Tag Archives: Mud Swamp Creek

Videos and packet: Millage, SPLOST VIII, Wastewater, roads, bridges, mosquitos, Construction Board @ LCC 2019-08-12

County Manager Joe Pritchard said Finance Director Stephanie Black has received a millage report from the Tax Commissioner. He and she will prepare something from it for the Lowndes County Commissioners for a later meeting.

The board packet is on the LAKE website, in response to a LAKE open records request.

Below are Continue reading

$1.5 mllion on wastewater, SPLOST VIII, roads, bridges, mosquitos, Construction Board @ LCC 2019-08-12

The resolution to reimpose the SPLOST tax as SPLOST VIII, was not included with the agenda for the tax-paying public to see. LAKE has filed an open records request for the entire board packet. Perhaps the county will supply it before they vote tomorrow.

[Land Application Site]
Land Application Site

Four bids were received for LAS and Pump Station Improvements with the high bid at $3.3 million, and the low at $2.5 million, but apparently the county negotiated the low bidder, Doyle Hancock & Sons, down to $1,520,858.00. This is “for improvements to the LAS [Land Application Site, aka wastewater spray field], Bevel Creek, Francis Lake, and Coleman Road lift stations.” The LAS is between Grassy Pond and Pike Pond, a few thousand feet from the GA-FL line, in the Withlacoochee River watershed. Continue reading

Videos: KLVB, Drinking, driving, and air conditioning @ LCC 2015-03-23

Keep Lowndes-Valdosta Beautiful did cleanups in wetlands in both the Withlacoochee and the Alapaha River watersheds, plus at exit 22, and the general illegal trash dumping situation came up. Did the county change the speed limit on your road? The County Engineer said only in one area, but they didn’t publish the list. Also discussed were a GEMA grant application, a proposal for engineering services for Exits 22 and 29, HVAC for county buildings, and a liquor license. Here’s the agenda with links to the videos and a few notes.

LOWNDES COUNTY BOARD OF COMMISSIONERS
PROPOSED AGENDA
WORK SESSION, MONDAY, MARCH 23, 2015  8:30 a.m.
REGULAR SESSION, TUESDAY, MARCH 24, 2015 5:30 p.m.
327 N. Ashley Street – 2nd Floor

Continue reading