Tag Archives: natural gas

German wind overpowering?

The biggest wind problem in Germany is it produces too much power? Fortunately there are two well-known simple solutions to this problem raised by GA Public Service Commissioner Tim Echols in a comment yesterday. I do want to thank him for engaging in dialog with the public.

Tim Echols wrote:

eeX DE wind 2013-07-20 We need nuclear, coal and gas as our baseload power. Germany is doing the opposite and they are in trouble. Their people pay triple what we pay for power, and when the wind is blowing at night or on the weekend, the Germans have to pay Poland to take their excess power. All of that primarily because the German people hate nuclear power. In Georgia, we are leading the nation, and I am fine with that. I just want to make sure our ratepayers are protected and not paying for the learning curve of new nuclear.

As FERC Chairman Jon Wellinghof has been pointing out for years, baseload is the problem. The baseload ideology stands in the way of the distributed solar power the vast majority of the American people want, and in the way of wind power.

Regarding German power costs to customers, Germany is far north of here, with far less sun, and Germany has depended heavily on Feed-In Tariffs, which may or may not be what we need in Georgia. Meanwhile, what’s been hiking power rates in Georgia is not solar or wind power, it’s nuclear and natural gas. And not for Feed-In Tariffs, either, which are only charged on actual energy production. The Georgia legislature approved Construction Work in Progress (CWIP) for nuclear, and GA PSC has raised rates to pay for natural gas plant construction, which amounts to the same thing. If we want to save ratepayers money, we should get on with solar and wind power.

Now to the problem with two well-known solutions: Continue reading

GA PSC member ties Plant Vogtle nuke cost overruns to Kemper Coal in Mississippi

If Georgia Power stonewalls on cost overruns, will it lose at least one Commissioner this time? Long-time nuclear supporter Tim Echols suggested at the hearings this morning that cost overruns at nuclear Plant Vogtle should be capped like Southern Company was forced to do for Kemper Coal by the Mississippi PSC. Standard & Poor’s already downgraded SO because of Kemper Coal and two analysts have downgraded SO for sticking to coal and nukes instead of doing more solar and wind. If SO’s majority part Georgia Power loses the GA PSC, it could be curtains for Plant Vogtle’s new nukes.

Ray Henry wrote for AP this morning, Southern Co. challenged on nuclear plant costs,

Southern Co. subsidiary Georgia Power has asked to raise the budget for its share of massive project by $737 million to roughly $6.85 billion.

Public Service Commission Tim Echols asked whether the firm has considered offering a deal like one it reached in Mississippi over a separate plant that also proved expensive to build. The company has absorbed $540 million in losses in Mississippi and could face more.

Remember, Tim Echols has for two years now been Continue reading

China ends a nuclear treatment plant after demonstrations

“In order to respect the popular will, the government of” the city of Heshan refused to proceed with a $9 billion uranium processing plant. That happened after this, yesterday:

The cancellation, unusually fast, demonstrates the increasingly important attention given by the authorities to environmental concerns that are often expressed at the local level. Several projects of petrochemical plants and metal processing have recently been postponed or relocated.

Yes, I know the plant may just be relocated somewhere else. But with enough such demonstrations it won’t be built. How about some of this respect for the popular will about, for example, the natural gas pipeline through Georgia from Alabama to Florida, or the new nukes at Plant Vogtle?

Le Monde, today, Continue reading

Videos: Attorney set different prices, Commissioners set millage date @ LCC 2013-07-09

The most interesting developments were not on the agenda. Commissioners approved dollar amounts for two purchase orders that were completely different from the ones they were quoted the morning before, with no discussion: the County Attorney quoted the new figures, asked for approval, and immediately got it. Commissioner Richard Raines still didn’t want to enforce a neighborhood covenant yet it was Commissioner Raines who made the motion last fall to let an Exclusive Franchise with Advanced Disposal Services; a covenant the county is now trying to enforce by having the County Attorney sue local business Deep South Sanitation. They said nothing about that 100 foot wide pipeline barrelling through the county. They could have the County Attorney investigate that, but they aren’t. They approved meeting for millage rate approval 8:30 AM Friday 26 July 2013: that’s for the property taxes they collect, which presumably partly go to pay the County Attorney. And the Chairman refused to let a citizen speak on a technicality.

Here’s the agenda with links to the videos and a few notes. See also videos of the previous morning’s Work Session.

LOWNDES COUNTY BOARD OF COMMISSIONERS
PROPOSED AGENDA
WORK SESSION, MONDAY, JULY 8, 2013, 8:30 a.m.
REGULAR SESSION, TUESDAY, JULY 9, 2013, 5:30 p.m.
327 N. Ashley Street – 2nd Floor
Continue reading

Videos: Water, Sewer, Video Arraignment, and Backups @ LCC 2013-07-08 @ LCC 2013-07-08

Not big enough, I guess:

I don’t have any interest at all in this board enforcing covenants like that.
Commissioner Richard Raines said that at yesterday morning’s Work Session about a covenant the neighbors want a rezoning applicant to sign, yet it was Commissioner Raines who made the motion last fall to let an Exclusive Franchise with Advanced Disposal Services; a covenant the county is now trying to enforce by suing local business Deep South Sanitation. They said nothing about that 100 foot wide pipeline barrelling through the county. They vote tonight, 5:30 PM.

County sound still wasn’t working, going on a month now, back in the videoing pen in the back of the room, so what you hear is what we hear back there, as recorded by the LAKE camera.

Here’s the agenda with links to the videos and a few notes.

LOWNDES COUNTY BOARD OF COMMISSIONERS
PROPOSED AGENDA
WORK SESSION, MONDAY, JULY 8, 2013, 8:30 a.m.
REGULAR SESSION, TUESDAY, JULY 9, 2013, 5:30 p.m.
327 N. Ashley Street – 2nd Floor
Continue reading

Koch astroturf vs. solar jobs for Georgians

More solar for Georgia must be a good thing if AFP is organizing astroturf against it. GA PSC decides Thursday. Like another speaker at GA PSC last month, I don’t think even Bubba McDonald’s proposal to double solar requirements on Georgia Power goes nearly far enough, but at least it’s a start, which is more than Georgia Power will do unless nudged by GA PSC.

Ray Henry wrote for AP yesterday, Critics’ numbers misleading in Georgia solar fight: Georgia panel will vote soon on power plan,

A political group founded by billionaire brothers Charles and David Koch wants Georgia’s utility regulators to reject a plan requiring Southern Co. to buy more solar energy, but an Associated Press review finds it has used misleading figures to build its case.

The Georgia chapter of Americans For Prosperity, founded by billionaire brothers Charles and David Koch, wants Georgia’s utility regulators to reject a solar energy plan in Georgia. But an Associated Press review ahead of a vote on the issue finds that it has used misleading figures to build its case.

The Georgia chapter of Americans For Prosperity has said in mass e-mails that Continue reading

SO’s plan to make the Southeast a net exporter of the energy from solar and wind? –John S. Quarterman @ SO 2013-05-22

SO CEO Tom Fanning didn’t budge from nuclear and coal, but he did announce a tiger team to get on top of distributed solar and wind through a smart grid, headed by SO’s COO, at the 22 May 2013 Southern Company Stockholder Meeting.

Next question --Tom Fanning Mr. John S. Quarterman from Lowndes County, Georgia, and he holds 220 shares of Southern Company.

TF: Hello, John. Good to see you again this year.

jsq with SO fade jsq: Hi. I’ve come to compliment Tom Fanning and Paul Bowers. Last year, Tom Fanning was so persuasive I ran out and bought $10,000 worth of stock.

TF: Bless you. [Applause]

However, apparently because of SO’s admission a few minutes before in that same meeting that it was going to have to eat Kemper Coal cost overruns, SO stock tanked that same day, causing my stock to stop out, and Standard & Poor’s downgraded SO the following day because of Kemper Coal, noting that if the same thing happened with SO’s nuclear project at Plant Vogtle, S&P’s would probably Continue reading

Water, Sewer, Video Arraignment, and Backups @ LCC 2013-07-08

A very light agenda for the Lowndes County Commission, still avoiding topics of public interest, such as that 100 foot wide pipeline barrelling through the county and the county suing a local business to the benefit of a monopoly owned by investors in New York City.

Here’s the agenda.

LOWNDES COUNTY BOARD OF COMMISSIONERS
PROPOSED AGENDA
WORK SESSION, MONDAY, JULY 8, 2013, 8:30 a.m.
REGULAR SESSION, TUESDAY, JULY 9, 2013, 5:30 p.m.
327 N. Ashley Street – 2nd Floor
  1. Call to Order
  2. Invocation
  3. Pledge of Allegiance to the Flag
  4. Minutes for Approval
    1. Work Session — June 24, 2013
    2. Regular Session — June 25, 2013
  5. Public Hearing — REZ-2013-07 Leatherwood, 2402 or 2406 James Rd. R-1 and R-21 to R-10, LC Water and Sewer, ~0.71 acres
  6. For Consideration
    1. Video Arraignment for Magistrate and Juvenile Court Contract
    2. Enterprise and Backup Storage Solution Scope of Work
  7. Reports-County Manager
  8. Citizens Wishing to be Heard Please State Name And Address

-jsq

Re-evaluate Plant Vogtle and move to wind and solar power –Courtney Hanson @ GA PSC 2013-06-18

Re-evaluate Plant Vogtle, especially its water use, and move to efficiency, wind, and solar power instead, said Courtney Hanson of Georgia Women’s Action for New Directions (GA WAND) at the Georgia Public Service Commission meeting Tuesday 18 June 2013.

She reminded GA PSC Plant Vogtle 3 and 4 are late and over budget, and then:

I want to add my voice to the chorus of folks here who are concerned about water issues. We know that Vogtle 3 and 4 will require an additional withdrawal of as much as 74 million gallons a day from the Savannah River and most of that water will not be returned. We know that the central Savannah River area where Vogtle is located is already very prone to droughts and the plant has been close to shutting down several times due to drought conditions. Georgia is also already struggling to supply enough water for our homes, businesses, industries, and farms.

In addition, the Savannah River is Continue reading

It is not enough to add a little solar and wind on top of fossil and fission fuels –a German @ GA PSC 2013-06-18

A German national residing in Georgia asked for a serious effort on energy efficiency and conservation while switching to real renewable energy sources instead of fossil fuels and nuclear, at the Georgia Public Service Commission meeting Tuesday 18 June 2013.

She said increasing fires and floods were part of climate change, and we need to do something about it.

I always hear this phrase “growing energy demand” as if it’s something, some matter of fact. A growing economy means growing energy demand, and that means consequently growing waste, growing pollution, growing inequity, and so on. Any thinking person should notice that we need to find a way out. For anyone concerned about our future, business as usual is no longer acceptable. We need drastic changes in our energy supply. We need to use less.

Only a month earlier, Tom Fanning, CEO of Georgia Power’s parent company Southern Company reemphasized yet again that

To us, growing the economy is how we’re going to make profit.

Yet GA PSC could do something about that antique attitude, as this speaker pointed out: Continue reading