Substandard fire protection at nuclear Plant Hatch?

Does Hatch nuclear Unit 1 have substandard fire protection, like many reactors built before 1975? Protection against fires that the NRC says cause about half the core damage risk, such as at Fukushima, which is the same design as Hatch?

According to Simplyfy.org 2 Jan 2012, Fire Risk At Older Japan Reactors Shows Potential Worldwide Problem,

The [Japanese Nuclear Regulatory Authority] NRA announced recently that reactors built before 1975 likely have sub standard fire protection designs. This includes having important cables coated in fire resistant insulation, isolating and protecting cables and creating barriers to prevent fires from spreading to other areas of critical equipment.

Source: The Mainichi, 1 Jan 2013, Over 10 nuclear plants in Japan have flawed fire-prevention equipment: sources.

What else was built before 1975? Plant Hatch Unit 1 “Operating License: Issued – 10/13/1974”, according to the U.S. NRC. 100 miles from here, and the same design as Fukushima.

DOE also instituted upgrades and changes to their reactor facilities which included facility modifications as a result of Browns Ferry fire. Private sector nuclear power reactors in the US are not all fully up to the newer rules. The NRC has issued a number of exemptions that watchdog groups have criticized as being unsafe. Browns Ferry still does not meet the NRC fire rules for cables. 47 of 52 reactors in the US still do not comply with the 1980 fire regulations.

Plant Hatch is privately owned and operated. Has it been upgraded? Continue reading

NRC says it’s “never been a practice” to show licensee documents to the public

After Kendra Ulrich of Friends of the Earth asked about some licensee documents related to last week’s NRC hearing in faraway Maryland on restarting California’s San Onofre nuclear reactor, NRC’s David Beaulieu expanded on NRC’s refusal to divulge the documents.

Here’s the video:

Video by Myla Reson at NRC, Maryland, 18 December 2012.

You can hear him say it’s “never been a practice” to let the public see licensee documents. But if they’re being used in making a license decision, why doesn’t that make them public documents accessible by the public? Oh, right “it’s very complex” but “it’s a yes or no question” and “I will assess”, he says. It’s good to be king!

I wonder if the public had some assurance of transparency maybe the NRC wouldn’t get so many FOIA requests?

Remember, this is the same NRC that gave 100-mile-from-here same-design-as-Fukushima Plant Hatch a 20 year license extension, and the same NRC that gave Plant Vogtle a clean bill of health at a public meeting two days before Unit 1 shut down, and the same NRC that could stop the new nukes there even if the GA PSC won’t.

What if we deployed solar power instead, on budget and on time?

-jsq

Kewaunee nuke is shutting down; why are we building more at Vogtle?

Dominion Power is shutting down a nuke because it can’t compete economically. Why are we letting Georgia Power charge us up front and load us up with debt to build a nuke we already know can’t compete economically? After all, if it could, it wouldn’t need three-legged nuclear regulatory-capture stool that we the rate-payers and taxpayers are already paying on, instead of getting on with solar and wind power.

According to 22 October 2012 PR from Dominion Power:

Dominion (NYSE: D) today said it plans to close and decommission its Kewaunee Power Station in Carlton, Wis., after the company was unable to find a buyer for the 556-megawatt nuclear facility.

According to Dominion:

Kewaunee, Dominion’s fourth nuclear station, generates 556 megawatts of electricity from its single unit. That’s enough to meet the needs of 140,000 homes.

The station began commercial operation in 1974…

1974? That’s the same year as Plant Hatch Unit 1, on the Altamaha River 100 miles from here. (Hatch Unit 2 came online in 1978.) But the Hatch reactors were relicensed in 2002 extending their lifetimes 20 years out to 2034 and 2038, so they won’t be closing, right?

Well, maybe they could. Howard A. Learner wrote for JSOnline 30 October 2012, Market has spoken in Kewaunee shutdown,

Continue reading

NRC doesn’t publish nuclear licensing documents

Kendra Ulrich of FOE at NRC Did you know the U.S. Nuclear Regulatory Commission doesn’t publish nuclear licensee documents? Hear them say it on this video of Tuesday’s NRC “public meeting” in Maryland about restarting the San Onofre reactor in California. This is the same NRC that gave Plant Vogtle a clean bill of health at a public meeting two days before Unit 1 shut down, and the same NRC that could stop the new nukes there even if the GA PSC won’t. Plant Hatch This same NRC recertified Plant Hatch on the Altamaha in Georgia, extending the original 40 year design lifespan of Unit 1 from 2014 to 2034 and of Unit 2 from 2018 to 2038. But don’t worry; if you’re farther than 10 miles from Hatch, you’re outside the evacuation zone, so you must be safe, right? Just study the licensing documents to see; oh, wait!

Kendra Ulrich of Friends of the Earth asked the NRC some simple questions that stumped the Commissioners and staff. She wondered when the public could expect to see a a 50-59 analysis California Edison had done about restarting San Onofre. Dave Beaulieu, NRC Generic Communications Branch, said it was a “licensee document, licensee documents are not made public.” He did say NRC would release its own inspection results. She asked again, and Rick Daniel, NRC meeting facilitator suggested she submit written questions. Beauleiu summarized:

“At the end of the day, licensee documents are not made public; that’s the answer.”

So what would be the point of her submitting questions when she was just told they won’t make the answers public?

Ulrich continued by asking why NRC was considering going ahead on the basis of experimental data that has never been used before and that has not been made public. Remember this is about a nuclear reactor that was shut down because it was leaking. That question sure caused some passing of the buck and pretending not to understand the question by everybody in the room who should have been able to answer the question.

Here’s the video:

Video by Myla Reson, 18 December 2012, Maryland.

Continue reading

Nuclear reactors near here

If you think of nuclear reactors as something far away, or as much safer than Fukushima, you’re in for a surprise. The most notorious reactors are the ones not yet built, units 3 and 4 at Plant Vogtle near Augusta and their famous financial boondoggle. But others are closer, older, and more numerous than you may know.

Here’s a map by the Nuclear Regulatory Commission (NRC).

That map’s not clickable, so here’s a table, selected from an NRC table by distance from Valdosta:

NameOwnerWhereDistance
from
Valdosta
Hatch 1 & 2* SNOC 11 miles N of Baxley, GA 100 miles
Farley 1 & 2SNOC 18 miles SE of Dothan, AL 125 miles
Crystal River 3 PGN 80 miles N of Tampa, FL 160 miles
Vogtle 1 & 2 SNOC 26 miles SE of Augusta, GA 200 miles
Summer SCEG 26 miles NW of Columbia, SC 300 miles
Saint Lucie 1 & 2 FPL 10 miles SE of Ft. Pierce, FL 325 miles
Oconee 1,2,3 Duke 30 miles W of Greenville, SC 330 miles
Robinson 2 PGN 26 miles NW of Florence, SC 350 miles
Sequoya 1 & 2 TVA 16 miles NE of Chattanooga, TN 360 miles
Catawba 1 & 2 Duke 18 miles S of Charlotte, NC 390 miles
McGuire 1 & 2 Duke 17 miles N of Charlotte, NC 410 miles
Browns Ferry 1,2,3* TVA 32 miles W of Huntsville, AL 410 miles
Turkey Point 3 & 4 FPL 20 miles S of Miami, FL 440 miles
Brunswick 1 & 2* PGN 40 miles S of Wilmington, NC 480 miles
Waterford 3 Entergy 25 miles W of New Orleans, LA 495 miles
Shearon Harris 1 PGN 20 miles SW of Raleigh, NC 498 miles
* GE Mark I; Duke: Duke Energy Power Company, LLC; Entergy: Entergy Nuclear Operations, Inc.; FPL: Florida Power & Light Co.; PGN: Progress Energy; SCEG: South Carolina Electric & Gas Co.; SNOC: Southern Nuclear Operating Company; TVA: Tennessee Valley Authority

Five operating nuclear power reactors are closer to us Continue reading

When will Southern Company & Georgia Power finally wake up? —Michael G. Noll

Received today on Plant Vogtle water use. -jsq

Energy projects such as biomass plants, coal firing plants, and nuclear power plants waste enormous amounts of water. The once proposed 40MW biomass plant in Valdosta would have consumed 800,000 gallons of water DAILY. Considering that for years now we are experiencing record drought conditions and heat waves in the US, this should make everyone’s hair stand up on the back of their necks. (For more information see “Electricity’s Thirst on a Precious Resource”.)

Add to this scenario a recent decision by the US Nuclear Regulatory Continue reading

Cost overruns already starting for Georgia Power’s new nukes

Remember how Georgia Power customers get to pay for cost overruns on the new nukes? Well, the overruns have already started.

JoAnn Merrigan wrote for WSAV 15 May 2012, Environmental Groups: Plant Vogtle Reactors Almost One Billion Over Budget,

A group of nine national environmental groups says that the two new nuclear reactors being built at Plant Vogtle (near Waynesboro in eastern Georgia) are over budget by up to $1 billion dollars. The opponents say Georgia Power’s share of the cost overruns is currently $400 million and that may cost ratepayers as well as taxpayers who are guranteeing loans in the billions of dollars.

The nine environmental groups, Friends of the Earth, Southern Alliance for Clean Energy, Blue Ridge Environmental Defense League, Center for a Sustainable Coast, Citizens Allied for Safe Energy, Georgia Women’s Action for New Directions, NC WARN, Nuclear Information and Resource Service, and Nuclear Watch South, are also suing:

Continue reading

Southern Company wants even more special nuke loan terms

Southern Company wants even more special loan guarantee terms for its new Plant Vogtle nukes. When that or CWIP gets revoked, maybe Southern Company will see that solar is a lot less trouble, and more profitable.

The license authorized by the NRC 9 February 2012 for the new Plant Vogtle nukes is the first one in thirty years. Harvey Wasserman wrote for CounterPunch 18 April 2012, The Big Liability,

It’s about a proposed $8.33 billion nuke power loan guarantee package for two reactors being built at Georgia’s Vogtle. Obama anointed it last year for the Southern Company, parent to Georgia Power. Two other reactors sporadically operate there. Southern just ravaged the new construction side of the site, stripping virtually all vegetation.

It’s also stripped Georgia ratepayers of ever-more millions of dollars, soon to become billions. This project is in the Peach State for its law forcing the public to pay for reactor construction in advance.

Look on your Georgia Power bill for Nuclear Construction Cost Recovery Rider, aka Construction Work in Progress (CWIP). It’s probably about 3% of your bill, for power you may never receive.

If you get your electricity from an EMC instead, remember Georgia’s Electric Member Corporations already participate in the existing Plant Vogtle nukes, so you’ll be on the hook one way or another for the new nukes.

When the project fails, or the reactors melt, the public still must pay.

And even before then, Georgia Power customers get to pay for cost overruns. Not to worry; last time nukes were built at Plant Vogtle, they only ran over budget by a factor of seven.

Southern Company’s existing Plant Vogtle reactors had an unexpected shutdown last year days after NRC said they were fine. And Southern Company says Continue reading

Concrete flaws at Vogtle delay construction, require modified nuke permit

Concrete sinking into the dirt less than two months after licensing? One license amendment already requested and dozens more to come? Does this give you confidence in Southern Company's ability to build a safe nuclear plant without huge cost overruns charged to you the Georgia Power customer or you the taxpayer?

In mid-March the nuclear industry bragged about

Progress continues at the construction site of Plant Vogtle units 3 and 4 — the country's newest reactors and the first to be licensed since 1978.

We discover that at the end of March Southern Company had to ask NRC for a licensing change due to construction problems. Vogtle Nuclear Construction Faces “Additional Delay” Based on Miscalculations in Foundation Concrete — News Release from NC WARN and Alliance for Nuclear Accountability—April 9th, 2012, Continue reading

Calculate how much Vogtle is costing you —Mandy Hancock

Received yesterday, related to Georgia Power forges ahead with expensive nukes. -jsq
For those of you concerned about nuclear energy, here are some quick, meaningful actions you can take today. Maybe you aren’t concerned about nuclear energy. I bet you ARE concerned about $$$$.

Learn more about how Georgia Power is getting your money at the state and federal level. All US taxpayers all over the US are basically cosigning a loan for $8.3 B for the Vogtle reactors. Simultaneously, Georgia Power is raising your electric rates to fund the pre-construction costs by pulling the same advanced cost recovery scheme as SC and FL. You can learn more about the controversy surrounding the loan guarantees here

Calculate how much Vogtle is costing you on your monthly bill

(Look for “Nuclear Construction Cost Recovery Rider:”)

-Mandy Hancock