Tag Archives: Foxborough

Appoint Tax Assessors, 3 water, 3 road, 1 pandemic, 1 software @ LCC 2020-09-21

Applying this morning for Board of Tax Assessors are Mr. Gene Felts and Mrs. Gretchen Quarterman. The Lowndes County Commission will vote tomorrow (Tuesday) at 5:30 PM. That and almost $4 million in water, road, software, and fire items.

Cost What
$1,681,770.84Grading, Drainage, Base, and Paving of Clyattstone Road and Simpson Lane.
$1,417,333.98Clyattstone Water Main Extension
$489,310.00Motorola SUAII (Evergreen)
$128,075.58Firefighter Personnel Request
$41,217.6.00Foxborough Lift Station Pump
$34,169.28Drainage Improvements to Brinson Lane and Oak Hill Drive
$22,500.00FY2021 Joint Funding Agreement with USGS
$19,800.00Land Application System (LAS) Expansion Agreement
$3,834,177.28Total

Apparently paving does not solve all problems, because one of the four water items is Drainage Improvements to Brinson Lane and Oak Hill Drive to “eliminate flooding issues as a result of the paving of Oak Hill Drive.”. The other three water items are FY2021 Joint Funding Agreement with USGS for the Folsom Bridge (GA 122 Little River & Skipper Bridge (Withlacoochee River) USGS gauges, Foxborough Lift Station Pump, and Land Application System (LAS) Expansion Agreement.

In addition to Brinson Lane, there are two more road items: Grading, Drainage, Base, and Paving of Clyattstone Road and Simpson Lane (how much have they spent on that project combined so far?) and Acceptance of Infrastructure for Val Del Villas. The latter is listed as no cost, despite the Brinson Lane episode.

[Survey Plat]
Survey Plat

Also on the agenda: Grant Submission Request – COVID-19 Response Grant Application, partly to “Recruit and hire a sufficient number of poll workers and inspectors to ensure polling places are properly staffed,” , a Firefighter Personnel Request, and Motorola SUAll (Evergreen) software.

Received in response to a LAKE open records request, the board packet is on the LAKE website. Here is the agenda.

LOWNDES COUNTY BOARD OF COMMISSIONERS
PROPOSED AGENDA
WORK SESSION, MONDAY, SEPTEMBER 21, 2020, 8:30 a.m.
REGULAR SESSION, TUESDAY, SEPTEMBER 22, 2020, 5:30 p.m.
327 N. Ashley Street – 2nd Floor

Continue reading

Videos: Office rezoning, Georgia Power, Alcohol, and road abandomnent @ LCC 2017-11-14

They added and agenda item for 7.p. Solicitor-General’s VOCA Grant Renewal; yes, really, the agenda was so long that’s sub-item letter P and the meeting was 51 and a half minutes long.

Longest at seven minutes was 6a. REZ-2017-11 Arrow Engineering, in which the County Commissioners ignored the Planning Commission’s recommendation to deny, and the County Planner’s observation the previous morning that the applicants would accept one acre. Instead they approved 2.5 acres with no conditions as Office Institutional (OI) in an area with no other instances of that.

At six minutes, 7.n. Georgia Power- VisionFirst was about putting $25,000 to hire an unnamed consultant for a joint project for unspecified results.

Update 2017-11-22: According to Chairman Bill Slaughter, the consultant is VisionFirst Advisors out of Tallahassee.

Did they mean the sinkhole-infested Mission Creek instead of 7.k. Grant of Easement for Utility Right of Way Moody-Mission Point?

Five minutes included questions from the Chairman and resulted in a split vote and a stern warning on 7.i. Beer, Wine & Liquor License – Liquor Barn, 3990 N. Valdosta Rd.

One of the two road abandonments, 7.a. Abandonment of Lane Road and a Portion of Sheavette Road, got a very rare split vote, with Commissioner Clay Griner voting alone against.

Below are Continue reading

Videos: Board of Health and an office in the woods @ LCC 2017-11-13

Quite a long Work Session yesterday morning, more than half an hour. Surprisingly, the longest was Liquor Barn’s Wine & Liquor License; apparently their state and county licenses don’t match. They vote tonight at 5:30 PM, in their Regular Session.

Below are links to each LAKE video, followed by a LAKE video playlist. See also the agenda in the previous post, especially about 6a.REZ-2017-11 Arrow Engineering, R-A and E-A to O-I, ~2.5 acres, which is now apparently really for 1 acre. Continue reading

Board of Health and an office in the woods @ LCC 2017-11-13

Stafford Wright Road is getting its 12″ water main, connecting all the way from Spring Creek subdivision off of Studstill Road to Val Del Road. That’s Nelson Hill on the center left and Foxborough lower left: subdivisions like that are what to expect on Stafford Wright Road soon.

Spring Creek Blvd. E. to Val Del Rd., VALORGIS
Map: VALORGIS. Green is Lowndes County sewer line; blue is water mains.

This appears to be another no-bid contract, this time for Continue reading

Videos: funded flood map, Behavioral Health Board still vacant, Rezoning also on GLPC Monday, road abandonment, land exchange @ LCC 2016-07-26

On July 26th 2016, they approved up to $40,000 for the Withlacoochee River Flood Inundation Map Project, and I thanked them for that and for considering my modest suggestion. The County Manager, unlike the previous morning, did not mention it’s time for scheduling meetings to set millage rates. Still no applicant for the Behavioral Health and Developmental Disabilities Board, but Commissioner Joyce Evans thought she had a prospect for later.

They approved the event center rezoning which also sailed by the previous night’s Planning Commission.

Below are links to each LAKE video with a few notes, followed by a video playlist. See also Continue reading

Videos: Vacant seat Behavioral Health Board, Rezoning also on GLPC Monday, road abandonment, land exchange, and flood map project @ LCC 2016-07-25

They didn’t have an applicant for the Georgia Department of Behavioral Health and Developmental Disabilities at Monday morning’s Work Session; Chairman Bill Slaughter invited anyone who wanted to apply to speak up. The Withlacoochee River Flood Inundation Map Project had the longest discussion, and the County Manager reminded everyone it’s time for scheduling meetings to set millage rates. They vote tonight at 5:30 PM; see Continue reading

Vacant seat Behavioral Health Board, Rezoning also on GLPC Monday, road abandonment, land exchange, and flood map project @ LCC 2016-07-25

Public hearings for the event center rezoning and the Abandonment of a Portion of Worthington Triangle are on the agenda for the Monday morning Work Session and for voting in the Tuesday evening Regular Session. That rezoning is also (back) on Planning Commission agenda for Monday evening.

And back on the County Commission agenda is the Withlacoochee River Flood Inundation Map Project; see LAKE videos from the previous County Commission meetings, and a modest suggestion.

Also in water, another LAS Pump Motor Repair and a Foxborough Pressure Reducing Valve/Vault. It was actually an LAS pump control panel last month.

LOWNDES COUNTY BOARD OF COMMISSIONERS
PROPOSED AGENDA
WORK SESSION, MONDAY, JULY 25, 2016, 8:30 a.m.
REGULAR SESSION, TUESDAY, JULY 26, 2016, 5:30 p.m.
327 N. Ashley Street – 2nd Floor

Continue reading

Videos: Discussion, GLPC, abandonment, septic, pump, and VOCA @ LCC 2014-10-14

Some actual discussion! 20 minutes of it, on 6.b. REZ-2014-16 Bailey, Madison Hwy/Williams School Ln, at the 14 October 2014 Regular Session of the Lowndes County Commission. With no discussion, they approved a single-sourced pump replacement and the DA’s VOCA grant application. They abandoned Water Oak Trail (not Water Oaks Drive), and they reappointed Jody Hall to the Planning Commission with no discussion and no presentation by him. The county now has a twitter account, but the new website still isn’t ready, after how many months?

See the Continue reading

Board Packet @ LCC 2014-10-13

The address is correct for the road abandonment public hearing agenda item The board packet, unlike on the agenda, so if citizens had ready access to this board packet they’d know whether they should show up tonight at yesterday morning’s Work Session and tonight’s Regular Session for 6.a. Abandonment of Unopened Right of Way off Water Oak Drive.

There’s one quote, from xylem, for the Continue reading

Videos: GLPC appointment, abandonment, septic, pump, and VOCA @ LCC 2014-10-13 @ LCC 2014-10-13

300x253 Map on Screen, in Water Oak Trail Road Abandonment, by John S. Quarterman, 13 October 2014 It’s Water Oak Trail, not Water Oak Drive, for the road abandonment: how are people supposed to know to show up for a public hearing when the address isn’t even on the right street?

Update 2014-10-14: The board packet has the correct address, so if the county put that packet on its website the citizens wouldn’t be confused. And the lift pump replacement got a single quote for $30,040.20, so this is yet another single-sourced non-competitive deal. Why do Commissioners have no questions about that?

Plus an unscheduled recognition of Leadership Lowndes attendees, a Planning Commission reappointment with no previous advertisement, yet another water pump replacement, a well and septic rezoning on Madison Highway, and a legal grant, on the agenda.

LOWNDES COUNTY BOARD OF COMMISSIONERS PROPOSED AGENDA
WORK SESSION, MONDAY, OCTOBER 13, 2014, 8:30 a.m.
REGULAR SESSION, TUESDAY, OCTOBER 14, 2014, 5:30 p.m.
327 N. Ashley Street – 2nd Floor

Continue reading