Tag Archives: Pollution

Circular wastewater firing squad continues

The VDT's Sunday front page was covered with wastewater stories, continuing the circular firing squad of the local powers that be. Meanwhile in Dublin, GA, they're breaking ground for solar panels at the local high school, using a bond financing model that we could use here, if local leaders would look up.

In addition to some detail about the city's FEMA application and following up on flooded yards, the VDT followed up on its EPD and EPA scrutiny story with one saying City received help from EPD to keep EPA away. It's good the VDT is covering these issues, but it's still leaving out important parts of the local water story.

Apparently firing back at Thursday's Valdosta City Council session, perhaps especially Robert Yost's very pointed criticisms of the VDT, the VDT concluded its rather rich Sunday editoral:

City leaders, please, no more of the blame game. The citizens of this community are imploring you to just accept responsibility and fix it.

Yet the VDT has spent the last week blaming the city, and has accepted no responsibility for its own role, or that of its editor, Kay Harris, in the recent loss of the SPLOST referendum that would have further funded wastewater work in Valdosta.

Now, I agree with the VDT that Continue reading

Videos: Rezoning, two grants, fire, water, diversity and transparency @ VCC 2013-03-07

Still more about the recent flooding and water issues in these videos of the 7 March 2013 Valdosta City Council Regular Session, by City Manager Larry Hanson, Council Robert Yost excoriated the VDT, former City Engineer Von Shipman defended the city. Multiple citizens brought up issues of diversity and local government transparency.

Here’s the agenda, with links to the videos and a few notes.

AGENDA
REGULAR MEETING OF THE VALDOSTA CITY COUNCIL
5:30 PM Thursday, March 7, 2013
COUNCIL CHAMBERS, CITY HALL
Continue reading

Fracking north Georgia

Fracking, coming to north Georgia soon.

Dan Chapman wrote for the AJC Sunday, Gas drillers turn to Georgia

Conasauga Field DALTON, Ga. — Trillions of cubic feet of natural gas believed to lie below the hills of northwest Georgia have remained virtually untouched and unwanted — until now.

Shale gas drilling is slowing across the country, but a handful of companies are poking around this corner of the state looking for the next natural gas “play.” If they succeed, Georgia could join the ranks of states reaping jobs, revenue and fears of environmental damage from energy production, The Atlanta Journal-Constitution has learned….

In Alabama, the Conasauga shale field contains 625 trillion cubic feet of gas, according to Bill Thomas, a geologist who taught at the University of Kentucky and Georgia State. A similar amount could be underground in Northwest Georgia, he added.

Wish I didn’t have to say I told you so: Fracking: coming soon to a state near you? 26 Dec 2012.

No fracking. No nuclear. No biomass. Let’s get on with solar and wind.

-jsq

 

Fukushima still broken 2 years after

Tomorrow is the second anniversary of the earthquake and tsunami that heavily damaged four of the six nuclear reactors at Fukushima Dai-ichi in Japan on 11 March 2011, also known as 3/11. The broken reactors at Fukushima continue to leak radioactive substances into groundwater, the sea, and the air, where it is carried across oceans to the U.S. and elsewhere. And it could still get much worse: if the No. 4 reactor pool, still suspended in the air, collapses and causes the disintegration of spent fuel rods from all the other reactors there, Tokyo, 200 miles away, will have to be evacuated. Fukushima’s GE reactors are the same GE Mark I design as Southern Company’s Plant Hatch 1 and 2 only 100 miles from here at Baxley, GA, and about 200 miles from Atlanta and Charleston. Hatch is leaking radioactive tritium into our groundwater again. Five more reactors within 500 miles of here are also GE Mark I.

Among the 311 or so facebook pages and websites about Fukushima or against nuclear power is this concise one, Unplug Nuclear Power, which offers a simple action anyone can take tomorrow:

On 3/11, we will mark Fukushima day by using as little utility supplied electricity as possible. This direct Action is designed to punish the utility companies for continuing to push for nuclear power even after the Fukushima disaster has proven that it is just too dangerous. On that day, we will punish them in the only way that they understand, by denying them our money. There will be four levels of participation, go to the website, www.unplugnuclearpower.com for a more complete description. Also, be sure to join the Event. Finally, if you are in a group our organization that can endorse this Action, please let us know.

As Jeremy Rifkin so concisely spelled out, nuclear power is over Continue reading

Water Plant Planning —Henry Hicks @ VCC 2013-03-07

Henry Hicks Valdosta Utilities Director Henry Hicks gave a detailed history of flood control projects and work on the Withlacoochee Waste Water Processing Plant at the Valdosta City Council Meeting last night during the "Manager's Report" section of the agenda. Several Council members expressed their distaste for the VDT’s recent reporting on the subject, and thanked Hicks and other city employees for their work.

$40 million already spent Hicks said they had spent $4 million on repairs to the Withlacoochee plant, and that didn't include the $40 million they'd already spent on upgrades in general. Also, it took three days to build the berm around the plant in 2009, and FEMA wouldn't approve any improvements to it.

He said he would Continue reading

Rezoning, two grants, fire, and water @ VCC 2013-03-07

There’s nothing on the agenda for last night’s Valdosta City Council meeting about the recent flooding or the Withlacoochee Wastewater Treatment Plant or the raw sewage in neighborhoods or downstream all the way to the Gulf, but quite a bit was said last night anyway; video to follow. Here’s the agenda. -jsq

AGENDA
REGULAR MEETING OF THE VALDOSTA CITY COUNCIL
5:30 PM Thursday, March 7, 2013
COUNCIL CHAMBERS, CITY HALL
Continue reading

Valdosta famous for wastewater in rivers all the way to the Gulf

The VDT had a small front page headline yesterday: “Floridians warned about river contamination”. That story was also heard in Florida, in Madison, Gainesville, and elsewhere, emphasizing something that Valdosta didn’t mention: people live downstream of Valdosta’s wastewater spill, all the way down the Withlacoochee and the Suwannee Rivers to the Gulf of Mexico. The story also made the AJC.

Green Publishing, Inc, which covers Madison, Lee, and Greenville, Florida, reported yesterday, ALERT: FLORIDA DEPARTMENT OF HEALTH WARNS OF POSSIBLE WASTEWATER CONTAMINATION: GA wastewater plan overflow may impact Withlacoochee and Suwannee Rivers.

TALLAHASSEE- The Florida Department of Health (DOH) today issued a caution to residents in the counties surrounding the Withlacoochee and Suwannee rivers. The Withlacoochee Water Pollution Control Plant in Valdosta, GA has overflowed into the Withlacoochee River, which flows south, connecting with the Suwannee River.

Other news venues carrying the story:

Continue reading

China regains lead in solar and wind investment —Financial Times

Pilita Clark wrote for Financial Times 14 January 2013, China retakes renewables investment lead,

China has surged ahead of the US to regain its title as the world's biggest investor in renewable energy, new figures showed on Monday.

The article continues by trying to downplay solar and wind because of a drop in investment from other countries, while not mentioning that solar and wind deployments continue to climb. According to Todd Woddy in Forbes 22 January 2013, Chinese Solar Market Boomed In Q4, Accounting For Third Of Global Demand. China has incentive and is doing something about it, as Feifei Shen and Reed Landberg wrote for Bloomberg News 30 January 2013, China to Boost Solar Power Goal 67% as Smog Envelops Beijing.

How much are the Chinese investing? The FT story continues:

Continue reading

Valdosta Neighborhood Covered In Raw Sewage —WCTV

Valdosta Flooding As he indicated yesterday, Gabe Fisher got his sewage-covered neighborhood on WCTV last night.

Greg Gullberg wrote for WCTV yesterday, Valdosta Neighborhood Covered In Raw Sewage,

Chad Harrison After days of torrential rain, the same rain that caused the rivers to flood, the sewage pump has been overwhelmed in the Meadow Brook Subdivison just off Gornto Road.

“You know how bad it smells in a bathroom when someone goes in and uses a public restroom. Multiple that ten times,” said Chad Harrison, a local resident.

Greg Gullberg The whole area behind their houses is just covered in raw sewage. Your boots sink down into it with every step. We’re talking everything from human waste, to toilet paper, to hygiene products and a whole other list of things that are just too graphic to mention.

“Probably about 12 to 14 inches of raw sewage,” said Harrison. “It’s just everywhere. It’s all up and down the creek. It’s all behind everybody’s houses.”

House There’s more in the WCTV story, such as that the city has included neighbors in meetings, but has not yet changed anything. The city’s PR about the flooding says:

Continue reading

Withlacoochee Wastewater Treatment Plant Fully Operational

Received today. -jsq

FOR IMMEDIATE RELEASE

Release #03-13-02
March 3, 2013

Withlacoochee Wastewater Treatment Plant Fully Operational

Withlacoochee Wastewater Treatment Plant At approximately 1:30 p.m. today, March 3, the Withlacoochee Wastewater Treatment Plant was brought online and returned to normal operation, after a loss of function for only three days compared to the nine days of complete loss of function experienced in the flood of 2009. Today, the river receded to the point where the temporary by-pass pumps could be connected to the existing valves. The system was turned on, became fully operational and began full treatment capabilities.

Lessons learned from the 2009 flood resulted in proactive measures which include the following:

  • The installation of bypass pumps, pipes and valves to utilize in the event of an emergency or act of God.
  • In 2009, the berm only protected the pump station, which did not prevent flooding of the chemical building, the chlorine contact building, the filters and the belt presses. The plant's electrical system was destroyed in the flooded area and the filters and belt presses were inoperable.
  • In this event, the electric system, chlorine cylinders, de-chlorination system and all flooded areas were turned off to avoid the damage that was experienced in 2009.
  • In this event, the biological, natural occurring bacteria that are used in the treatment process were saved so that the system could treat wastewater immediately when it was turned back on. In 2009, the natural occurring bacteria were washed out of the plant as a result of the continuous pumping during the event.
  • In this event, the plant was fully operational in three days. In 2009, the plant had a complete loss of function for nine days and was not fully operational for over a month.

The city's drinking water supply is in no way

Continue reading