Boards * 2, Sewer * 4, Court * 4, Beer, Computers, Pest, Fire, Grounds, Road truck @ LCC 2021-06-21

The biggest item on this week’s Lowndes County Commission agenda, for voting this eventing, is Grounds Maintenance. Planting some native shrubbery, flowers, and trees instead of all that lawn would reduce that cost.

Three sewage system items add up, for Whitewater Lift Station Control Panel Emergency Repair, Bemiss Low Pressure Sewer Main Replacement Change Order, and the $2,500,000.00 GEFA Loan for the Sewer System Rehabilitation Project. That last does not show up in the agenda sheet as BUDGET IMPACT, but county taxpayers will pay for it over time. However, proactive sewer system fixes are lot better than reactive sewage spill repairs.

Four courts in three agenda items require cash match. Plus a road work truck and pest control round out the dollar figures.

Cost What
$158,140.00Bid for Grounds Maintenance for County Buildings
$53,140.00Whitewater Lift Station Control Panel Emergency Repair
$48,307.21Compute and Storage for South Lowndes Data Center
$46,777.50Purchase of Fire Turnout Gear
$39,135.00Office of the Governor Criminal Justice Coordinating Council Accountability Court Lowndes County DUI Court Grant Award – State Court
$33,989.00Bemiss Low Pressure Sewer Main Replacement Change Order
$28,074.84Purchase of a Truck for Public Works
$23,557.16Lowndes County Accountability Court Adult Drug Court Program – Grant (Cash Match)
$10,000.00Lowndes County Juvenile Accountability Court – Drug Court Program – Grant (Cash Match)
$6,734.40Bid for Pest Control Service
$447,855.11Total

There’s a reappointment to Children’s Services and a new appointment to the Library Board.

And there’s a beer license, which brings in fees of $250 Off Premises + $150 Administration = $400.

[Beer, Lawns]
Beer, Lawns

Here is the agenda. The board packet is on the LAKE website, received in response to a LAKE open records request.
http://www.l-a-k-e.org/govt/loco/2021-06-21–lcc-packet

LOWNDES COUNTY BOARD OF COMMISSIONERS
PROPOSED AGENDA
WORK SESSION, MONDAY, JUNE 21, 2021, 8:30 a.m.
REGULAR SESSION, TUESDAY, JUNE 22, 2021, 5:30 p.m.
327 N. Ashley Street – 2nd Floor

Continue reading

Roads, Water, and Taxes @ LCC 2021-02-22

Four million dollars in tax money discussed this morning, to be voted on at 5:30 PM tomorrow (Tuesday) by the Lowndes County Commission.

[Table: Four Million Dollars]
Table: Four Million Dollars

Yet their video cameras seem to be broken and I haven’t seen anything about paying to fix them or buy new ones. Meanwhile, Valdosta City Council started online through an iphone, and numerous other counties in Georgia and Florida have made their meetings accessible online.

Cost What
$1,974,139.00Georgia Environmental Finance Authority (GEFA) Loan Application for the Lake Park Bellville Road Widening Project
$1,875,000.00 Georgia Environmental Finance Authority (GEFA) Loan Application for Lift Station & Manhole Rehab Project
$219,000.00Approve Purchase of West Savannah Avenue and Briggs Street Properties
$168,880.00Purchase of Wetland and Stream Credits for Old US 41 North Widening Project
$59,500.00Contract with Condrey and Associates, Inc.
$34,024.64Request for the Purchase of Motorola Radios for Public Works
$19,167.00 Approval of the Solicitor General’s VAWA Competitive Grant Award
$10,195.00Approval of Hightower Road and Cooper Road Right of Way Purchases
$6,000.00GMASS Rural Land Maintenance Contract
$339.00Just Compensation – Right of Way Parcel 10 Hightower Road and Cooper Road, TSPLOST Project
$4,366,244.64Total

We don’t know where are the lift stations or manholes to be financed through a GEFA loan for $1,875,000, but I’d say that’s a good use of funds. Not so sure about the $1,974,139 for relocating utilities for widening Lake Park Bellville Road, because I’m not clear on why that road needs widening. I do wonder why sewer and drinking water improvements have to be funded through loans while road building gets tax funds.

Here is the agenda. The board packet is on the LAKE website, received Friday in response to a LAKE Open Records request.

LOWNDES COUNTY BOARD OF COMMISSIONERS
PROPOSED AGENDA
WORK SESSION, MONDAY, FEBRUARY 22, 2021, 8:30 a.m.
REGULAR SESSION, TUESDAY, FEBRUARY 23, 2021, 5:30 p.m.
327 N. Ashley Street – 2nd Floor

Continue reading

Lift Station Pump, Juvenile Justice Grant, Fees for Web and Telephone Payments, 3 rezonings, 1 withdrawn, 1 lighting, beer @ LCC 2020-10-12

Here is a map of “North Central Lowndes County” which is the area the county wants most to develop with subdivisions. It’s in the board packet materials for Addition to Basic Decorative Street Lighting District – Coventry Villas Subdivision, for last week’s Lowndes County Commission meeting.

[Exhibit B: Basic Decorative; North Central Lowndes County 2; Revised 9/2020]
Exhibit B: Basic Decorative; North Central Lowndes County 2; Revised 9/2020
PDF

This the first table of tax dollar amounts we’ve had add up to a positive total.

Cost What
($1,107,500.64) 2021 LMIG Resurfacing Grant Application
($99,938.00)2020 Addressing Victimization within the Juvenile Justice System Grant Application
$42,067.69 Nelson Hill Lift Station Pump Upgrade
$5.00Approval of Increase in Convenience Fees for Web and Telephone Payments
($1,165,370.95)Total

The real total should be both less than that (the LMIG grant has a 10% match) and more (the $5.00 is times each telephone or online payment).

Here’s a list of what they plan to do with the 2021 LMIG Resurfacing Grant Application: Continue reading

Appoint Tax Assessors, 3 water, 3 road, 1 pandemic, 1 software @ LCC 2020-09-21

Applying this morning for Board of Tax Assessors are Mr. Gene Felts and Mrs. Gretchen Quarterman. The Lowndes County Commission will vote tomorrow (Tuesday) at 5:30 PM. That and almost $4 million in water, road, software, and fire items.

Cost What
$1,681,770.84Grading, Drainage, Base, and Paving of Clyattstone Road and Simpson Lane.
$1,417,333.98Clyattstone Water Main Extension
$489,310.00Motorola SUAII (Evergreen)
$128,075.58Firefighter Personnel Request
$41,217.6.00Foxborough Lift Station Pump
$34,169.28Drainage Improvements to Brinson Lane and Oak Hill Drive
$22,500.00FY2021 Joint Funding Agreement with USGS
$19,800.00Land Application System (LAS) Expansion Agreement
$3,834,177.28Total

Apparently paving does not solve all problems, because one of the four water items is Drainage Improvements to Brinson Lane and Oak Hill Drive to “eliminate flooding issues as a result of the paving of Oak Hill Drive.”. The other three water items are FY2021 Joint Funding Agreement with USGS for the Folsom Bridge (GA 122 Little River & Skipper Bridge (Withlacoochee River) USGS gauges, Foxborough Lift Station Pump, and Land Application System (LAS) Expansion Agreement.

In addition to Brinson Lane, there are two more road items: Grading, Drainage, Base, and Paving of Clyattstone Road and Simpson Lane (how much have they spent on that project combined so far?) and Acceptance of Infrastructure for Val Del Villas. The latter is listed as no cost, despite the Brinson Lane episode.

[Survey Plat]
Survey Plat

Also on the agenda: Grant Submission Request – COVID-19 Response Grant Application, partly to “Recruit and hire a sufficient number of poll workers and inspectors to ensure polling places are properly staffed,” , a Firefighter Personnel Request, and Motorola SUAll (Evergreen) software.

Received in response to a LAKE open records request, the board packet is on the LAKE website. Here is the agenda.

LOWNDES COUNTY BOARD OF COMMISSIONERS
PROPOSED AGENDA
WORK SESSION, MONDAY, SEPTEMBER 21, 2020, 8:30 a.m.
REGULAR SESSION, TUESDAY, SEPTEMBER 22, 2020, 5:30 p.m.
327 N. Ashley Street – 2nd Floor

Continue reading

Packet: Budget, MIDS, Rezoning, Clyattstone Road, Mosquito, Law, Fiber Optic, Alcohol @ LCC 2020-07-13

$3,200,415.50 was on the agenda for this week, presumably approved by now by the Lowndes County Commission, in which they also appointed Paige Dukes to succeed Joe Pritchard as Lowndes County Manager.

[Table of Costs (by LAKE)]
Table of Costs (by LAKE)

Cost What
$2,500,000.00 GEFA Loan Application
$289,498.00 Acceptance of FY 2021 Juvenile Justice Incentive Grant
$198,775.00 Fiber Optic to Lowndes EOC
$102,762.00 Judicial System Software Purchase
$45,790.00 Annual Contract Renewal for Mosquito Identification and Testing
$40,000.00 Office of the Governor Criminal Justice Coordinating Council Accountability Court Lowndes County DUI Court- State Court
$23,590.50 Approval of Clyattstone Rd.-Simpson Ln. ROW and Easement Purchases (Parcels 26 and 34)
$0.00 Amendment to TPO Agreement FY2021 – Transit
$3,200,415.50Total

That’s 2.6% of the $120 million county annual budget.

Curious that they’re willing to spend $198,775.00 for fast, reliabile, Internet connectivity to their own offices but nothing for the rest of the population of Lowndes County.

I’ve lost track of how much they’ve spent on Clyattstone Road to connect Old US 41 N and Val Del Road to promote development in that area.

I commend the county for the GEFA Loan Application for wastewater utilities projects:

HISTORY, FACTS AND ISSUES: The Georgia Environmental Finance Authority offers funding through the State Revolving Fund. Local governments are able to secure low interest loans to be used for utility projects. Lowndes County has identified several lift station and manhole rehabilitation improvement projects.

The loan can be structured to spread repayment over a period of up to 30 years; however, there is no penalty for paying the loan off early. The proposed interest rate will not exceed 1.94% While the total loan amount is $2,500,000.00 it includes a grant component which allows for forgiveness of up to $625,000.00 of the loan amount. Staff recommends approval of the GEFA Loan Application.

The entire board packet is on the LAKE website. Documents received 12:26 PM, Friday, July 10, 2020, in response to a LAKE open records request. LAKE looks forward to these documents being posted on the county’s own website along with the agenda. Continue reading

Videos: End-of-calendar-year wrapup and Remerton SPLOST Resolution @ LCC 2019-12-09

Remerton can’t use SPLOST VI funds for an office building, since the old mill building intended for that has been torn down. That was the longest item in the Lowndes County Commission Work Seesion of December 9, 2019: 7. Reports – County Manager – Remerton SPLOST Resolution.

Then Commissioner Clay Griner moved to go into Executive Session to discuss personnel. Chairman Bill Slaughter reminded him the Commission has only one employee. Griner agreed, and they went into Executive Session. The one employee is the County Manager.

They breezed through everything else their last meeting of calendar year 2019.

Below are LAKE videos of each agenda item, followed by a LAKE video playlist. See also the Continue reading

Packet: End-of-calendar-year wrapup @ LCC 2019-12-09

In its last meeting of calendar year 2019, the Lowndes County Commission had many items to wrap up, as you can see in the board packet, on the LAKE website. We don’t know why the county sent this packet in black and white.

LAKE videos of the Work Session and Regular Session will follow.

[WRPDO Site Map]
WRPDO Site Map

LAKE sent an open records request Continue reading

Videos: MIDS bus system, roof cleaning, truck bypass, new lift station generator @ LCC 2019-11-12

Longest at four and a half minutes on November 12, 2019, was 6.e. Grant Re-Application for the Rural (5311)Transportation Program, in other words, the MIDS on-demand bus system; follow the link for more notes, including a question about where have the county funds for this been coming from.


Commissioner Demarcus Marshall about the MIDS bus system.

Let’s hope the Arglass project doesn’t turn out like the James Road project a decade ago, with massive road paving and road and utilities rerouting, and nothing else, given that the county just approved a grant and VLDA match of more than a million dollars for road repaving for Arglass.

The truck bypass through downtown Valdosta had some discussion about when the bypass would happen and why the county is passing an ordinance now.

Um, it’s actually a generator for emergency management that took two minutes. 6.j. Hart Road Lift Station Pump took half a minute.

And another big item at three minutes: Continue reading

Five Public Hearings; Ten For Consideration, and Troupville River Camp @ LCC 2019-12-09

A very full agenda for the last Lowndes County Commission meetings of calendar year 2019, plus an unscheduled item to be raised Tuesday in Citizens Wishing to Be Heard: the WWALS Troupville River Camp project.

[Dignitaries at Confluence]
Dignitaries at Little River Confluence with Withlacochee River, 2019-06-15,
including Lowndes County Chairman Bill Slaughter

LOWNDES COUNTY BOARD OF COMMISSIONERS
PROPOSED AGENDA
WORK SESSION, MONDAY, DECEMBER 9, 2019, 8:30 a.m.
REGULAR SESSION, TUESDAY, DECEMBER 10, 2019, 5:30 p.m.
327 N. Ashley Street – 2nd Floor

Continue reading

Videos: Grants and bids, Law, Transportation, Water, and Roof Cleaning @ LCC 2019-11-11

The longest item at yesterday morning’s Work Session was the unscheduled 8. Reports County Manager – Recognition of Fire Safety. The whole thing took less than nine minutes. They vote tonight at 5:30 PM.

Second longest was the Solicitor General combining the two items on Victims of Crime Act (VOCA) and Violence Against Women Act (VAWA).

Third longest was 7.a.Judicial and Administrative Complex Roof Cleaning

Below are Continue reading