Tag Archives: Environment

Why must the small business owner be discarded? —Deep South Sanitation

Cary Scarborough, owner of a local sanitation business, previously asked the Commission not to grant a monopoly on waste collection. He was quoted in today’s VDT article, and he has elaborated on his company’s facebook page.

To the Commission, 13 November 2012:

Don’t do this to private enterprise, to an individual. If it’s done to me, it will get easier later down the road to do it to someone else.

In the VDT:

“I have not been told by the County that what I’m doing is illegal,” Scarborough said. “But I realize they’ve drawn up an ordinance, and they’re probably going to say that it’s illegal. If they come after me, I guess they have to come after me.”

Scarborough believes that if the citizens aren’t required to contract with Advanced Disposal, they are then allowed to choose.

“If the citizens can choose, why can’t they choose me?” he said.

On Deep South Sanitation’s public facebook page:

“REGARDING THE ISSUE OF THE TRASH ORDINANCE IN LOWNDES COUNTY”

Continue reading

No choice on trash —”representatives from Lowndes County”

The VDT went deep under the Lowndes County government’s anonymous cover for an interview with “representatives” who confirmed that unincorporated residents have no choice for trash collection other than the monopoly the Commission granted to a company from New York City.

Jason Schaefer wrote on the front page of the VDT today, County trash ordinance goes into effect Friday: VDT has Q&A with county leadership about new law, burning,

VDT: Lowndes County has said residents aren’t required to sign a service contract with Advanced Disposal. What other services are there in the area, and do they include Deep South Sanitation in Valdosta?

LC: “According to the solid waste ordinance, Advanced Disposal will be the only residential hauler licensed to serve unincorporated Lowndes County. There’s been some confusion about trash collection service in the city. This ordinance is just for unincorporated Lowndes County, not for any of the cities.”

Maybe these were the same “representatives” who sent an unsigned letter saying there were 5,000 residents of unincorporated parts of Lowndes County who didn’t already have curbside service, and they have one choice now: the one-and-only county-appointed purveyor of waste bins. What could possibly go wrong?

Continue reading

Georgia Power to announce 20-year plan Thursday

What will Georgia Power announce for a 20 year energy plan Thursday? Will they (1) just double down on their rate-hike boondoggles for nuclear and gas, or (2) they could flip like Austin Energy in 2003 and Cobb EMC in 2012 and suddenly go solar? The wording here looks like it’s going to be the former. That they even feel compelled to announce some sort of formal plan instead of just shovelling disinformation out another 50 years indicates they’re feeling the pressure to change direction to real sustainable energy: wind and solar power.

Matt Shedd wrote for WUGATV today, Georgia Power To Release Energy Plan,

Georgia Power is set to release a 20-year energy plan on Thursday which will outline a way for the company and the state to be less reliant on coal power. The AJC reports that just 5 years ago, the company’s reliance on coal was at 70 percent.

That number has now dropped to 47 percent. These changes are coming in the wake of Georgia Power’s parent, the Southern Co., being pushed by environmental rules to rely less on coal. Georgia Power won approval to buy electricity produced by natural gas from its sister company Southern Power, which may be part of the company’s future plans.

Thomas A. Fanning, CEO of Georgia Power’s parent The Southern Company (SO), has been touting 70% to 35% reduction in coal since at least May 2012 at the SO shareholder meeting. Fanning continues to emphasize nuclear, gas, and “clean coal” instead of real sustainable energy, namely wind and solar power. He also continues to assert electricity demand will increase, while ignoring conservation and efficiency, which for Georgia could remove all need for new energy, enabling solar and wind to shut down more coal and gas plants, as well as nukes.

So, get out the popcorn and take your bets. Will it be (1) or will it be (2)? I’m betting this time it will be (1), but sooner or later it will be (2), and even Georgia Power, and yes, even Southern Company, will stop digging in their heels and get on the solar train to profits, jobs, energy independence, and oh, by the way, clean air and plenty of clean water.

-jsq

Get a job —Lowndes County to waste site workers

Continuing to ignore its responsibilities to protect public health, safety, and well-being, the Lowndes County government proceeded with its plan to trash rural residents’ waste collection sites, and told part time workers there to get a job.

Jason Schaefer wrote for the VDT today, Trash centers dumped: Final week to make trips to county recycling centers,

The Lowndes County Board of Commissioners near the end of 2012 voted to approve a contract with Advanced Disposal to serve as the sole waste company to conduct curbside trash pick-up in unincorporated Lowndes County. Some citizens remain critical of the change in service, which will cost $12.80 per month, and many are trying to get their last loads to the collection/recycling centers before they close….

Full-time employees at the recycling stations, which are already employees of Public Works, said County Clerk Paige Dukes, will be moved to different positions within the department. Part-time employees will need to find new jobs.

Why might citizens be critical? Continue reading

Rural AIDS: poverty the cause, solar power part of the solution

Director Lisa Biagiotti spent two years travelling around the South interviewing people about AIDS to make a film, deepsouth. She found rural AIDS is a bigger and faster-growing problem than AIDS in center cities, yet most health and prevention funding goes to urban areas. The root cause seemed clear to her: poverty. Here’s some deeper dirt (literally) on rural poverty in the U.S., and one thing we know can help with that: distributed solar power, for jobs, for reduced electrical bills, and for energy independence. What politician wouldn’t want jobs for their constituents?

The director said the screening at VSU at the end of November drew more people than the day before in Little Rock. There were clearly more than 150 in the audience in Valdosta. It’s a topic very relevant to here, as Dean Poling wrote in the VDT 26 November 2012,

Organizers note that Georgia is ranked sixth highest nationally for its cumulative number of AIDS cases reported through December 2009. More than 40,000 known HIV/AIDS cases were reported in Georgia as of 2010.

The South Health District’s 10 counties, which include Lowndes and surrounding counties, report 950 confirmed cases of HIV/AIDS, while many more are likely infected and risk becoming sick because they are not being treated. More specifically, there are about 460 reported cases in Lowndes County.

In reporting these numbers, HIV is the virus (HIV disease) and AIDS is the medical diagnosis made by a doctor of the symptoms, according to South Health District.

It’s a great movie and I highly recommend it. Director Biagiotti spent a substantial amount of her own money and two years to make this film, yet there are aspects she could only note in passing, such as incarceration. She can’t be expected to have researched every aspect; maybe somebody else can step up and help follow more threads.

The movie starts with some maps about poverty and AIDS in the South. It did not, however, look outside the South for poverty. Here are better poverty maps, from the CDC:

Continue reading

Shutdown at San Onofre: permanent this time?

California only has a couple of nuclear reactor locations (unlike the 32 reactors within 500 miles of here), and one is in even worse shape than the other: San Onofre, almost as bad as Crystal River. I’m sure Southern Company would never cut corners or have design or construction problems at Plant Vogtle, right?

Harvey Wasserman wrote for AlterNet 7 January 2013, Showdown at San Onofre: Why the Nuclear Industry May Be Dealt a Big Blow,

Perched on an ocean cliff between Los Angeles and San Diego, the reactors’ owners cut unconscionable corners in replacing their multi-million-dollar steam generators. According to Russell Hoffman, one of California’s leading experts on San Onofre, inferior metals and major design failures turned what was meant to be an upgrade into an utter fiasco.

Installed by Mitsubishi, the generators simply did not work. When they were shut nearly a year ago, tubes were leaking, banging together and overall rendering further operations impossible.

Southern California Edison and San Diego Gas & Electric have unofficially thrown in the towel on Unit 3. But they’re lobbying hard to get at least Unit 2 back up and running. Their technical problems are so serious that they’ve asked the Nuclear Regulatory Commission to let them run Unit 2 at 70% capacity. In essence, they want to “see what happens” without daring to take the reactor to full power.

The NRC has expressed serious doubts. On December 26 it demanded answers to more than 30 questions about the plant’s technical realities. There have been assertions that unless San Onofre can be shown as operable at full power, its license should be negated.

It’s good the NRC got around to doing something, after Continue reading

2 gigawatts of Wind Power off Fukushima, plus solar

Southern Company didn’t do the renewable energy study for Georgia when Mark Z. Jacobson’s study showed All U.S. east coast electricity could come from offshore wind 3 seasons out of 4. Now somebody else has, including how to build offshore wind turbines to withstand hurricanes.

Rob Gilhooly wrote for New Scientist 16 January 2013, Japan to build world’s largest offshore wind farm,

The wind farm, which will generate 1 gigawatt of power once completed, is part of a national plan to increase renewable energy resources following the post-tsunami shutdown of the nation’s 54 nuclear reactors. Only two have since come back online.

The project is part of Fukushima’s plan to become completely energy self-sufficient by 2040, using renewable sources alone. The prefecture is also set to build the country’s biggest solar park.

The wind farm will surpass the 504 megawatts generated by the 140 turbines at the Greater Gabbard farm off the coast of Suffolk, UK — currently the world’s largest farm. This accolade will soon pass to the London Array in the Thames Estuary, where 175 turbines will produce 630 megawatts of power when it comes online later this year. The Fukushima farm will beat this, too.

How will these wind turbines work?

Continue reading

Solar: Pieces of a Puzzle —Dr. Michael G. Noll

Op-ed in the VDT today, responding to a response to my op-ed. -jsq

If the attempt of a guest column from Jan 13 was to shine light on solar power, it left everyone in the dark. Neither mockery nor close mindedness will assist us in finding real answers if we want to solve the energy puzzle of the 21st century.

In July 2012, the Financial Times interviewed Jeffrey Immelt, CEO of GE. GE knows perhaps more about the world of energy business than any other company. Immelt stated that

“on a cost basis it is impossible to justfy investing in nuclar power for the future.”

People who sitll claim that solar is more expensive than nuclear are not paying attention. If solar is viable as far north as New Jersey, it certainly is in Georgia. If countries like Germany can excel in solar energy production, so can we. Companies like Walmart, Costco, Apple, and Google are havily investing in solar because it works.

It should also be noted that the nuclear plant on Crystal River has been idle since 2009. As the Tampa Bay Times reported last December,

Continue reading

China, etc., mining uranium in Niger and Mali

A commenter on Mali: a French War for Uranium suggested that if "that zone" (presumably the Sahara in Mali and Niger) were such an El Dorado the U.S. and the Chinese would have long been interested. Actually, it turns out numerous countries are involved, especially along the Uranium Highway in the Uranium Province in Niger. Not the Americans so much, but definitely the Chinese.

According to World Information Service on Energy Uranium Project, in Mali, it's the Canadians (Cascade Resources Ltd., Northern Canadian Uranium Inc., Rockgate Capital Corp.) and the Australians (Oklo Uranium Ltd).:

The following companies are performing uranium prospection and/or exploration in Mali: Cascade Resources Ltd. , Northern Canadian Uranium Inc. , Rockgate Capital Corp. , Oklo Uranium Ltd

Faléa uranium/silver project

> View deposit info
Opposition to uranium mining in Faléa: Association des ressortissants et amis de la Commune de Faléa (ARACF)

Pre-Feasibility study on Faléa mine project started: On Nov. 15, 2012, Rockgate Capital Corp. announced the commencement of a Pre-Feasibility study on its Faléa U-Ag-Cu project in south-west Mali. Rockgate has engaged the services of the DRA Group of Johannesburg, South Africa to complete the study.

Environmental and social baseline studies commissioned on Faléa mine project: On April 26, 2010, Rockgate Capital Corp. announced that it has commissioned environmental and social baseline studies on the Faléa Project, Mali.

Apparently Niger has more recoverable Uranium than either the U.S. or Canada; more than Kazakhstan; more than any country except Australia.

In Niger, it's Russia, Korea, India, and here are a few notes about Chinese involvement:

Areva ready to give Chinese access to Imouraren uranium mine: French nuclear giant Areva is ready to open up to a Chinese partner the
Continue reading

Failed concrete: the bane of nuclear reactors

Let’s not forget the failed concrete on which Plant Vogtle’s unprotected stranded reactor vessel is supposed to sit.

A week before the reactor vessel train wreck, news stories said concrete pouring was delayed due to “noncompliant rebar”. Thomas Clements elaborated for the Aiken Leader 14 January 2013, Vogtle AP1000 Nuclear Reactor Vessel Discovered Unprotected, Stranded in Savannah Port since December 15 Shipment Failure,

Due to chronic delays in the pouring of “nuclear concrete” for the basemat of the AP1000 units at Vogtle and VC Summer, it remains unknown when or if any reactor vessels can actually be placed into the excavated holes at the sites. A January 10 meeting of the NRC confirmed that another basemat-related “license amendment request” (LAR) was soon to be filed by SCE&G for its AP1000 project and that the target date for granting of the LAR was March 18. It appears that the Vogtle project has fallen behind the V.C. Summer project and no strategy for the filing of a similar and necessary LAR by Southern Company is known.

Concrete, the long-time bane of Seabrook Station and also what’s keeping Crystal River shut down because nobody wants to pay the billions of dollars it would take to fix it.

 

What say we call the whole thing off, like Dominion Power did with its existing Kewaunee nuke, and TEPCO and NRG did with their plans for new South Texas nukes.

 

Maybe it’s a sign that meanwhile Google has invested a billion dollars in wind and solar and gotten 2 gigawatts of power, almost as much as the 2.2 GW the two new Vogtle nukes were supposed to produce, except Google’s solar and wind projects are online on time, and for less than just the cost overruns at Vogtle.

The Georgia legislature is in session. You can contact your legislator or the PSC today about toppling Southern Company’s three-legged nuclear regulatory-capture stool and fixing that 1973 Territoriality Law so we can get on with solar and wind in Georgia, for jobs and energy independence, and oh by the way clean air and plenty of clean water.

-jsq