Tag Archives: Ashley Skipper

Videos: Remerton and Hahira cases @ GLPC 2022-04-25

Remerton at almost 28 minutes was far the longest item at the Greater Lowndes Planning Commission Monday. Second was for Hahira, at 12 minutes. Everything else breezed through.

[Remerton and Hahira Cases @ GLPC 2022-04-25]
Remerton and Hahira Cases @ GLPC 2022-04-25

The sound is not so good because the county has still not fixed the audio in the room.

Below are links to each LAKE video of each agenda item, with a few notes by Gretchen Quarterman, followed by a LAKE video playlist.

See also the Lake Park packet item, which Loretta Hylton of the Southern Georgia Regional Commission sent, saying she heard I was looking for it. It’s now on the LAKE website (PDF). Also, she said “The attorney pulled the Dasher item before submitting it to the Planning Commission.”

We still don’t have the Remerton item. The Valdosta and Hahira items were already on the LAKE website, previously sent by City Planner Matt Martin. We still don’t have the Remerton items. There were no Lowndes County packet items. Continue reading

Big Hahira rezoning, 4 small Valdosta @ GLPC 2022-04-25

Update 2022-04-25: Hahira subdivision proposed near Big Branch of Franks Creek @ GLPC 2022-04-25.

The one big rezoning on the agenda for this evening’s meeting of the Greater Lowndes Planning Commission is HA-2022-06, Sweet Bay Properties, 7440 Union Road, 0024 024, 72 acres, R-15 to R-6, on the site of Guthrie Lumber Company.

Staff recommendation is “Find R-10 zoning consistent with the Comprehensive Plan and the Standards for the Exercise of Zoning Power (SFEZP), and recommend approval of R-10 zoning (instead) to the City Council.”

[Rezonings]
Rezonings

Here is the agenda. The Hahira and Valdosta items, sent by City Planner Matt Martin, are on the LAKE website. The Dasher, Lake Park, and Remerton items are not; LAKE will send Lowndes County an open records request. The minutes of the previous GLPC meeting are not on the county’s website yet, so they are also not included on the LAKE website yet. Continue reading

Packet: Rezonings and Backup Lift Station Generators @ VCC 2022-03-10

In a milestone for Valdosta’s ongoing upgrades to its sewer system, tonight the Mayor and Council will approve the last two of 37 emergency standby generators for lift stations.

[Rezonings and Generators]
Rezonings and Generators

Plus three small rezonings, recommended by staff and the Planning Commission, some with conditions. Another rezoning and annexation were withdrawn by applicant because his sale fell through.

About Item 5.a. Consideration of bids for the purchase of two emergency standby Generators for Lift Stations located at Dillard’s and the Second Harvest Food Bank.

[Photograph]
Photograph

BUDGET IMPACT/FUNDING SOURCE: User Fees

HISTORY: To ensure continued sewage lift station operations during power outages and to satisfy the Georgia Environmental Protection Division requirements, the Utilities Department developed a scope of work to purchase two emergency standby generators. These generators are needed to prevent lift station failures due to power outages from storms or other unexpected causes. Several years ago, the City initiated a program to purchase standby generators or emergency standby diesel pumps for all of its existing sewage lift stations. These are the final two generators needed to complete the Program. Once they are installed, all 37 of our lift stations will have some form of dedicated emergency backup capability from generators and/or backup diesel pumps. Additionally, this will complete Condition 18 of the EPD Consent Order which requires the installation of fixed generators and/or backup pumps at all lift stations by September, 2023. Moving forward, all new City lift stations will include a dedicated emergency backup capability as part of their construction.

See below for the agenda, which does not appear to be on the City of Valdosta’s website. The board packet, received in response to a LAKE open records request, is on the LAKE website.
http://www.l-a-k-e.org/govt/valdosta/2022-03-10–vcc-packet

See also the LAKE videos of the preceding Planning Commission meeting, at which the same rezonings were considered.

AGENDA OF THE VALDOSTA CITY COUNCIL
5:30 PM Thursday, March 10, 2022
CITY HALL, COUNCIL CHAMBERS

Continue reading

Hahira, Valdosta, Lowndes County rezonings @ GLPC 2022-02-28

At the February 28, 2022, Regular Session of the Greater Lowndes Planning Commission, the Valdosta annexation and rezoning requests, 10. VA-2022-02 11. VA-2022-02 Murray Staten Farms, LLC, were both withdrawn by applicant.

All the other requests were unanimously recommended for approval, some with conditions. The various elected bodies will decide.

[Radney]
Radney

In the longest time at nineteen minutes, Four citizens spoke against 5. REZ-2022-04 Radney, 5761 Long Pond Road. Donna Weldon, the President of the Long Pond Property Owners Association, agreed that with the revised conditions accepted by the applicant, the rezoning would be acceptable. Glenn Gregory, the last speaker, emphasized that still more duplexes could be built in that heavy traffic hazardous area. GLPC modified the conditions to retain the conditions prohibiting mobile homes and duplexes, and to add a minimum heated size. Unanimous recommendation for approval with conditions.