and 1 big annexation and rezoning @ GLPC 2024-07-29

On Bemiss Road, the storage facility and the “event center called the “Enchanted Hall” that specializes in weddings, quincenaras, and family reunions, with an anticipated overall seating capacity of about 160 people,” seem unremarkable in next week’s agenda for the Greater Lowndes Planning Commission (GLPC).

[Two small Valdosta items and an annexation and rezoning @ GLPC 2024-07-29]
Two small Valdosta items and an annexation and rezoning @ GLPC 2024-07-29

For the Southern Gateway annexation and rezoning south of the airport, you can see a pond in the Aerial Location Map. Continue reading

Packet: Wetland and stream credits for Kinderlou-Clyattville Road, UPS, Fire Station alterations, Moody Hydrant, Grassy Pond Utilities @ LCC 2024-07-22

Update 2024-07-23 Videos: Wetland and stream credits for Kinderlou-Clyattville Road, UPS, Fire Station alterations, Moody Hydrant, Grassy Pond Utilities @ LCC Work 2024-07-22.

Update 2024-07-23: Southern Gateway LLC annexation, rezoning, and aquifer recharge zone on Race Track Road SE, in All Valdosta cases: 2 small and 1 big annexation and rezoning @ GLPC 2024-07-29.

The ongoing Kinderlou Clyattville Road Paving and Drainage Improvements are getting both wetland and stream credits.

[Wetland & stream credits for Kinderlou-Clyattville Road, 2 Moody AFB projects, UPS, Fire Station alterations @ LCC 2024-07-22]
Wetland & stream credits for Kinderlou-Clyattville Road, 2 Moody AFB projects, UPS, Fire Station alterations @ LCC 2024-07-22

Something that seldom happens: staff recommends rejecting a bid, this one for the Moody Hydrant Replacement Project, because the one bid “far exceeded the budgeted amount for this project.”

Staff got four bids for the Grassy Pond Utilities Replacement and recommend the low bid for almost a million dollars.

Cost What
$995,604.00Grassy Pond Utilities Replacement
$891,210.00Moody Hydrant Replacement Project
$362,662.00Alterations to Lowndes County Fire Station #10
$59,220.00Purchase of Stream Credits for PI#0016278, Kinderlou Clyattville Road Paving and Drainage Improvements
$21,389.9.00Vertiv Service Contract for the UPS at the 911 Center, Valdosta Tower and Clyattville Tower Work/Regular
$10,800.00Purchase of Wetland Credits for P1#0016278 Kinderlou Clyattville Road Paving and Drainage Improvements
$2,340,885.9.00Total

Why is the Lowndes County Commission approving bids for these two Moody AFB projects when, according to the ULDC, Moody AFB is not a “stakeholder” and was not even mentioned in the previous County Commission Regular Session as getting drafts or meetings about changes to the ULDC?

Don’t get me wrong. I think Moody needs fire hydrants and Grassy Pond needs utilities repaired after hurricane of last fall. And Moody needs the wastewater treatment plant that the county now runs. I’m just mystified why Moody AFB doesn’t count as a stakeholder.

The bulk of this week’s board packet consists of three contracts for Vertiv Service Contract for the UPS at the 911 Center, Valdosta Tower and Clyattville Tower, each a dozen pages long, with only two pages each different: order number on one page, and site number, address, and a table of what is being bought for that site and for what amount on the other.

Here is the agenda.

The board packet, received in response to a LAKE open records request, is on the LAKE website. We also got a copy of the draft minutes for the previous Planning Commission meeting. I don’t know why that was included in response to a request for County Commission packet materials, but we’re publishing it anyway.

LOWNDES COUNTY BOARD OF COMMISSIONERS
PROPOSED AGENDA
WORK SESSION, MONDAY, JULY 22, 2024, 8:30 a.m.
REGULAR SESSION, TUESDAY, JULY 23, 2024, 5:30 p.m.
327 N. Ashley Street – 2nd Floor

Continue reading