Appoint Tax Assessors, 3 water, 3 road, 1 pandemic, 1 software @ LCC 2020-09-21

Applying this morning for Board of Tax Assessors are Mr. Gene Felts and Mrs. Gretchen Quarterman. The Lowndes County Commission will vote tomorrow (Tuesday) at 5:30 PM. That and almost $4 million in water, road, software, and fire items.

Cost What
$1,681,770.84Grading, Drainage, Base, and Paving of Clyattstone Road and Simpson Lane.
$1,417,333.98Clyattstone Water Main Extension
$489,310.00Motorola SUAII (Evergreen)
$128,075.58Firefighter Personnel Request
$41,217.6.00Foxborough Lift Station Pump
$34,169.28Drainage Improvements to Brinson Lane and Oak Hill Drive
$22,500.00FY2021 Joint Funding Agreement with USGS
$19,800.00Land Application System (LAS) Expansion Agreement
$3,834,177.28Total

Apparently paving does not solve all problems, because one of the four water items is Drainage Improvements to Brinson Lane and Oak Hill Drive to “eliminate flooding issues as a result of the paving of Oak Hill Drive.”. The other three water items are FY2021 Joint Funding Agreement with USGS for the Folsom Bridge (GA 122 Little River & Skipper Bridge (Withlacoochee River) USGS gauges, Foxborough Lift Station Pump, and Land Application System (LAS) Expansion Agreement.

In addition to Brinson Lane, there are two more road items: Grading, Drainage, Base, and Paving of Clyattstone Road and Simpson Lane (how much have they spent on that project combined so far?) and Acceptance of Infrastructure for Val Del Villas. The latter is listed as no cost, despite the Brinson Lane episode.

[Survey Plat]
Survey Plat

Also on the agenda: Grant Submission Request – COVID-19 Response Grant Application, partly to “Recruit and hire a sufficient number of poll workers and inspectors to ensure polling places are properly staffed,” , a Firefighter Personnel Request, and Motorola SUAll (Evergreen) software.

Received in response to a LAKE open records request, the board packet is on the LAKE website. Here is the agenda.

LOWNDES COUNTY BOARD OF COMMISSIONERS
PROPOSED AGENDA
WORK SESSION, MONDAY, SEPTEMBER 21, 2020, 8:30 a.m.
REGULAR SESSION, TUESDAY, SEPTEMBER 22, 2020, 5:30 p.m.
327 N. Ashley Street – 2nd Floor

Continue reading

Videos: River Gauges, Roads, Alcohol, and Fire @ LCC 2019-10-22

The longest items at last month’s voting Regular Session were 3 minutes on 5.b. 2020 Census Resolution (due to discussion about the new initially online methods), two minutes on 5.l. Tax Assessment for the Lowndes County School District Bonds (it’s about debt service on ESPLOST), and 1:44 on 5.k. Industrial Authority Bond Issue and Funding (it’s complicated).

The 5.a. FY2020 USGS Joint Funding Agreement, which adds county funding for the Skipper Bridge Withlacoochee River USGS Gauge to the Hahira Little River Gauge the county has been funding since 2009, breezed through.

Below are Continue reading

Videos: River Gauges, Roads, Alcohol, and Fire @ LCC 2019-10-21

Surprise bonds for the Development Authority and Lowndes County Schools, and a turn lane for Wiregrass Tech, plus a new Forestry Ranger about fire, in these LAKE videos of yesterday morning’s Lowndes County Commission Work Session.

The longest item was five minutes about funding the Skipper Bridge Withlacoochee River USGS Gauge in addition to the Folsom Bridge Little River Gauge, by EMA Director Ashley Tye. Valdosta apparently discovered that Skipper Bridge is not in the city limits, so Valdosta will no longer fund that gauge. But the former funding from the Suwannee River Water Management District (SRWMD) plus more from Lowndes County will cover it, if the Lowndes County Commissioners vote for it at 5:30 PM Tonight, after their discussion yesterday morning.

Georgia Forestry Ranger Randy Spell talked about the use of a vehicle in the Rural Fire Defense Cooperative Lease Agreement And MOU.

Second longest was the extremely vague Continue reading

Packet: River Gauges, Roads, Alcohol, and Fire @ LCC 2019-10-21

Lowndes County is adding funding for the Skipper Bridge Road Withlacoochee River gauge to its traditional since 2009 funding of the Folsom Bridge GA 122 Little River gauge. That’s $8,300 and $14,200, respectively, with another $5,900 for the Skipper Bridge Gauge from the Suwannee River Water Management District. The U.S. Geological Survey (USGS) puts in $900 towards each gauge, or $1800 total. Valdosta still funds the North Valdosta Road US 41 Withlacoochee River Valdosta gauge, and USGS completely funds the US 84 Quitman Withlacoochee River gauge.

[OPTIONS: 1. Approve the FY 2020 Funding Agreement]
OPTIONS: 1. Approve the FY 2020 Funding Agreement
PDF

Details are in the Board Packet now on the LAKE website, received Friday, October 18, 2019, in response to an open records request.

The rest of the Lowndes County Commission agenda for Monday and Tuesday is dominated by roads: a resolution on criteria for taking private roads into the county public road system, and resolutions taking in roads within several subdivisions: Continue reading

Neighbors oppose Val Del rezoning @ LCC 2018-10-09

If not consistent with the Comprehensive Plan, nor with the water and sewer growth plan, fire and rescue doesn’t want it, and the Planning Commission recommended rejecting it, what does it take for the Lowndes County Commission to reject a zoning, in this case for REZ-2018-17 for The Settlement North, 5999 Val Del Road?

Five hands go up, REZ-2018-17

Only three people were allowed to speak against, of the five whose hands went up.

The developer promised restrictive covenants enforced by nobody but the homeowners. County-imposed conditions on the Nelson Hill development, also on Val Del, were largely waived by county staff without public hearings. What promises should we believe?

Will the developer’s demand to ignore the Comprehensive Plan because of “market conditions, supply and demand” prevail? Do property values of neighbors not matter? How about saddling the county school system with houses priced too low for property taxes on them to cover expenses of sending school buses? Or is profit for a few all that matters?

See the Continue reading

Force Main, appointments * 3, Val Del rezoning @ LCC 2018-10-08

A Val-Tech Road 16" Force Main Emergency Repair with recommendation:

The 16” force main between Coleman Road lift station and James Road has experienced repeated issues with pipe failure. Several repairs have been made on one section near 3624 Val-Tech Road. After detecting another pipe failure along this section staff recommends we replace a 400′ section of the 16” force main. This is an emergency and needs to happen ASAP to prevent a sewage spill. Staff received a quote from RPI for $99,935.00. Staff recommends the emergency repair be approved for $99,935.00 from RPI.

I think everyone would be in favor of fixing that recurring leak, near the green dot at the top of this map.

VALORGIS Lowndes County Sewer Line, Val Tech Road
VALORGIS Map → Streams Waterbodies plus Utilities Service Areas and Lowndes County Sewer Line.

Plus the annual USGS Funding Agreement for Hwy 122 Stream Gauge, on the agenda for this morning. Also appointments to three boards, as usual with no previous public invitation to apply: Linda Most reappointment to the Lowndes County Library Board, Clay Griner reappointment to the Lowndes County Public Facilities Authority, and Jim Scruggs reappointment to the Valdosta-Lowndes County Construction Board of Adjustments and Appeals.

A a subdivision rezoning: The Settlement North, 5999 Val Del Road. GLPC voted 5-2-1 against and of TRC only Engineering wanted approval, with the rest saying:

Overall Planning and Zoning found this request inconsistent with with the Comprehensive Plan. Utilities found that development in that area is not supported by the County Water System Growth Plan.

And road abandonment, and quit claims for another road.

LOWNDES COUNTY BOARD OF COMMISSIONERS
PROPOSED AGENDA
WORK SESSION, MONDAY, OCTOBER 8, 2018, 8:30 a.m.
REGULAR SESSION, TUESDAY, OCTOBER 9, 2018, 5:30 p.m.
327 N. Ashley Street – 2nd Floor

Continue reading

Videos: Hurricane Irma, Register rezoning, Utility Authority @ LCC 2017-09-26

23 minutes last night to approve 3:2 with many conditions rezoning the 6c. REZ-2017-09 Robert A. Register Estate, with no shouting afterwards like there was at at the previous evening’s Planning Commission meeting, yet a lot of grumbling at the Lowndes County Commission Regular Session, especially since they seem to have forgotten the greenspace condition.

Biggest crowd in a long time, REZ-2017-09 Robert A. Register Estate

I would like to commend the Commission for the amount and depth of discussion in this meeting, especially in the unscheduled 10. Commission Comments and Recognitions and Meeting Adjournment, which was mostly about Clay Griner’s idea of having a county-wide utility authority including all the cities in the county. Update 2017-10-20: moved the rest of this utility authority commentary down to the video item below.

Also not on the agenda was Chairman Slaughter comments on community response to Hurricane Irma (which were mostly about county staff; well-deserved especially for Ashley Tye) and Georgia Power Representative recognizes county hurricane response.

While it’s great that Georgia Power came to compliment the county, does that electric utility rep. reside in or pay property taxes in Lowndes County, and why was he not required to state his name and address? Ditto the software salesman for Continue reading

Videos: HEAT on Lake Park @ LCC 2017-09-25

Yesterday morning, most lengthhy at 6 minutes was 6c. REZ-2017-09 Robert A. Register Estate, followed at 2 minutes by 7 a. Amended Motorized Cart Ordinance.

Below are links to each LAKE video of the Work Session of 25 September 2017. See also the previous notes with the agenda. For the three rezoning cases, see also the LAKE videos of the Planning Commission meetings of 28 August 2017 and 25 September 2017.

HEAT on the agenda @ LCC 2017-09-25

This morning, 8:30 AM, all of the items from the previous cancelled meeting are back on the agenda, for voting Tuesday 5:30 PM. Plus four more:

  1. For Consideration:
    1. Addendum to the Withlacoochee Flood Inundation Mapping Project
    2. USGS Funding Agreement for Hwy 122 Stream Gauge
    3. Public Safety Information Technology Purchase
    4. High Enforcement of Aggressive Traffic (HEAT), Document:

      HISTORY, FACTS, AND ISSUES: The certified Lowndes County fatality rate: 2006-14, 2007-14, 2008~19, 2009-16, 2010-18, 2011-15, 2012-11, 2013-7, 2014-14, 2015-19, 2016-20. Any traffic fatality in Lowndes County is too many. For numerous years, the county has been plagued with an unacceptable fatality rate. Consistently for ten years between 2006 and 2016 we suffered with as much as nineteen people dying annually in crashes. In April 2012 the Sheriff created the SPEED team which joined forces with the Valdosta Police HEAT team. Together both agencies diligently fought to reduce the fatality rate. In 2013, Lowndes County recorded an unprecedented lowest rate of the decade with seven fatalities.

      radar gun
      Photo: Valdosta Daily Times

      Soon after, the police department lost their HEAT team which contributed to a Continue reading

Videos: Forestry, river gage, abandon two roads, dedicate another @ LCC 2015-09-21

They vote this evening, about right now. Here are videos of yesterday morning’s Work Session. The Forestry report referred to a report that the public can’t see. What the forestry rep reported was mostly numbers of burn permits.

County Manager Joe Pritchard had to stop Chairman Bill Slaughter from adjourning so he could say: “Friday afternoon we received a request for electronic signalling at highway 41.” County Engineer Mike Fletcher elaborated that it was a railroad pre-empt that would not allow for left turns onto Tillman Crossing when there’s a train. Request came from Norfolk Southern. Chairman agreed to add it to the agenda, then they adjourned.

The annual continued funding for the Little River USGS stream gage at GA 122 costs $400 more this year. Commissioner Marshall wanted to know what happened with the automated gage reporting system he thought they voted for previously, that would send reports when the gage was high. County Manager Joe Pritchard said that was actually the SCADA system for the county’s wells and sewage lift stations. Commissioner Mark Wisenbaker wanted to know how this gage operates. Box on bridge, tube down into river, monitors height and flow, reported through a cell phone, real time data on the web. It’s been there long enough to establish flood stages and advanced warning levels so people can protect their property.

The Abandonment of a portion of Spain Ferry Road and Kinderlou Clyattville Road turns out to be from Continue reading