Tag Archives: Folsom Bridge

Appoint Tax Assessors, 3 water, 3 road, 1 pandemic, 1 software @ LCC 2020-09-21

Applying this morning for Board of Tax Assessors are Mr. Gene Felts and Mrs. Gretchen Quarterman. The Lowndes County Commission will vote tomorrow (Tuesday) at 5:30 PM. That and almost $4 million in water, road, software, and fire items.

Cost What
$1,681,770.84Grading, Drainage, Base, and Paving of Clyattstone Road and Simpson Lane.
$1,417,333.98Clyattstone Water Main Extension
$489,310.00Motorola SUAII (Evergreen)
$128,075.58Firefighter Personnel Request
$41,217.6.00Foxborough Lift Station Pump
$34,169.28Drainage Improvements to Brinson Lane and Oak Hill Drive
$22,500.00FY2021 Joint Funding Agreement with USGS
$19,800.00Land Application System (LAS) Expansion Agreement
$3,834,177.28Total

Apparently paving does not solve all problems, because one of the four water items is Drainage Improvements to Brinson Lane and Oak Hill Drive to “eliminate flooding issues as a result of the paving of Oak Hill Drive.”. The other three water items are FY2021 Joint Funding Agreement with USGS for the Folsom Bridge (GA 122 Little River & Skipper Bridge (Withlacoochee River) USGS gauges, Foxborough Lift Station Pump, and Land Application System (LAS) Expansion Agreement.

In addition to Brinson Lane, there are two more road items: Grading, Drainage, Base, and Paving of Clyattstone Road and Simpson Lane (how much have they spent on that project combined so far?) and Acceptance of Infrastructure for Val Del Villas. The latter is listed as no cost, despite the Brinson Lane episode.

[Survey Plat]
Survey Plat

Also on the agenda: Grant Submission Request – COVID-19 Response Grant Application, partly to “Recruit and hire a sufficient number of poll workers and inspectors to ensure polling places are properly staffed,” , a Firefighter Personnel Request, and Motorola SUAll (Evergreen) software.

Received in response to a LAKE open records request, the board packet is on the LAKE website. Here is the agenda.

LOWNDES COUNTY BOARD OF COMMISSIONERS
PROPOSED AGENDA
WORK SESSION, MONDAY, SEPTEMBER 21, 2020, 8:30 a.m.
REGULAR SESSION, TUESDAY, SEPTEMBER 22, 2020, 5:30 p.m.
327 N. Ashley Street – 2nd Floor

Continue reading

Videos: River Gauges, Roads, Alcohol, and Fire @ LCC 2019-10-22

The longest items at last month’s voting Regular Session were 3 minutes on 5.b. 2020 Census Resolution (due to discussion about the new initially online methods), two minutes on 5.l. Tax Assessment for the Lowndes County School District Bonds (it’s about debt service on ESPLOST), and 1:44 on 5.k. Industrial Authority Bond Issue and Funding (it’s complicated).

The 5.a. FY2020 USGS Joint Funding Agreement, which adds county funding for the Skipper Bridge Withlacoochee River USGS Gauge to the Hahira Little River Gauge the county has been funding since 2009, breezed through.

Below are Continue reading

Videos: River Gauges, Roads, Alcohol, and Fire @ LCC 2019-10-21

Surprise bonds for the Development Authority and Lowndes County Schools, and a turn lane for Wiregrass Tech, plus a new Forestry Ranger about fire, in these LAKE videos of yesterday morning’s Lowndes County Commission Work Session.

The longest item was five minutes about funding the Skipper Bridge Withlacoochee River USGS Gauge in addition to the Folsom Bridge Little River Gauge, by EMA Director Ashley Tye. Valdosta apparently discovered that Skipper Bridge is not in the city limits, so Valdosta will no longer fund that gauge. But the former funding from the Suwannee River Water Management District (SRWMD) plus more from Lowndes County will cover it, if the Lowndes County Commissioners vote for it at 5:30 PM Tonight, after their discussion yesterday morning.

Georgia Forestry Ranger Randy Spell talked about the use of a vehicle in the Rural Fire Defense Cooperative Lease Agreement And MOU.

Second longest was the extremely vague Continue reading

Packet: River Gauges, Roads, Alcohol, and Fire @ LCC 2019-10-21

Lowndes County is adding funding for the Skipper Bridge Road Withlacoochee River gauge to its traditional since 2009 funding of the Folsom Bridge GA 122 Little River gauge. That’s $8,300 and $14,200, respectively, with another $5,900 for the Skipper Bridge Gauge from the Suwannee River Water Management District. The U.S. Geological Survey (USGS) puts in $900 towards each gauge, or $1800 total. Valdosta still funds the North Valdosta Road US 41 Withlacoochee River Valdosta gauge, and USGS completely funds the US 84 Quitman Withlacoochee River gauge.

[OPTIONS: 1. Approve the FY 2020 Funding Agreement]
OPTIONS: 1. Approve the FY 2020 Funding Agreement
PDF

Details are in the Board Packet now on the LAKE website, received Friday, October 18, 2019, in response to an open records request.

The rest of the Lowndes County Commission agenda for Monday and Tuesday is dominated by roads: a resolution on criteria for taking private roads into the county public road system, and resolutions taking in roads within several subdivisions: Continue reading