Tag Archives: History

Georgia Power raising rates

Georgia Power is raising rates in January, despite its recent announcement that it would lower rates because of lower fuel bills. Why raising? Mostly the new nukes and for a new natural gas plant. And 16% of the rise is for energy efficiency. Does that seem like the right proportion to you?

Kristi Swartz wrote for the AJC 1 Nov 2012, Georgia Power bills to increase,

The average Georgia Power bill will increase about 44 cents a month starting in January, not decrease as many might have expected when the company announced last month its fuel costs had dropped.

The utility, which serves 2.4 million customers, notified state regulators in October that it would be applying for a residential rate reduction because the amount it pays for fuel has fallen 7 percent, saving $122 million. The utility cannot profit from lower fuel costs and must pass those savings on to customers.

So why are customer rates going up?

About $1.05 of the typical residential bill will go toward paying for a new natural gas unit at Plant McDonough-Atkinson in Smyrna. That increase already was approved as part of a three-tiered rate hike set in 2010.

Yep, that’s that set-in-2010 and keep-rising-’till-2013 natural gas rate hike that Georgia Power got away with while complaining about any potential solar subsidies. The one AJC complained would be “on autopilot”: Continue reading

Nuclear reactors near here

If you think of nuclear reactors as something far away, or as much safer than Fukushima, you’re in for a surprise. The most notorious reactors are the ones not yet built, units 3 and 4 at Plant Vogtle near Augusta and their famous financial boondoggle. But others are closer, older, and more numerous than you may know.

Here’s a map by the Nuclear Regulatory Commission (NRC).

That map’s not clickable, so here’s a table, selected from an NRC table by distance from Valdosta:

NameOwnerWhereDistance
from
Valdosta
Hatch 1 & 2* SNOC 11 miles N of Baxley, GA 100 miles
Farley 1 & 2SNOC 18 miles SE of Dothan, AL 125 miles
Crystal River 3 PGN 80 miles N of Tampa, FL 160 miles
Vogtle 1 & 2 SNOC 26 miles SE of Augusta, GA 200 miles
Summer SCEG 26 miles NW of Columbia, SC 300 miles
Saint Lucie 1 & 2 FPL 10 miles SE of Ft. Pierce, FL 325 miles
Oconee 1,2,3 Duke 30 miles W of Greenville, SC 330 miles
Robinson 2 PGN 26 miles NW of Florence, SC 350 miles
Sequoya 1 & 2 TVA 16 miles NE of Chattanooga, TN 360 miles
Catawba 1 & 2 Duke 18 miles S of Charlotte, NC 390 miles
McGuire 1 & 2 Duke 17 miles N of Charlotte, NC 410 miles
Browns Ferry 1,2,3* TVA 32 miles W of Huntsville, AL 410 miles
Turkey Point 3 & 4 FPL 20 miles S of Miami, FL 440 miles
Brunswick 1 & 2* PGN 40 miles S of Wilmington, NC 480 miles
Waterford 3 Entergy 25 miles W of New Orleans, LA 495 miles
Shearon Harris 1 PGN 20 miles SW of Raleigh, NC 498 miles
* GE Mark I; Duke: Duke Energy Power Company, LLC; Entergy: Entergy Nuclear Operations, Inc.; FPL: Florida Power & Light Co.; PGN: Progress Energy; SCEG: South Carolina Electric & Gas Co.; SNOC: Southern Nuclear Operating Company; TVA: Tennessee Valley Authority

Five operating nuclear power reactors are closer to us Continue reading

Fair bidding practices and community public input —Barbara Stratton

Received today on County trash plan already failing. -jsq

Yet another example of government contracting not following the fair bidding practices or allowing community public input. Even if you attend government meetings no bid information is made public & even if bids are referred to the amounts are always in those elusive "packets before you" that only the members have access to.

In a recent Hahira City Council meeting the city attorney ruled that the city council did not have to put out the garbage service for bids & that it did not even have to have a contract. As of December 31, 2012 the city collection services will not be under contract at all so who knows what the rates may be or if a lower bid would have saved citizens money?

Barbara Stratton I've been involved in government contracting for years & I can tell you that the recent path government bodies have endorsed is leading further & further away from the bidding procedures that were enacted to prevent good old boy politics & kick backs & is opening the door wide for public/private partnerships that never answer to the citizens.

The state attorney general's office which should regulate bidding practices will not interfere with county or municipal issues unless a citizen is willing to pay $500 to a lawyer to present the case to them. They justify this as catering to "home rule" but in actuality they are turning a blind eye because it is within their jurisdiction to rule on non-adherence to proper bidding practices.

If the state believes in "home rule" why is Governor Deal pushing a state charter school board amendment that will take away local rule? The state seems to pick & choose its standards.

-Barbara Stratton

-jsq

The power of going solar —John S. Quarterman

Solar panels on farm workshop --John S. Quarterman My op-ed in the VDT today. Remember to vote today or Tuesday. -jsq

This spring, the University at Buffalo turned on 750 kilowatts of solar electricity. Rutgers U., in New Jersey, installed 1.4 megawatts in 2009 and started on 8 MW this summer. Down here with a lot more sun, how about solar panels on VSU parking lots?

There’s plenty of private solar financing available. Also in New Jersey, a company installed 6 MW of solar on high school land and leased the power to the school supplying most of its needs win-win. You can go see a solar farm already working fine here, 200 kilowatts at Mud Creek Wastewater Plant. Why not do the same


View Larger Map

at Lowndes High School, where all the world on I-75 could see, attracting business to our community?

Why not?

Continue reading

VDT and Chamber feuding about which is the most negative

popcorn
Image courtesy Fir0002/Flagstaffotos under GFDL v1.2

Break out the popcorn! The VDT and the Chamber of Commerce are feuding. About which one is the most negative! Also, the Chamber hates agriculture. And everything good around here is to the Chamber’s credit, but anything bad is not their fault; just ask them.

The VDT editorialized 18 October 2012, Is Valdosta really one of the poorest? mostly criticizing the recent report that ranked Valdosta MSA as the third poorest in the country. The VDT added:

Now that the world wide web has broadcast this story, what can be done locally to combat this image? And what are the various entities involved in job and business recruitment, i.e. the Chamber of Commerce and the Industrial Authority primarily, doing to fix the underlying problem — low household income and the high percentage of individuals living below the poverty line.

Valdosta can attract retailers. But can Valdosta step it up and attract larger industries offering high paying jobs? Has the community turned away from what made this a successful, viable up and comer in the state, namely manufacturing and agriculture? These industries sustained Valdosta for many years and provided good, well paying, solid blue collar and middle income jobs. Educational opportunities are far greater today, there are more high school, tech and college graduates in the area than ever, and blaming the quality of the work force is starting to lose its luster as a viable excuse for not bringing in industry. We have the land, we have the workers, we have the infrastructure and we have a great location with a good quality of life.

Perhaps the community leadership should focus on the assets that are already here and less on what’s not. Then maybe the next time a story like this appears on the Internet, Valdosta won’t be cast in such a poor light.

The Chamber fired back a broadside to its members, which I’ve included below here, since I don’t think you can find it online elsewhere. Here’s the most precious part:

Second, while there is still farmland in Lowndes County, it’s shrinking and when it sells, it’s for uses at prices that rule out agricultural use. Agriculture had begun moving to nearby more rural counties even before the cotton field at the end of Baytree Road was paved over for Valdosta Mall. Our largest tractor and farm implement dealers followed.

That’s right, farmland is good for nothing but paving over, so says the Chamber! Nevermind that knowledge-based workers generally like Continue reading

Softbank’s Son to install solar in Japan: watch out, Georgia Power!

The same Masayoshi Son who shook up Japan’s Internet market and is about to do the same in the U.S. is moving to modify Japan’s power market from nuclear to solar. Watch out, Georgia Power and Southern Company! If you don’t get a move on, Son-san will eat your lunch, too.

Mariko Yasu wrote for Bloomberg Businessweek 23 June 2011, Softbank’s CEO Wants a Solar-Powered Japan,

Masayoshi Son Billionaire Masayoshi Son made a fortune taking on Japan’s phone monopoly. Now he aims to shake up its power utilities after the worst nuclear crisis in 25 years. The 53-year-old chief executive officer of Softbank says he will build solar farms to generate electricity, with support from at least 33 of Japan’s 47 prefectures. He’s asking for access to transmission networks owned by the 10 regional utilities and an agreement that they buy his electricity. No other company has secured unlimited access to the those transmission networks. The utilities would not comment. Japan’s main business organization, the Keidanren, called for “careful analysis” before any drastic change in the power system took place.

If Japan ever felt ready to back Son’s ambitious plan, this is the moment. Radiation has spread across at least 600 square kilometers (230 square miles) in the northeast since the Mar. 11 earthquake and tsunami led to meltdowns at the Fukushima Dai-Ichi nuclear plant. Outgoing Prime Minister Naoto Kan said in May he will rethink a plan to increase atomic power to 50 percent of the nation’s energy output from 30 percent. Renewable energy already accounts for 10 percent, according to Japan’s Agency for Natural Resources and Energy. Son wants to see that tripled by 2020. “The question is how this nation is going to survive after cutting nuclear power,” he said at a government panel meeting on June 12.

Complacent Georgia Power and SO, you maybe don’t think he can do it? NTT probably thought that, too:

Continue reading

We can charge you even if it’s cancelled! —CWIPped Georgia Power

Steve Willis An excellent article about the problems with Georgia Power’s new nukes on the Savannah River gets at something you may not know: they can charge you for them even if they’re cancelled!

Steve Willis wrote for the Georgia Sierran Oct./Nov./Dec. 2012 page 5, Overruns, Uncertainty Plague Vogtle Expansion,

If Southern Company abandons this project, the CWIP law not only allows Southern Company to keep all of the CWIP payments legally extorted from customers, but allows them to keep CWIP fees in place or even increase them until all their costs and profits have been fully recovered. Due to the run-away cost overruns, the CWIP charge on your monthly bill is already more than three times what Southern Company confidently claimed it would be at this time when they presented their case to “your” Georgia legislature in 2009.

And that 2009 legislature rubberstamped CWIP so it appears on your Georgia Power bill as Nuclear Construction Cost Recovery Rider. Willis reminds us that the 2 nukes already at Plant Vogtle were projected to be four nukes for $600 million and ended up being two for $9 billion.

Everyone has heard the saying “Fool me once, shame on you; fool me twice, shame on me.” If the Vogtle expansion costs balloon, as many analysts expect, it will cost

Continue reading

Georgia Power hikes prices for gas and nuclear, then complains about solar

Back in February, Georgia Power's natural gas Plant McDonough Georgia Power argued that a free market in solar power would cause price increases. Yet they already increased prices for natural gas and for nuclear plants that won’t produce electricity for years, if ever, and are already massively overbudget and behind schedule. Why should we believe them about solar when it’s their archaic projects they already are deploying that already have increased customer prices?

In February, Greg Roberts of Georgia Power argued,

Another reason is that the customers of Georgia Power, Georgia’s Georgia Power is the snail in the way of solar power in Georgia EMC’s and Municipal Electric Authority of Georgia are paying for the poles and wires to transmit power, and the back-up generation to cover the electricity needs when the sun isn’t shining. These costs will have to be recovered from other customers not getting the privileged deal from the developer, raising everyone else’s rates.

While there are already numerous federal and state tax and other incentives for solar development in Georgia, it is still much more costly than the service provided by utilities. But what if third-party solar developers could get other electric customers in Georgia to foot the bill? That would be the result of this legislation.

It’s like asking Sally’s Café to pay the electric bill of Joe’s Cafe across the street, thus allowing Joe to undercut Sally’s prices.

Georgia Power well knows they could take a percentage of any power transmitted through their lines, so that wires and poles and backup generation argument is ludicrous. And as far as subsidies, how about this one, Georgia Power, Get the Facts, Investing in Georgia’s Energy Future:

Continue reading

Valdosta: 3rd poorest city

Valdosta #3! Followed by Albany #4! In poorest cities in the country. What can we do about that?

Michael B. Sauter, Alexander E.M. Hess and Samuel Weigley, 24/7 Wall St., wrote for NBC News 14 October 2012, America’s richest and poorest cities,

3. Valdosta, Ga.
  • Median household income: $32,446
  • Population: 140,599 (87th lowest)
  • Unemployment rate: 9.2 percent(140th highest)
  • Percent households below poverty line: 27.6 percent (ninth highest)

From 2007 to 2011, the unemployment rate in Valdosta increased by 130 percent, from 4 percent of workers to 9.2 percent. The number of employed workers declined by more than 6,000 during that time. Those jobs remaining often pay a lower salary. Last year, nearly 17 percent of the work force was employed in the generally low-paying retail industry, the sixth highest percentage of all metro areas. In 2007, just 11.3 percent of the labor force worked in retail. Valdosta, however, has an improving and active housing market. Home prices rose nearly 12 percent between 2007 and 2011. Despite these positives, 14.4 percent of housing units were vacant last year, higher than the national vacancy rate of 13.1 percent. Also, 15.3 percent of homes were worth less than $50,000 versus 8.8 percent nationwide.

The study is actually for “U.S. metropolitan statistical areas, or MSAs” and this population is not just for Valdosta, it’s for the Valdosta MSA, which includes Brooks, Echols, Lanier, and Lowndes Counties.

Look who’s next on the list:

Continue reading

Video Playlist @ LCC 2012-09-25

Fewer speakers at the Regular Session than at the previous morning’s Work Session of the Lowndes County Commission. The longest item was a citizen wishing to be heard, who only spoke for 3 and a half minutes. Up until then, the meeting took five minutes, as the Chairman noted. And everything was adopted unanimously, with little or no discussion.

Here’s the agenda, annotated below with links to the videos and a few notes, and followed by a video playlist.

  1. Call to Order
  2. Invocation
  3. Pledge of Allegiance to the Flag
  4. Minutes for Approval
    First the Chairman welcomed Leadership Lowndes.
    Then both sets of minutes were unanimously approved with no changes.
    1. Work Session — September 10, 2012
    2. Regular Session — September 11, 2012
  5. For Consideration
    1. Bevel Creek Lift Station Repair —Mike Allen
      The total for the wastewater lift station was still $38,969 with the budget impact being the insurance deductible. Unanimously approved.
    2. Dell Lease Agreement for Sheriff’s Office Laptops —Aaron Kostyu
      Six years ago the Sheriff’s Dept. leased some laptops; plan was always to roll new laptops into the lease; that will be done using drug seizure funds. Unanimously approved.
    3. Contract with Corporate Health Partners
      County Manager Joe Pritchard said they had started looking into wellness plans several years ago, $260,000 in savings in health care expenses so far; partnership with SGMC and YMCA. Commissioner Joyce Evans wanted to know how regularly it would be monitoried. Answer: quarterly. Commissioner Richard Raines moved to approve Corporate Health Partners, except instead of a three year contract, an initial one year with two one-year extensions. Unanimously approved.
    4. Agreement with Basic Life
      Joe Pritchard alluded to yesterday’s presentation from Chris Park(? Clark?) recommending a change to basic life coverage, with an approximate annual savings of slightly over $10,000. Unanimously approved.
  6. Reports-County Manager
    Joe Pritchard had no report.
  7. Citizens Wishing to be Heard Please State Name And Address
    Chairman Ashley Paulk noted it was 5:35, and then Ken Klanicki spoke for 3 and a half minutes, the longest item in the meeting, after which they adjourned.

Video Playlist
Regular Session, Lowndes County Commission (LCC),
Videos by Gretchen Quarterman for Lowndes Area Knowledge Exchange (LAKE),
Valdosta, Lowndes County, Georgia, 25 September 2012.

-jsq