Tag Archives: Control

NRC says it’s “never been a practice” to show licensee documents to the public

After Kendra Ulrich of Friends of the Earth asked about some licensee documents related to last week’s NRC hearing in faraway Maryland on restarting California’s San Onofre nuclear reactor, NRC’s David Beaulieu expanded on NRC’s refusal to divulge the documents.

Here’s the video:

Video by Myla Reson at NRC, Maryland, 18 December 2012.

You can hear him say it’s “never been a practice” to let the public see licensee documents. But if they’re being used in making a license decision, why doesn’t that make them public documents accessible by the public? Oh, right “it’s very complex” but “it’s a yes or no question” and “I will assess”, he says. It’s good to be king!

I wonder if the public had some assurance of transparency maybe the NRC wouldn’t get so many FOIA requests?

Remember, this is the same NRC that gave 100-mile-from-here same-design-as-Fukushima Plant Hatch a 20 year license extension, and the same NRC that gave Plant Vogtle a clean bill of health at a public meeting two days before Unit 1 shut down, and the same NRC that could stop the new nukes there even if the GA PSC won’t.

What if we deployed solar power instead, on budget and on time?

-jsq

Kewaunee nuke is shutting down; why are we building more at Vogtle?

Dominion Power is shutting down a nuke because it can’t compete economically. Why are we letting Georgia Power charge us up front and load us up with debt to build a nuke we already know can’t compete economically? After all, if it could, it wouldn’t need three-legged nuclear regulatory-capture stool that we the rate-payers and taxpayers are already paying on, instead of getting on with solar and wind power.

According to 22 October 2012 PR from Dominion Power:

Dominion (NYSE: D) today said it plans to close and decommission its Kewaunee Power Station in Carlton, Wis., after the company was unable to find a buyer for the 556-megawatt nuclear facility.

According to Dominion:

Kewaunee, Dominion’s fourth nuclear station, generates 556 megawatts of electricity from its single unit. That’s enough to meet the needs of 140,000 homes.

The station began commercial operation in 1974…

1974? That’s the same year as Plant Hatch Unit 1, on the Altamaha River 100 miles from here. (Hatch Unit 2 came online in 1978.) But the Hatch reactors were relicensed in 2002 extending their lifetimes 20 years out to 2034 and 2038, so they won’t be closing, right?

Well, maybe they could. Howard A. Learner wrote for JSOnline 30 October 2012, Market has spoken in Kewaunee shutdown,

Continue reading

NRC doesn’t publish nuclear licensing documents

Kendra Ulrich of FOE at NRC Did you know the U.S. Nuclear Regulatory Commission doesn’t publish nuclear licensee documents? Hear them say it on this video of Tuesday’s NRC “public meeting” in Maryland about restarting the San Onofre reactor in California. This is the same NRC that gave Plant Vogtle a clean bill of health at a public meeting two days before Unit 1 shut down, and the same NRC that could stop the new nukes there even if the GA PSC won’t. Plant Hatch This same NRC recertified Plant Hatch on the Altamaha in Georgia, extending the original 40 year design lifespan of Unit 1 from 2014 to 2034 and of Unit 2 from 2018 to 2038. But don’t worry; if you’re farther than 10 miles from Hatch, you’re outside the evacuation zone, so you must be safe, right? Just study the licensing documents to see; oh, wait!

Kendra Ulrich of Friends of the Earth asked the NRC some simple questions that stumped the Commissioners and staff. She wondered when the public could expect to see a a 50-59 analysis California Edison had done about restarting San Onofre. Dave Beaulieu, NRC Generic Communications Branch, said it was a “licensee document, licensee documents are not made public.” He did say NRC would release its own inspection results. She asked again, and Rick Daniel, NRC meeting facilitator suggested she submit written questions. Beauleiu summarized:

“At the end of the day, licensee documents are not made public; that’s the answer.”

So what would be the point of her submitting questions when she was just told they won’t make the answers public?

Ulrich continued by asking why NRC was considering going ahead on the basis of experimental data that has never been used before and that has not been made public. Remember this is about a nuclear reactor that was shut down because it was leaking. That question sure caused some passing of the buck and pretending not to understand the question by everybody in the room who should have been able to answer the question.

Here’s the video:

Video by Myla Reson, 18 December 2012, Maryland.

Continue reading

School consolidation as disaster capitalism

School consolidation would set up an artificial fiscal disaster that could force the “unified” public school system to turn to private foundations for funding, at the price of control of public education by private entities. This is disaster capitalism, or the shock doctrine, right here in Valdosta and Lowndes County.

What’s the Shock Doctrine? It’s been around for a long time, but Naomi Klein researched it for her book of the same name. It’s

“the rapid-fire corporate reengineering of societies still reeling from shock”
She was writing mostly about wars, terrorist attacks, and natural disasters. Locally here we haven’t had any of those. But we may be about to create a disaster, a shock, at the ballot box in November, if voters fall for the school “unification” snake oil.

What’s the next step after CUEE has accidentally revealed that Continue reading