Tag Archives: Georgia

18-wheeler on Hambrick Road, and No Trucks Over 10 Wheels sign

This is what Gretchen meant when she told the Lowndes County Commission trucks too big use Hambrick Road as a short cut, when GA 122 is 0.4 miles farther up Cat Creek Road.

You can see who owns this particular truck, but it’s far from the only one. And in case you had any doubt where this is, Continue reading

Videos: Hambrick Road paving and traffic and Bevel Creek bridge @ LCC 2016-04-26

Thanks to County Engineer Mike Fletcher for doing almost what Gretchen asked at the Lowndes County Commission Regular Session 26 April 2016.

They rattled through the agenda with almost no questions, unanimously approving everything, including the $89,005 in emergency no-bid repairs. You’d have little idea why they were doing anything if you weren’t at the previous morning’s Work Session or you didn’t view the LAKE videos of the Work Session, in which we discovered for example it’s not Beatty Creek Bridge, rather Bevel Creek Bridge. Nonetheless, the County Engineer still said the creek name wrong.

Here are links to each of the LAKE videos of the Regular Session of April 26th 2016, with a few notes, followed by a video playlist. See also the LAKE videos of the Work Session of April 25th 2016, and the agenda.

They meet again this morning at 8:30 AM. Continue reading

Appointment, big subdivision w of Hahira, Hwy 84 lift station pump @ LCC 2016-05-09

This morning, coyly considering appointing “an elected official” (I’d bet Joyce Evans) to the South Georgia Community Service Board and reappointing Mr. Shamb Purohit, at the Lowndes County Commission, 9 May 2016. A 7-acre subdivision REZ-2016-10 Freedom Heights, 4301 Bemiss Rd and a 173-acre subdivision west of Hahira on Franks creek, and a pump fo the Hwy. 84 Lift Station, all also on the agenda to be voted on tomorrow evening. Continue reading

Solar farm or fracked methane pipeline with explosions?

Which do you want? A 31 megawatt solar farm such as is building next to Albany, Georgia, built by Southern Company subsidiary Georgia Power to power 5,000 homes, and that won’t leak or explode? Or the Sabal Trail fracked methane pipeline that could blow up like


Photo: US Army/Fort Benning.


KERRY JOBE VIA AP

another Spectra Energy 36″ pipeline this morning in Pennsylvania, badly burning a man and incinerating his house? After which Spectra declared force majeure, which Bloomberg spells out as “Force majeure is declared to remove a company from contractual obligation because of events beyond its control.” So apparently any promises Spectra or Sabal Trail made to you, your city, county, or state, it can just declare force majeure and get off the hook. Even for a 40-mile-long and 4,000-foot-high plume of smoke.

Russell Grantham, AJC, 29 April 2016, Old power gives way to new power in south Georgia, Continue reading

Mutual aid, Variance, Remerton Mills Quitclaim @ RCC 2016-04-04

Only the smoke stack remains, yet Remerton Mills still took up most of the Remerton City Council agenda when Gretchen videoed there this month. The Humane Society wants to house dogs temporarily and house an adoption site for cats. This also requires a variance. Yes, apparently Remerton has more room for animals than Valdosta.

Here are links to the LAKE videos of each item, from the agenda. Also notice Remerton has Citizens to Be Heard first, like both Lowndes County and Valdosta used to have only a few years ago. Continue reading

Videos: Emergency no-bid repairs, a bridge where, and unnecessary resurfacing @ LCC 2016-04-25

5.e. Emergency Fiber Replacement to South Lowndes The FY 2017 Juvenile Justice Incentive Grant was a popular topic yesterday morning, and some Commissioners showed a little bit of scepticism about that $89,005 in emergency no-bid repairs on the agenda for yesterday morning and for voting 5:30PM this evening.

Also $634,800 for a bridge we can’t tell where, and some unknown fraction of $1,663,888.78 to resurface a road that shouldn’t be used as a highway in the first place. Who’s in charge of budget planning for the county?

At the end, there was more from the County Manager about private road Carter Way: they discovered another property owner (“at least one”) after they agreed to spend $67,822 to fix a private road.

Here are links to each of the LAKE videos, with a few notes, followed by a video playlist. Continue reading

Halliburton says fossil fuels unsustainable, lays off a third worldwide, including management

You know things are bad for fossil fuels when the biggest profiteer of them all takes an axe to itself. The fewer fossil fuel boondoggles (including more pipeline projects going belly-up), the faster investment will keep moving to renewable sun, wind, and water power, for profits, and we get clean air and water and less global warming.

“Tyler Durden”, Zerohedge, 22 April 2016, Halliburton Fires One Third Of Global Staff: “What We Are Experiencing Today Is Unsustainable”,

In a brutally frank and painfully honest first quarter operational update, Halliburton president Jeff Miller poured freezing cold water all over the “oil is stabilizing, and everything is going to be awesome” narrative. After explaining that the firm has laid off one-third of its global employees, and pointing to the collapse in sequential revenues across every business unit, Miller exclaimed: “What we are experiencing today is far beyond headwinds; it is
unsustainable.”

Due to the deadline of its merger agreement with Baker Hughes Halliburtion has delayed its earnings conference call until May 3rd and so gave an operational update. The healdlines were horrific:

Road paving and Alapaha BoatRamp in Naylor Town Hall @ LCC 2016-04-14 @ LCC 2016-04-14

Most people wanted to know which roads would be paved when, in Bemiss, to Alapaha Subdivision, and next to the new Civic Center. Steve Stalvey (Utilities), Mike Fletcher (Engineer), Joe Pritchard (County Manager), Joyce Evans (Dist. 1), George Page (VLPRA), Paige Dukes (County Clerk), Demarcus Marshall (Dist. 4), Bill Slaughter (Chairman), seated: Robert & Carolyn Dinkins They did also talk about the planned new civic center and the Alapaha Boatramp they’re building.

I thank the Chairman for clarifying his remark about paving every road in the county. He and other county officials also went on about safety being a big concern, which is news to me, on my road the county insisted on paving that became a drag race track. And what’s this about Continue reading

Emergency no-bid repairs, a bridge where, and unnecessary resurfacing @ LCC 2016-04-25

$89,005 in emergency no-bid repairs on the agenda for Monday morning and voting Tuesday evening. Agenda Sheet Also $634,800 for a bridge we can’t tell where, and some unknown fraction of $1,663,888.78 to resurface a road that shouldn’t be used as a highway in the first place. Who’s in charge of budget planning for the county?

Why is replacing the fiber optic data cable that connects the South Lowndes Data Center and the E911 Center an emergency repair for $61,020, when apparently the problem has been going on for years? Meanwhile, it’s good that it’s not an emergency that the 911 Center Core Network Equipment needs replacing for $38,621. Planning ahead is good. Is one of these items in the budget and the other not?

Another emergency not marked as such in the agenda is Continue reading

Carter Way Correction by Bill Slaughter @ LCC 2016-04-12

Thanks to Lowndes County Chairman Bill Slaughter, here’s a correction to Fixing private road Carter Way next to proposed Sabal Trail fracked methane path @ LCC 2016-04-12.

From: Bill Slaughter
Subject: Carter Way
Date: Mon, 18 Apr 2016 21:04:14 +0000

John,

I got a call today regarding comments that have been made about Agenda Item 7.h on your blog page, for clarification COWART & Sons was not awarded a contract for this emergency repair the contractor was Rountree Construction!

We requested a temporary easement from property owner Cowart & Sons to allow Rountree Construction to perform the work on a private road Continue reading