Tag Archives: Kinderlou Clyattville Road Paving And Drainage Improvements

Videos: Animal Policies, Wetland and stream credits for Kinderlou-Clyattville Road, UPS, Fire Station alterations, Moody Hydrant, Grassy Pond Utilities @ LCC Regular 2024-07-23

Five citizen speakers said spending more money on an Animal Shelter building was not a solution to a problem that needs different policies: Burton Fletcher, Nancy and Danny Griffin, Janice Monaco, and Tara Parker.

[Collage @ LCC 23 July 2024]
Collage @ LCC 23 July 2024

All the voting agenda items sailed through unanimously, including the Wetland and Stream Credits for the Kinderlou Clyattville Road Paving and Drainage project. Also, as staff recommended, they rejected as too high the bid for the 6.b. Moody Hydrant Replacement Project.

Commissioner Scottie Orenstein asked if the architect had given a budget estimate for 6.a. Alterations to Lowndes County Fire Station #10. Engineering Services Director Chad McLeod said no, but they had done an internal estimate and the project is within the estimated range. Chairman Bill Slaughter added that the project is within budget.

A Commissioner, I think Mark Wisenbaker, wanted to know whether the county had had experience with the low bidder for 6.c. Grassy Pond Utilities Replacement. Answer: yes, on the LAS project, and they’re well known in the Waycross and Ware County area.

I’m still mystified why Moody AFB doesn’t count as a stakeholder.

I had some issues with the camera direction on 5.c. Vertiv Service Contract, UPS, 911 Center, Valdosta – Clyattville Tower. The battery ran down and I lost the beginning of 5.d. Quit-Claim Deed of Abandoned Section of Race Track Road SE. Gretchen is back and will handle this coming week’s videoing.

Below are links to the LAKE video of each agenda item, with a few notes by John S. Quarterman, followed by a LAKE video playlist.

See also Continue reading

Videos: Wetland and stream credits for Kinderlou-Clyattville Road, UPS, Fire Station alterations, Moody Hydrant, Grassy Pond Utilities @ LCC Work 2024-07-22

Update 2024-08-11: Videos: Animal Policies, Wetland and stream credits for Kinderlou-Clyattville Road, UPS, Fire Station alterations, Moody Hydrant, Grassy Pond Utilities @ LCC Regular 2024-07-23.

The Lowndes County Commissioners and staff were surprisingly inquisitive at yesterday morning’s Work Session. They vote this evening at 5:30 PM.

There was some discussion on 6.a. Alterations to Lowndes County Fire Station #10, which is the main station east on US 84.

[Collage @ LCC 22 July 2024]
Collage @ LCC 22 July 2024

About the 5.a. Purchase of Wetland Credits for PI#0016278 Kinderlou Clyattville Road, Gretchen noted, “There was a brief discussion of wetland credits and how they are calculated by the Army Corps of Engineers. The calculation is now cumulative to the project, not at each individual site. In my opinion, this is a good thing as a project with a lot of “little” encroachments now does not get a pass.

They also discussed the less expensive 5.b. Purchase of Stream Credits for PI#0016278, Kinderlou Clyattville Road.

Moody AFB is going back to the drawing board for the Continue reading

Packet: Wetland and stream credits for Kinderlou-Clyattville Road, UPS, Fire Station alterations, Moody Hydrant, Grassy Pond Utilities @ LCC 2024-07-22

Update 2024-07-23 Videos: Wetland and stream credits for Kinderlou-Clyattville Road, UPS, Fire Station alterations, Moody Hydrant, Grassy Pond Utilities @ LCC Work 2024-07-22.

Update 2024-07-23: Southern Gateway LLC annexation, rezoning, and aquifer recharge zone on Race Track Road SE, in All Valdosta cases: 2 small and 1 big annexation and rezoning @ GLPC 2024-07-29.

The ongoing Kinderlou Clyattville Road Paving and Drainage Improvements are getting both wetland and stream credits.

[Wetland & stream credits for Kinderlou-Clyattville Road, 2 Moody AFB projects, UPS, Fire Station alterations @ LCC 2024-07-22]
Wetland & stream credits for Kinderlou-Clyattville Road, 2 Moody AFB projects, UPS, Fire Station alterations @ LCC 2024-07-22

Something that seldom happens: staff recommends rejecting a bid, this one for the Moody Hydrant Replacement Project, because the one bid “far exceeded the budgeted amount for this project.”

Staff got four bids for the Grassy Pond Utilities Replacement and recommend the low bid for almost a million dollars.

Cost What
$995,604.00Grassy Pond Utilities Replacement
$891,210.00Moody Hydrant Replacement Project
$362,662.00Alterations to Lowndes County Fire Station #10
$59,220.00Purchase of Stream Credits for PI#0016278, Kinderlou Clyattville Road Paving and Drainage Improvements
$21,389.9.00Vertiv Service Contract for the UPS at the 911 Center, Valdosta Tower and Clyattville Tower Work/Regular
$10,800.00Purchase of Wetland Credits for P1#0016278 Kinderlou Clyattville Road Paving and Drainage Improvements
$2,340,885.9.00Total

Why is the Lowndes County Commission approving bids for these two Moody AFB projects when, according to the ULDC, Moody AFB is not a “stakeholder” and was not even mentioned in the previous County Commission Regular Session as getting drafts or meetings about changes to the ULDC?

Don’t get me wrong. I think Moody needs fire hydrants and Grassy Pond needs utilities repaired after hurricane of last fall. And Moody needs the wastewater treatment plant that the county now runs. I’m just mystified why Moody AFB doesn’t count as a stakeholder.

The bulk of this week’s board packet consists of three contracts for Vertiv Service Contract for the UPS at the 911 Center, Valdosta Tower and Clyattville Tower, each a dozen pages long, with only two pages each different: order number on one page, and site number, address, and a table of what is being bought for that site and for what amount on the other.

Here is the agenda.

The board packet, received in response to a LAKE open records request, is on the LAKE website. We also got a copy of the draft minutes for the previous Planning Commission meeting. I don’t know why that was included in response to a request for County Commission packet materials, but we’re publishing it anyway.

LOWNDES COUNTY BOARD OF COMMISSIONERS
PROPOSED AGENDA
WORK SESSION, MONDAY, JULY 22, 2024, 8:30 a.m.
REGULAR SESSION, TUESDAY, JULY 23, 2024, 5:30 p.m.
327 N. Ashley Street – 2nd Floor

Continue reading