Is this sub base solar farm bigger than the 30 MW ones Georgia Power is building at three Army bases in Georgia? Actually that’s 42 MW DC in and 30 MW AC out, so the same as the Army bases.
Navy Chief of Information Office, 13 July 2015, Navy and Georgia Power Ink Deal to Build 42 MW Solar Farm at SUBASE Kings Bay,
WASHINGTON, D.C. (NNS) — The Department of the Navy (DON) announced today a signed real estate outgrant with Georgia Power, a subsidiary of Southern Company, to develop a large-scale, solar generation farm at Naval Submarine Base (SUBASE) Kings Bay.
The 42 megawatt (MW) direct current (DC) facility will be constructed on Continue reading