Tag Archives: Georgia

Southern Company buys 157MW Roserock Solar Farm in Texas

That’s great, but how about more of those hundreds of construction jobs and operation money right back here to Georgia? But since you’re buying solar power, why do you need to buy a pipeline company? How about helping us against Sabal Trail invading us from Texas through Southern Company territory?

Southern Company PR, 30 November 2015, Southern Company subsidiary acquires first solar project in Texas,

Continue reading

Cell tower, cemetery, sewer, and radio tower @ ZBOA 2015-12-01

Two ZBOA agenda items for tomorrow are also on the Planning Commission agenda for tonight: the Withlacoochee River Wastewater Treatment Plant and the radio tower Snake Nation Press for WSNK-LP, Valdosta Community Radio. Apparently both of these applicants want a variance from ZBOA in addition to a conditional use permit.

Verizon wants a variance in Hahira for a cell tower and the Lucas Brothers want a cemetery variance.

Valdosta-Lowndes County Zoning Board of Appeals

Continue reading

MAZ, Tillman Crossing, Withlacoochee River WWTP, 7 * Valdosta @ GLPC 2015-11-30

An invisible change to Valdosta’s Withlacoochee River Wastewater Treatment Plant. Already a subdivision rezoning after the old US 41 N widening. And still going in its third year, the Moody Activities Zones (MAZ) Text Amendments, with updates last week, including the Chamber’s latest position, all on top of the previous updates. Those are just the Lowndes County cases on the agenda tonight for the Greater Lowndes Planning Commission (GLPC).

The six Valdosta cases include a funeral home, a radio station, a church accessory, a community commercial rezoning, an amendment to a Planned Development, and City of Valdosta sign regulations changes.

All that plus Continue reading

MAZ and Tillman Crossing Packet Updates @ GLPC Work 2015-11-23

Updates about Moody, Tillman Crossing, and the Withlacoochee River Wastewater Treatment Plant, Non-Conforming Lots, MAZ Map, 2015-11-03 (1 of 2: New Bethel Road) for tonight’s Planning Commission meeting, received after last week’s GLPC Work Session. I would post tonight’s GLPC agenda, but it’s not on the county’s website.

See the surprise addition in this update of REZ-2015-20 City of Valdosta WWTP, about which details were not included: “The proposed site plan is the same one that was presented to you with your paperwork last night.” So if you’re not a Planning Commissioner, you don’t get to see what the City of Valdosta is proposing for its new Withlacoochee River Wastewater Treatment Plant.

Another item is apparently known by several names: Continue reading

A clean energy future is already arriving –350.org & LNS

I’m thankful we’re already on the way to a clean energy future, Big Light bulb with more jobs, less expense than doing nothing, no new nukes, no coal at all, much less natural gas, no need for any new pipelines, better health, clean air and water, and profit. The COP meeting in Paris can do what it will, and we can still make a better world and profit by it. We’re already doing it, with solar and wind power, energy efficiency and conservation,

The Clean Energy Future: Protecting the Climate, Creating Jobs, Saving Money, by Frank Ackerman of Synapse for LNS and 350.org:

[M]eeting the IPCC targets will… create more jobs and save money.

This report, Continue reading

Natural gas leak so bad VDT notices it

Sempra Energy’s California leak stinks so bad the VDT smelled it from 3,000 miles away. But GA Gov. Nathan Deal still can’t smell Sabal Trail over campaign contributions from Sempra and from Spectra Energy.

Brian Melley, AP, 25 November 2015, Utility plans to mask awful odor from uncontrolled gas leak,

LOS ANGELES (AP) — A utility trying to stop a monthlong leak at a massive natural gas storage facility near a Los Angeles neighborhood said it planned to use a mist to mask the sickening stench as work continues — possibly for three more months — to plug the well.

Even the 9-inch pipeline to Berrien County Continue reading

Duke to build solar in Perry, Taylor County, Florida

Still citing clouds after Georgia has become the fastest-growing solar market in the U.S., and ignoring one of its own earlier Florida solar installations, not to mention its numerous ones in North Carolina, Duke Energy Florida takes a baby step of a 5 megawatt solar installation in Florida.

Susan Salisbury, Palm Beach Post, 15 October 2015, Duke Energy to construct solar facility in North Florida,

Duke Energy Florida Thursday announced plans to construct a new solar facility in Perry, which is in Taylor County in the Big Bend region.

This will be the second Continue reading

Updated Packet for Moody Activitiy Zones (MAZ) @ GLPC Work 2015-11-23

Details of massive revisions to the proposal for changes to the Moody Activity Zoning Districts, sent by County Planner Jason Davenport to the Greater Lowndes Planning Commission (GLPC) and the Lowndes County Commissioners on 11 November 2015, in advance of the GLPC’s 23 November 2015 Work Session and 30 November 2015 Regular Session. He copied LAKE due to an open records request from Gretchen Quarterman. The whole thing is on the LAKE website.

Especially interesting are two slides apparently intended to finally the question on everyone’s mind of which developers are these changes for?

Why are we here?

  • To improve the MAZ Regulations
  • 2012 Rezoning Case & Text Amendment
  • County Leadership (Direction)(lnitial Goal June 2015)
  • County Planner (Implementation and Support)
  • Response to Continue reading

Videos: Law, radio, solid waste, busses, and qualifying fees @ LCC 2015-11-09

The bid on three pursuit vehicles for the Sheriff got a question from Commissioner Scottie Orenstein about maintenance costs for which a staffer from Public Works just happened to be available to answer. Result: not the low bid. Commissioner Demarcus Marshall asked if they were going to pay $7,000 more per vehicle ongoing. Answer from County Manager Joe Pritchard: case by case. This was Monday morning 8:30 AM. They vote this evening (Tuesday) at 5:30 PM.

There was also a report from County Engineer Mike Fletcher about coordination with the railroad about traffic crossing from Old US 41 N.

Here’s the agenda. Below are links to each of the videos, followed by a video playlist. Continue reading

Law, radio, solid waste, busses, and qualifying fees @ LCC 2015-11-09

Monday morning 8:30 AM: a million bucks for road paving (Phillips Road, Burkhalter Subdivision, Cannon Drive, and Terracewood Drive), and an unknown (but smaller) amount in a grant re-application for the county’s on-demand MIDS bus system.

$30,534 plus shipping for two “screwpeller aerators” for the county’s Land Application Site (LAS), aka spray field: the county does not have a wastewater treatment plant. I’m pretty sure that’s the county’s LAS just east of Grassy Pond, southwest of Lake Park.

It only costs $360 to qualify to run for Tax Assessor, here in the only Georgia county that elects them.

Here’s the agenda. Continue reading