Tag Archives: Tim Carroll

2013 Southern Hospitality Workcamp was a huge success –Tim Carroll

Received today. -jsq

All,

I want to share some good news from our recent Mayor Council public hearing —

The 2013 Southern Hospitality Workcamp was a huge success. This program, now in its’ 8th year brought 212 young “campers” from around the country into our community.

They made badly needed repairs to 18 owner occupied homes. This brings the total number of homes repaired to 275. Lowes RDC once again stepped up and provided all the materials for which we are truly grateful.

The value of the labor and materials now is in excess of $1.5M. I also want to say thank you to the Valdosta City School system for once again opening up Valdosta Middle to house the campers during their stay.

The joy I witnessed in these home owners faces was especially touching. The hard work of Continue reading

Watershed meeting organized by Army Corps of Engineers

The U.S. Army Corps of Engineers (USACE) didn’t know there was a large water problem hereabouts, but now they do, and they want to take a watershed-wide approach, from the headwaters to the Gulf of Mexico, including both surface water and aquifer issues, perhaps starting with redrawing FEMA’s flood maps, and maybe even including once again funding the state water council.

Thursday 11 April 2013 there was a rather large governmental meeting organized by USACE in response to the City of Valdosta’s request of 11 March 2103. Yesterday, Valdosta City Council District 5 Tim Carroll sent the appended list of attendees, augmented by a conversation with him on the phone 13 April and a blog comment by him later that same day on the original post on the WWALS blog, in which he also remarked:

Very good preliminary meeting that hopefully will yield real action on our region wide water issues. Thanks for sharing this info with WWALS.
We know little else, because no media or private citizens were invited.

  • USACE Savannah office: Jeff Morris, Georgia Silver Jackets Coordinator and Beth Williams, Hydraulic Engineer
  • USACE Jacksonville office: David Apple, Chief, Watershed and Restoration Planning Section
  • GADNR: Christopher Hill and Tom Shillock, GAEPD Floodplain Management Unit
  • GEMA: Dee Langley, Planning Program Manager and Terry Lunn, Director, Hazard Mitigation Division
  • GEMA: Gary Rice – Regional Field Coordinator
  • USGS: Brian McCallum, Supv. Hydrologist/ADir and Keith McFadden, Physical Scientist
  • FEMA Region 4: Susan Wilson, CFM, Floodplain Management and Insurance Branch Chief and Janice Mitchell, Insurance Specialist and Lender Compliance

Those state and national agencies were brought by:

Continue reading

Who’s inaccurate: VDT, Valdosta, GEFA, Chamber, County?

Both Chamber of Commerce Chair Myrna Ballard and Lowndes County Manager Joe Pritchard say the VDT is inaccurate. The VDT took offense at Ballard’s assertion. Which do you believe? I believe I’d like to see the evidence, not just the VDT’s assertions. And this junior high school cat fight the VDT insists on is not helping fix the real problem with water and wastewater in Valdosta and Lowndes County: the widespread and longterm damage to our watersheds that turned a normal rain in 2009 into a 700 year flood, and caused another flooding of the Withlacoochee Wasterwater Treatment Plant this year. I’m all for investigative reporting, but I have not yet once seen the VDT investigate the real underlying issues of longtime clearcutting and building of roads subdivisions, and parking lots without adequate consideration of water flows.

The VDT front page today has yet another story attacking the City of Valdosta, Loan info from GEFA contradicts City: $11 million awaits disbursement, loan amounts don’t match. I can’t make much sense out of it, because while Jason Shaefer has dug up a lot of interesting information, he doesn’t include dates for much of the financial detail he attributes to GEFA. Let’s see the VDT publish the documents they are referring to. The city does publish its Comprehensive Annual Financial Reports. The VDT has a website, and could publish whatever records it got from GEFA, which after all were produced using our tax dollars, and are therefore public records. Or if the documents are somewhere on GEFA’s website, the VDT could publish links to the specific documents. The VDT did publish a timeline of correspondence with the City about loans, so it could just as easily publish the GEFA documents and its own page-by-page and chart-by-chart comparison so we could all see for ourselves.

The VDT prepended this blurb to its timeline:

It has come to the attention of the Times that the Chamber of Commerce has called a special meeting on Tuesday to address what COC Pres. Myrna Ballard terms as “damage to our community’s reputation” due to the stories that have appeared in the newspaper. The invitation for the 9 a.m. meeting at the Chamber office was extended to only a select group of Chamber members, no media, and states that Mayor John Gayle and City Manager Larry Hanson will explain the city’s financial status. The Times takes very seriously the implication that the newspaper has written anything that is “inaccurate,” as stated by the Chamber. As such, the Times has chosen to show the public the information provided to the newspaper in response to questions posed to the City, with no editing, to allow citizens the opportunity to see for themselves if what the Times has written is an “inaccurate” portrayal of the city’s financial status.

What was that again?

The Times takes very seriously the implication that the newspaper has written anything that is “inaccurate,” as stated by the Chamber.

How about as stated by Lowndes County Manager Joe Pritchard? In a letter from him to me of 29 January 2013 Pritchard stated:

Continue reading

Valdosta PR about wastewater issues

The city of Valdosta responds. I have decorated this PR with a few images with links, and a few comments after it. -jsq

Mayor and Council Address Recent Wastewater Issues,

The Valdosta Mayor and City Council are committed to providing quality municipal services that meet the expectations of our citizens. In addition to providing fire and police protection and other beneficial quality of life services, the city leadership is equally committed to providing adequate water and wastewater treatment services to its citizens, maintaining a functioning sewer collection system and discharging treated water in an environmentally responsible manner.

Recently, citizens have been inundated with information about the current state of the city’s wastewater treatment plant and sewer collection system, as well as the decisions made during the recent flood event. The following information is provided to explain the recent event and to help citizens better understand these important issues and the dedicated work of their elected officials and municipal staff.

THE SITUATION

Continue reading

Spilling Sewage Pictures by Gabe Fisher 3:30 PM 24 March 2013

Received yesterday. -jsq

Date: Sun, 24 Mar 2013 15:43:47 -0400

Manhole

All, just so everyone is on the same page- the sewer line is currently spilling sewage. It just started at mu house but has been going strong at sugar creek for awhile by the looks of it. Here are some current pictures as of 3:30 today. It will get worse until the river crests..

Gabe

Continue reading

More Valdosta wastewater correspondence

Some interesting questions have come up in Gabe Fisher's continuing correspondence with the City of Valdosta about sewage in his back yard and under his house, while City Council Tim Carroll continues to respond, both copying a long list of people.

From: Gabe Fisher
Date: Mon, 4 Mar 2013 14:23:12 -0500

All, I appreciate the update on where the city stands on moving the sewer all together—I just wish we had been kept informed of the plans over the last 4 years. Living with the *real* threat of flooding is stressful enough, add in the guaranteed associated sewage spill is more than I can handle.

I also appreciate the city workers spreading lime and working on the sewer line behind my house today. But I have questions—What about the sewage in my yard and under my house? Is this my responsibility?

Thanks, Gabe

Tim Carroll responded with a couple of suggestions:

Continue reading

Water Plant Planning —Henry Hicks @ VCC 2013-03-07

Henry Hicks Valdosta Utilities Director Henry Hicks gave a detailed history of flood control projects and work on the Withlacoochee Waste Water Processing Plant at the Valdosta City Council Meeting last night during the "Manager's Report" section of the agenda. Several Council members expressed their distaste for the VDT’s recent reporting on the subject, and thanked Hicks and other city employees for their work.

$40 million already spent Hicks said they had spent $4 million on repairs to the Withlacoochee plant, and that didn't include the $40 million they'd already spent on upgrades in general. Also, it took three days to build the berm around the plant in 2009, and FEMA wouldn't approve any improvements to it.

He said he would Continue reading

Valdosta Neighborhood Covered In Raw Sewage —WCTV

Valdosta Flooding As he indicated yesterday, Gabe Fisher got his sewage-covered neighborhood on WCTV last night.

Greg Gullberg wrote for WCTV yesterday, Valdosta Neighborhood Covered In Raw Sewage,

Chad Harrison After days of torrential rain, the same rain that caused the rivers to flood, the sewage pump has been overwhelmed in the Meadow Brook Subdivison just off Gornto Road.

“You know how bad it smells in a bathroom when someone goes in and uses a public restroom. Multiple that ten times,” said Chad Harrison, a local resident.

Greg Gullberg The whole area behind their houses is just covered in raw sewage. Your boots sink down into it with every step. We’re talking everything from human waste, to toilet paper, to hygiene products and a whole other list of things that are just too graphic to mention.

“Probably about 12 to 14 inches of raw sewage,” said Harrison. “It’s just everywhere. It’s all up and down the creek. It’s all behind everybody’s houses.”

House There’s more in the WCTV story, such as that the city has included neighbors in meetings, but has not yet changed anything. The city’s PR about the flooding says:

Continue reading

Withlacoochee Wastewater Treatment Plant Fully Operational

Received today. -jsq

FOR IMMEDIATE RELEASE

Release #03-13-02
March 3, 2013

Withlacoochee Wastewater Treatment Plant Fully Operational

Withlacoochee Wastewater Treatment Plant At approximately 1:30 p.m. today, March 3, the Withlacoochee Wastewater Treatment Plant was brought online and returned to normal operation, after a loss of function for only three days compared to the nine days of complete loss of function experienced in the flood of 2009. Today, the river receded to the point where the temporary by-pass pumps could be connected to the existing valves. The system was turned on, became fully operational and began full treatment capabilities.

Lessons learned from the 2009 flood resulted in proactive measures which include the following:

  • The installation of bypass pumps, pipes and valves to utilize in the event of an emergency or act of God.
  • In 2009, the berm only protected the pump station, which did not prevent flooding of the chemical building, the chlorine contact building, the filters and the belt presses. The plant's electrical system was destroyed in the flooded area and the filters and belt presses were inoperable.
  • In this event, the electric system, chlorine cylinders, de-chlorination system and all flooded areas were turned off to avoid the damage that was experienced in 2009.
  • In this event, the biological, natural occurring bacteria that are used in the treatment process were saved so that the system could treat wastewater immediately when it was turned back on. In 2009, the natural occurring bacteria were washed out of the plant as a result of the continuous pumping during the event.
  • In this event, the plant was fully operational in three days. In 2009, the plant had a complete loss of function for nine days and was not fully operational for over a month.

The city's drinking water supply is in no way

Continue reading

The WWTP is firing back up as we speak. —Tim Carroll

Tim Carroll’s response to Gabe Fisher. -jsq

Gabe,

I know you are frustrated and pissed. My hope was with the info below all could see the city has not just been idly sitting by. What has been so frustrating for us is that our biggest problem is outside of the city limits.

As discussed below, we are about 90% complete on the design for the big force main project. Once completed it will eliminate the sewage spills during high rain events in your neighborhood.

Just spoke with Larry Hanson and the WWTP is firing back up as we speak. Soon you should start seeing the current spills end as the system is brought fully back up and running.

Something I might add we could not have done so quickly had we not taken the steps we did these past several days.

In regards to clean up —

Continue reading