Tag Archives: SB 31

Already: Solar grid parity without subsidies in India and Italy

Solar power is going so well worldwide that Deutsche Bank has just increased its projections for global demand, noting that India and Italy have already in 2013 reached grid parity without subsidies with other sources of energy, and it expects the rest of the world to follow as early as 2014. The big winner is rooftop solar. Is Georgia paying attention?

Becky Beetz wrote for Global PV 26 February 2013, Deutsche Bank: Sustainable solar market expected in 2014,

Buoyed by bullish demand forecasts, and increasing utilization rates and pricing, Deutsche Bank forecasts a solar market transition from subsidized to sustainable in 2014. Italy REC solar photovoltaic plant

The German bank has raised its 2013 global solar demand forecast to 30 GW — representing a 20% year-on-year increase — on the back of suggestions of strong demand in markets including India, the U.S., China (around 7 to 10 GW), the U.K. (around 1 to 2 GW), Germany and Italy (around 2 GW).

Rooftop installations are, in particular, expected to be a main focus, says Deutsche Bank. A trend for projects being planned with either “minimal/no incentives” has also been observed, despite the belief that solar policy outlooks are improving, particularly in the U.S., China and India, and “other emerging markets”.

More analysis by Jeff Spross in ThinkProgress 3 March 2013, Solar Report Stunner: Unsubsidized ‘Grid Parity Has Been Reached In India’, Italy–With More Countries Coming in 2014.

As Renew Economy also points out, this is the third report in the past month

Continue reading

Levy Co. FL nuke likely not to be built

Cost already sunk Kewaunee, Calvert Cliffs, Crystal River, and are gnawing away at San Onofre: now it looks like new owner Duke is not likely to build Progress Energy's Levy County, Florida reactor. All that plus even in Georgia, even against all-powerful Georgia Power, there's a reaction against the cost of the always-later always-more-expensive new nukes at Plant Vogtle on the Savannah River. A reaction that's getting written up in the Valdosta Daily Times.

In the VDT today from AP, Some leaders souring on nuclear power costs. I'm quoting from the abcNews version because it includes the author's name, Ray Henry, and the original date, 3 March 2013. I added all the links and images.

As the cost of building a new nuclear plant soars, there are signs of buyer's remorse.

The second-guessing from officials in Georgia and Florida is a sign that maybe the nation is not quite ready for a nuclear renaissance. On top of construction costs running much higher than expected, the price of natural gas has plummeted, making it tough for nuclear plants to compete in the energy market.

In Georgia last week, Southern Co. told regulators it needed to raise its construction budget for Plant Vogtle in eastern Georgia by $737 million to $6.85 billion. At about the same time, a Georgia lawmaker sought to penalize the company for going over budget, announcing a proposal to cut into Southern Co.'s profits by trimming some of the money its subsidiary Georgia Power makes.

And Southern Company and Georgia Power slipped the Plant Vogtle schedule still more, from 15 to 19 months late.

The legislation has a coalition of tea party, conservative and consumer advocacy groups behind it, but faces a tough sale in the Republican-controlled General Assembly. GOP Rep. Jeff Chapman found just a single co-sponsor, Democratic Rep. Karla Drenner.

That's HB 267: Financing costs; construction of nuclear generating plant. And AP failed to mention Georgia Sierra Club's support for HB 267.

As a regulated monopoly, Georgia Power currently earns about 11 percent in profits when it invests its own money into power projects. Chapman's legislation would reduce those profits if the nuclear project is over budget, as is the current projection.

In Florida, there's a move to completely eliminate Construction Work in Progress (CWIP) such as is being used in Georgia to pre-fund the new Plant Vogtle nukes.

In Florida, lawmakers want to end the practice of utilities collecting fees from customers before any electricity is produced.

Florida only recently got CWIP, but Progress Energy has been quick to profit by it:

Continue reading

HB 267 Would Limit Georgia Power’s Profits on Vogtle’s Cost Overruns —GA Sierra Club

There’s still time to contact your state legislators about stopping Georgia Power profitting from cost overruns on the new nukes at Plant Vogtle. Georgia Sierra Club spells out why.

Georgia Power’s expansion at Plant Vogtle will bring us power that is dangerous, expensive and unnecessary.

You may remember a controversial bill the Georgia Legislature approved in 2009, SB 31, the Nuclear Construction Work in Progress (CWIP) bill, which forces Georgia Power ratepayers to pay the financing costs during construction, rather than over the life of the plant. Large users of electricity are exempt from the charge, but residential and mom and pop businesses have been paying for two years.

Even after that sweetheart deal, the Public Service Commissioners scrapped their staff proposal to stop the company from profiting on cost overruns for the project after they top $300 million.

The most recent reports from the independent monitor established by the PSC says

that the project is months behind and as of December, $88 million over budget. Georgia Power gets to earn 11.15% return on all expenses approved by the PSC, so the more they have to spend, the more they get to make and the more ratepayers get to pay!

Putting the profit issue aside for the moment, if the Georgia PSC ever decided to disapprove cost overruns, Georgia Power could take a page from the Mississippi Power playbook and just get the Legislature to let them issue bonds to pay for the work.

HB 267 by freshman Rep. Jeff Chapman excludes the collection of any profits on cost overruns beyond the $6.4 billion the Public Service Commission has approved. The bill is co-sponsored by Avondale Estates Democrat Karla Drenner, who is a member of the Utilities Committee, to which the bill was assigned. Passage of this bill would provide an incentive for Georgia Power to keep expenses down at Vogtle, something that SB 31 failed to do.

It isn’t fair for Georgia Power to profit to the tune of over 11% on delays, overruns and mismanagement, so ask your State Representative to support HB 267.

-jsq

Renewable energy much needed in Georgia —John S. Quarterman

My op-ed in the VDT today; I’ve added links, plus some more after the op-ed.

Finally! Kewaunee, Calvert Cliffs, and now Crystal River permanently closing say it’s time for Georgia to stop wasting money on Southern Company’s already over-budget and increasingly-late nukes and get on with solar power and wind off the coast: for jobs, for energy independence, and for clean air and plenty of clean water.

February 2013:
Duke Energy is closing the Crystal River nuclear reactor (Tampa Bay Times, 6 Feb 2013), 160 miles south of us, because nobody wants to pay to fix it: between “$1.5 billion and $3.4 billion, plus what it costs to buy power to replace what Crystal River would have produced while it is being repaired” [Charlotte Business Journal, 11 Jan 2013].
November 2012:
NRC terminated Maryland’s Calvert Cliffs 3 (NRC 1 Nov 2012) after Constellation Energy dropped out because the cost “is too high and creates too much risk for Constellation” [Bloomberg 10 Oct 2010].
Continue reading