Tag Archives: Ethics

Dear Mr. Pritchard: How are we paying on something that was 100% paid off? —John S. Quarterman

I sent this today. -jsq

 
From: John S. Quarterman <questions@quarterman.com>
Cc: bslaughter@lowndescounty.com, jevans@lowndescounty.com, rraines@lowndescounty.com, cpowell@lowndescounty.com, dmarshall@lowndescounty.com, jpage@lowndescounty.com, questions@quarterman.com
Subject: How are we paying on something that was 100% paid off?

Dear Mr. Pritchard,

You may recall that at the Lowndes County Commission meeting of the 8th of January 2013, I asked the following:

“When this building complex was opened in 2010, the county put out a double-sheet flyer saying it was completely paid off out of SPLOST money, with zero dollars owed. I’m wondering how it is that then, either in November or December, the Commission just before your one here, refinanced bonds that included I think it was six or seven million dollars for this very building complex? I’m very confused by that. I wonder if someone could clarify how we’re paying on something that was completely 100% paid off with zero owed.”

I asked Commissioner Crawford Powell this question at the going-away reception for former Chairman Ashley Paulk on 14 December 2012, and he referred me to you for an answer. It has been more than two weeks since I asked in a Commission Regular Session and I have received no answer. So I ask again.

Specifically:

Continue reading

Where is the speed zone ordinance? @ LCC 2011-01-10

Lowndes County won’t install speed control devices: policy or ordinance or “decision”, by whom and when? And where is the speed zone ordinance they passed in January 2011, according to the Work Session Minutes of 10 January 2011:

Adoption of the Revised Speed Zone Ordinance,

County Engineer, Mike Fletcher, presented the Commission with a revised speed zone ordinance in accordance with Georgia Department of Transportation (GDOT) requirements. Mr. Fletcher added that 2 once approved, staff would send the document back to GDOT for execution. Commissioner Evans questioned the speed limit on Boring Pond Road. Mr. Fletcher explained that since the road has been paved, the new ordinance will allow for the new speed to be posted at 45 mph and 55 mph. Mr. Fletcher added that prior to the road being paved, the speed limit was 35 mph. Commissioner Raines asked if the document was a county ordinance. Mr. Fletcher replied yes, adding while the county can make certain recommendations, GDOT prepares the draft in accordance with their regulations.

Chairman Paulk asked Mr. Fletcher to provide those in attendance with a short explanation of speed control devices. Mr. Fletcher explained that in the 1990’s a previous Commission made the decision that speed control devices would not be allowed on county roads due to maintenance and safety issues. Mr. Fletcher added that over time that decision has become policy.

Commissioner Powell stated he had received a request from citizens to increase the speed limit on portions of Old Clyattville Road to 55 mph. Mr. Fletcher replied that due to the curb and gutter installed on the road, he would not recommend it. Mr. Fletcher added he would be glad to check with GDOT to see what the state’s recommendation might be. Commissioner Powell asked Mr. Fletcher to move forward with contacting GDOT.

When “in the 1990’s” was this Commission decision made? In which minutes can we see the vote and the text of this decision?

And how is policy made? By the Commission in an open meeting, or by the staff at some unspecified “over time”?

Plus, where is this speed zone ordinance?

-jsq

Special assessment: ordinance or policy? @ LCC 2011-01-10

Ordinance or policy? In the Work Session Minutes of 10 January 2011 the special assessment rate is set “in accordance with Lowndes County’s financial policies”:

Special Assessment Rate for 2011,

Finance Director, Stephanie Black, presented the proposed special assessment rate at 5.25% (two percent above prime), in accordance with Lowndes County’s financial policies. Commissioner Raines asked if the rate would fluctuate through the year in the event the prime rate adjusted. Ms. Black answered that the county is required to set the rate annually so the actual prime rate would not be considered again until the beginning of next year.

Yet yesterday she said:

“It’s just always been set at 2% above prime. I believe it’s in your ordinance.”

Which is it, a policy or an ordinance? Maybe it’s a policy set in an ordinance. If so, which ordinance? Is it one of the dozen on the county’s website or is it one of the many more that are not?

-jsq

PS: Owed to Jane Osborn.

Work Session Minutes @ LCC 2011-01-10

Ordinance or policy? That question comes up for at least two items, Special assessment and Speed control devices, in the minutes of the 10 January 2011 Work Session of the Lowndes County Commission. -jsq

LOWNDES COUNTY BOARD OF COMMISSIONERS
MINUTES
WORK SESSION
Monday, January 10, 2011
Continue reading

Failed concrete: the bane of nuclear reactors

Let’s not forget the failed concrete on which Plant Vogtle’s unprotected stranded reactor vessel is supposed to sit.

A week before the reactor vessel train wreck, news stories said concrete pouring was delayed due to “noncompliant rebar”. Thomas Clements elaborated for the Aiken Leader 14 January 2013, Vogtle AP1000 Nuclear Reactor Vessel Discovered Unprotected, Stranded in Savannah Port since December 15 Shipment Failure,

Due to chronic delays in the pouring of “nuclear concrete” for the basemat of the AP1000 units at Vogtle and VC Summer, it remains unknown when or if any reactor vessels can actually be placed into the excavated holes at the sites. A January 10 meeting of the NRC confirmed that another basemat-related “license amendment request” (LAR) was soon to be filed by SCE&G for its AP1000 project and that the target date for granting of the LAR was March 18. It appears that the Vogtle project has fallen behind the V.C. Summer project and no strategy for the filing of a similar and necessary LAR by Southern Company is known.

Concrete, the long-time bane of Seabrook Station and also what’s keeping Crystal River shut down because nobody wants to pay the billions of dollars it would take to fix it.

 

What say we call the whole thing off, like Dominion Power did with its existing Kewaunee nuke, and TEPCO and NRG did with their plans for new South Texas nukes.

 

Maybe it’s a sign that meanwhile Google has invested a billion dollars in wind and solar and gotten 2 gigawatts of power, almost as much as the 2.2 GW the two new Vogtle nukes were supposed to produce, except Google’s solar and wind projects are online on time, and for less than just the cost overruns at Vogtle.

The Georgia legislature is in session. You can contact your legislator or the PSC today about toppling Southern Company’s three-legged nuclear regulatory-capture stool and fixing that 1973 Territoriality Law so we can get on with solar and wind in Georgia, for jobs and energy independence, and oh by the way clean air and plenty of clean water.

-jsq

Centralized Nuclear Bad Investment?

A writer for Forbes spells out the question of nuclear investment: how can something that expensive, over-budget, late, and phenomenally risky be a good investment, especially when cheaper and faster energy sources are readily available?

Peter Kelly-Detwiler wrote for Forbes today, New Centralized Nuclear Plants: Still an Investment Worth Making?

Just a few years ago, the US nuclear renaissance seemed at hand. It probably shouldn’t have been. Cost overruns from Finland to France to the US were already becoming manifest, government guarantees were in doubt, and shale gas drillers were beginning to punch holes into the ground with abandon.

Then came Fukushima. The latter proved a somewhat astonishing reminder of forgotten lessons about nuclear power risks, unique to that technology: A failure of one power plant in an isolated location can create a contagion in countries far away, and even where somewhat different variants of that technology are in use. Just as Three Mile Island put the kaibosh on nuclear power in the US for decades, Fukushima appears to have done the same for Japan and Germany, at a minimum. It certainly did not help public opinion, and at a minimum, the effect of Fukushima will likely be to increase permitting and associated regulatory costs.

He goes into detail: they take too long (while gas and solar got cheaper), they’re extremely expensive to build and run, and they’re all-or-nothing investments.

I was going to compile this list of recent nuclear financial failures, but he saves us all the trouble:

Continue reading

Vogtle reactor vessel sitting unprotected at Savannah port

What happened to Plant Vogtle’s new reactor vessel after it was in a train wreck a week ago? It went back to Savannah port and sits there unprotected and unguarded.

Thomas Clements wrote for the Aiken Leader 14 January 2013, Vogtle AP1000 Nuclear Reactor Vessel Discovered Unprotected, Stranded in Savannah Port since December 15 Shipment Failure,


Tom Clements, Alliance for Nuclear Accountability

The reactor pressure vessel (RPV) for the chronically delayed Vogtle AP1000 reactor construction project near Waynesboro, Georgia sits stranded and seemingly unprotected in the port of Savannah. The special railroad car carrying the 300-ton vessel had unknown mechanical problems on December 15 on exiting the port. The NRC has said that the vessel only got one-quarter mile before a sound was heard and the car stopped. Plans by Westinghouse and Southern Company to move the vessel are unknown. It is also unknown if the railroad car can be repaired and used or if the railroad company which owns the line is concerned that the rail car might break down again on its line in an in accessible place. Meanwhile, the apparently unguarded reactor might be subject to sabotage and sits in apparent violation of NRC quality assurance and “administrative control” regulations.

The article includes links to several more pictures taken 13 January 2013 by Tom Clements of Alliance for Nuclear Accountability, such as this one with the bridge clearly visible:

Continue reading

Fire in Texas nuclear reactor

Do fires at nuclear plants like Plant Hatch actually still occur? Yep, at the South Texas Nuclear Project, just this week. And that STP Unit 2 is a different design and newer (1989) than Hatch 1 or 2. Austin has been trying to sell its share in that lemon since 1981. Even TEPCO cancelled plans for new reactors there in 2011, due to cost overruns and the Fukushima disaster. What say we cancel our new nuclear lemons at Plant Vogtle?

According to the NRC event report for 9 January 2013:

UNUSUAL EVENT DECLARED DUE TO MAIN TRANSFORMER FIRE

“Fire in Unit 2 main transformer 2A. Reactor trip. Two train of offsite power lost to Unit 2.”

“An Unusual Event was declared based on EAL HU-2—Fire or explosion in protected area or switchyard which affects normal plant operations.”

At 1655 CST, South Texas Unit 2 declared an Unusual Event due to a main transformer fire. Unit 2 tripped from 100% power and is currently at 0% power in Mode 3. The transformer fire is out. In addition to the loss of the main transformer, several safety related electrical busses and non-safety electrical busses lost offsite power. The appropriate emergency diesel generators started and powered the safety related busses. Unit 2 is currently stable and on natural circulation due to the loss of power to the reactor coolant pumps. Auxiliary feedwater is functioning as required and decay heat is being removed through the steam generator atmospheric relief valves. Unit 1 was unaffected by the event.

The licensee notified the NRC Resident Inspector.

Notified DHS SWO, FEMA, DHS NICC and NuclearSSA via email.

According to the NRC, they still don’t know Continue reading

$30,000 saved by library furloughs, $millions for building construction —Idelle Dear @ LCC 2013-01-08

Idelle Dear noted we’re up to 12 library furlough days, and reported a flaw in that picture to the 8 January 2013 Lowndes County Commission Regular Session.

I looked across the street and there are millions of dollars being spent on the construction of the hospital, construction of the VSU Health Sciences building. And yet what is happening, because this is a mandatory furlough for all employees, is that people who are employed by the South Georgia Regional Library, most of whom are minimum wage, work part time, rely on the income: they are going to lose out….

We’d heard about these state-mandated furlough closings at a library board meeting. Idelle Dear spelled out some of the consequences, and made some telling comparisons.

Something is wrong with this picture, and I realize there are different kinds of money, but something is wrong with this picture if we can spend millions and millions of dollars on construction of these buildings and yet shut down the library and the employees who are in low income are going to be affected.

She said she wasn’t sure most people even knew about all this. And she heard somebody had said most people have Internet at home, but

Continue reading

Stripe some roads! —Former Commissioner Richard Lee @ LCC 2013-01-08

The ghost of Commissions Past, in the form of former Commissioner Richard Lee, pointed his finger at the Commission and staff at the 8 January 2013 Lowndes County Commission Regular Session.

Richard Lee congratulated the current Commissioners on being willing to serve. He pointed at Commissioner Joyce Evans as having been to this rodeo before. He said they could trust County Manager Joe Pritchard. And he asked them to find money to stripe roads.
So if y’all can find some coins, and Mr. Prichard has a real knack for doing that, we’d appreciate it up in my end of the county.

That’s curious, since Mr. Pritchard can’t seem to to keep the solid waste collection stations open, or for to keep libraries open, or even for a bus for 4-H without children doing much of the heavy lifting.

But Mr. Lee is confident Mr. Pritchard can find funds to stripe roads in Mr. Lee’s neighborhood!

Here’s the video:

Continue reading