Tag Archives: electricity

Leigh Touchton wonders what Brad Lofton is hiding

This message was sent to me by the author, who requested I blog it.

-jsq

Subject: My response to Brad Lofton, why doesn’t he want his correpondence in the Valdosta Daily Times? What is he hiding?
From: Leigh Touchton
To: blofton@industrialauthority.com
Date: Thu, 16 Sep 2010 20:53:56 EDT

(Please see correspondence below mine which I am responding to: Mr. Brad Lofton’s email to his “stakeholders” which he doesn’t want to put in the newspaper )

Mr. Lofton:

My title is President of the Valdosta-Lowndes branch of the NAACP, I am not the Chairperson. I have a Master’s in Science in Biology from the University of Virginia, I have taught Environmental Science classes at the college level. It is incorrect and furthermore rude for you to refer to the President of the NAACP as part of the “misinformation on the street.”

I would be happy to deconstruct your arguments on the trip to Cadillac, Michigan, and how “green” Biomass Incineration can be. I invite readers to research all the Biomass incinerators around the country that have been shut down. They are banned in Massachusetts. They have been blocked in Florida. They show up in areas of the country where wealthy industrialists control the government and environmental regulations are lax. All the major environmental organizations in this country oppose them because they burn more wood that can be sustainably harvested. In the decade that is the hottest on record, in a crucial period in human history when life literally hangs in the balance over Global Climate Change, the Lowndes County Industrial Authority has decided to implement a Biomass Incinerator which spews more carbon dioxide than a coal plant.

Continue reading

Industrial Authority Response to Two Letters to the Editor

The appended message from a tax-supported public official to many people about official business was forwarded to me; perhaps the public would also like to see it.

The CCA press conference he mentions seems to have been covered by the VDT in this article: to be about Private prison company picks Valdosta as potential site.

The rest of the letter is about issues related to the biomass plant proposed for Lowndes County by Wiregrass Power LLC (wholly owned by Sterling Energy Assets of Atlanta) and backed by the Valdosta-Lowndes County Industrial Authority (VLCIA), of which Brad Lofton is the Executive Director. Here’s the letter from Leigh Touchton of the NAACP to which he refers.

-jsq

From: Brad Lofton [mailto:blofton@industrialauthority.com]
Sent: Thursday, August 19, 2010 4:37 PM
To: ‘Brad Lofton’
Subject: Industrial Authority Response to Two Letters to the Editor Yesterday
Importance: High

Good afternoon everyone:

Thanks to all of you that were able to attend our CCA press conference and breakfast yesterday. We’ve had positive feedback today from around the region, and we’ve received congratulations from most of the other 15 communities competing for the project.

After reading the two letters to the editor yesterday, I felt compelled to e-mail our stakeholders to provide you an update with facts and information related to the biomass plant. We have intentionally avoided a response in the paper because we do not want to energize a forum for continued misinformation. Despite numerous town hall meetings and other meetings we’ve facilitated for two years, there is still plenty of misinformation on the street.

Continue reading

LTE: Biomass is Environmental Racism

This is a letter to the editor that appeared in the VDT on about 17 August 2010.

-jsq

When Wiregrass Power chose the site for their Biomass plant, they put it near one of Valdosta’s most affluent black communities. There are at least six black churches:  New Life Ministries, Morning Star, Evangel Temple, Southside Church of Christ, Church of Prophecy, Church at Pine Hill. Two predominantly black elementary schools are in the area: Southeast and Moulton Branch. A large senior citizen assisted living community, Sands Horizon, is located in the affected area and serves over 60 families. Scott Park, where the Sands Horizon residents enjoy outings and the local children enjoy baseball games, is located nearby. Huge apartment complexes with several buildings, Park Chase and Brittany Woods, whose residents are primarily people of color, are located near the proposed site.
Continue reading

Solar Parking Lots

One objection I’ve heard to solar power in Georgia is that it would take an area the size of metro Atlanta to power metro Atlanta. Well, why not use metro Atlanta do do that? Put solar panels on housetops and business rooftops. And use parking lots:

Lin Edwards writes in physorg.com about Parking lots could become ‘solar groves’ (w/ Video):

Architect Robert Noble, who specializes in sustainable design has come up with the idea of turning parking lots into “solar groves” that shade the vehicles, generate electricity, and serve as recharging stations for electric vehicles.
Or forget Atlanta. Hahira or Valdosta could do this just as easily.

-jsq

Effects of proposed biomass plants in Massachusetts

Very interesting projection of Massachusetts Forest Impacts if Proposed Biomass Incinerators Are Allowed by Chris Matera, P.E., and Ellen Moyer, Ph.D, P.E., with GIS analysis and programming by Gordon Green:

The animations add the demand for wood for 5 proposed biomass incinerators in Massachusetts to the current wood demand, which is mainly for lumber and cord wood. The animations demonstrate the land area in western and central Massachusetts that would be required to be logged to satisfy the total demand for these 5 plants which would add only about 1 percent to Massachusetts’ electrical generating capacity (see calculations below).

Quite a price for such a small percentage of electricity generation. Solar, wind, and wave could generate far more electricity, even in far northern Massachusetts.

And the animation above is a conservative projection. Follow the link for

…the extreme case where all forested land in central and western Massachusetts would be made available for biomass cutting – including rare species habitat, scenic landscapes, public “protected” land, and other protected open space. In this case, all forested land in central and western Massachusetts would be logged in only 16 years.

In Georgia, that would include places like Reed Bingham State Park.

-jsq

Industrial Authority Projects

Kara Ramos writes in the VDT today about Building industry: A look at current Industrial Authority projects. The Valdosta-Lowndes County Industrial Authority has quite a few interesting projects projected. It will be interesting to see which of them pan out.
Members were in agreement that while there are many students graduating from area colleges, they are moving to other cities to find higher paying jobs. Some board members agreed the local workforce needs improvement to enhance the work of current employees, improve the skills of unemployed individuals, and create more job openings.
Can’t argue with that.

The controversial aspects of the Wiregrass Power, LLC biomass project are not discussed in the article. Instead, the tiny accompanying solar plant gets some press: Continue reading

Encouraging New Energy Production Via Solar

While Georgia did little to deploy renewable energy, Texas has almost doubled its renewable energy source from 2004 to 2006:

How did Texas do that, and how can Valdosta and Lowndes County help Georgia catch up?

Some years back, Austin, Texas, which has been growing rapidly for decades, needed to find a way to produce more energy. Building a coal plant was not really an option for a city that had long sold itself as a home of green industry. Nuclear had a bad taste because in the 1980s Austin had been an investor in the South Texas Nuclear project, which had been late, over budget, never produced what it was supposed to, and had many political problems. So Austin settled on a new plan: instead of spending big bucks to build a dirty coal plant, use the same money to give rebates to homeowners and businesses for installing solar power. Big rebates: 75%, the largest, and among the first in the country. This made perfect economic sense, producing as much new energy as needed, without coal or nuclear, and distributed where it was needed.

Now Austin is trying a new wrinkle:

The Austin, Texas, city council has approved Austin Energy’s solar incentive program, which includes a new approach for commercial, multifamily and nonprofit customers. The new approach saves $2.4 million over the life of the program, according to the utility.
Continue reading