Georgia Power, nuclear buggy whip manufacturer

I think of Georgia Power more as like IBM when minicomputers came out. IBM built bigger mainframes. The Internet started to spread, and IBM pushed its own proprietary SNA network. (Remember SNA? I didn’t think so.) Then PCs came out, and IBM layoffs started….

Glenn Carroll wrote for Georgia Wand today, Georgia Power Stuck in a Nuclear Jam,

Everybody except for Georgia is jumping on the wind and solar bandwagon, but Georgia Power is side-lined in a nuclear jam like a horse-buggy manufacturer at the dawning of the Ford assembly line.

The white area on that map is for states that have no standards or goals for renewable energy.

Remember Georgia Power is the biggest part of its parent, The Southern Company, and the nuclear units at Plant Vogtle (operating and planned) are actually owned by another offshoot of The Southern Company. According to Southern Company’s webpage, Megawatts and Markets,

Southern Company regulated regional electric utilities serve a 120,000-square-mile territory in Alabama, Florida, Georgia, and Mississippi. Our competitive generation business extends to markets in six southeastern states.

It’s interesting how similar the Southern Company’s markets are to the states in that white southeast no-renewable-energy-portfolio area!

-jsq

Transparency is key —Steve Kalland of NCSC

The earth receives enough energy from the sun in one hour to power the whole world for a year, reminded Steve Kalland of the North Carolina Solar Center (NCSC) at the Southern Solar Summit. So how do we get solar energy deployed? Kalland said transparency is key.

Other speakers had said you could have too much transparency, but Kalland pointed out that it was only through a hearing that North Carolina found out a major power company was going to use up its solar energy credits years ahead of schedule, and without transparency there couldn’t be real competition because the customers wouldn’t know who had which prices.

What else does it take to make a state competitive in solar? Kalland discussed this table (reformatted here from the copy of his presentation he gave me):

Foundational Steps to Focus on Solar

Installed Capacity Manufacturing
Interconnection Standards

Base Resources (economic or voices)

Early Adopters
Military or Large Federal
High Tech Firms
Corporate Greens
University Partnership Opportunities

Existing presence of businesses in multiple fields (diversification)
He said a lot more, but that’s a very interesting table to consider not only for a state, but for a region, like south Georgia, or a small metro area, like Valdosta MSA.

I know some people will react with: “but VSU is not a research university!” Nope, but this could be a way to add some research capacity to VSU.

-jsq

“Georgia’s EPA standards are a lot lower than other standards”

I didn’t get this questioner’s name. He wanted to know:
Georgia’s EPA standards are a lot lower than other standards and lower than federal EPA standards that are coming along. My question is what will the plant do when these new standards come along?
A: Don’t know what you got; probably didn’t include studies. GA EPD issues a permit.
No answer about when new standards come along.


Video by Gretchen Quarterman of 6 Dec 2011 VLCIA biomass event
for LAKE, the Lowndes Area Knowledge Exchange

-jsq

Seth Gunning LTE in the VDT

This is the text of Seth Gunning’s letter to the editor that the Valdosta Daily Times printed on 20 Dec 2010. Here’s video of the referenced air quality permit hearing. -jsq
Recently on Thursday December 16th, State Judge Ronit Walker denied air quality permits for a proposed coal plant in Sandersville, Georgia. Judge Walker cited the Georgia Environmental Protection Divisions failure to properly review permits, and their lack of enforcement of basic Clean Air Act standards for several hazardous emissions.

Flashback to April 27th in Valdosta Georgia when Environmental Protection Division Air Branch Manager Eric Cornwell openly admitted to having NOT READ the air permit application for Wiregrass Biomass LLC’s proposal to build a hotly contested 40mw power plant&emdash; during a Valdosta EPD hearing meant to evaluate those permits.

Today, the Valdosta Industrial Authority is hazardously entrenched

Continue reading