Tag Archives: Adoption of Fire District Millage Rate for 2024

Packet: ULDC text amendments, Loch Winn LTD rezoning, adoption of millage rates, USGS stream gauges, sprayfield expansion, watermain interconnection @ LCC 2024-10-14

Update 2024-10-21: Agenda: DRC Emergency Services and VSU South Campus Purchase @ LCC 2024-10-21.

The TXT-2024-03 ULDC Text Amendments are quite long and detailed. The county still has not published them for the tax-paying and voting public to see. You can see them now, because LAKE got them with an open records request, and now they are on the LAKE website.

[Packet: ULDC text amendments, Loch Winn rezoning, millage rates, river gauges, sprayfield expansion, watermain interconnection: Grove Pointe, Nelson Hill @ LCC 2024-10-14]
Packet: ULDC text amendments, Loch Winn rezoning, millage rates, river gauges, sprayfield expansion, watermain interconnection: Grove Pointe, Nelson Hill @ LCC 2024-10-14

It’s good the Lowndes County Commissioners decided Tuesday to table those amendments (and the rezoning) until the Planning Commission can review them.

Cost What
$3,369,213.71 Sprayfield Expansion Phase
$78,392.6.00 Grove Pointe Nelson Hill Watermain Interconnection
$3,025.00 Joint Funding Agreement with USGS for Stream Gauge Maintenance
$3,450,631.31Total

The board packet, received in response to a LAKE open records request, is on the LAKE website.

See also Continue reading

Videos: ULDC text amendments, Loch Winn LTD rezoning, adoption of millage rates, USGS stream gauges, sprayfield expansion, watermain interconnection @ LCC Regular 2024-10-15

Update 2024-10-17: Packet: ULDC text amendments, Loch Winn LTD rezoning, adoption of millage rates, USGS stream gauges, sprayfield expansion, watermain interconnection @ LCC 2024-10-14.

As Chairman Bill Slaughter said they would in the preceding Millage Public Hearing, they adopted the roll back millage rate of 7.356 rather than the advertized rate of 7.804. Last year (2023) the rate was 8.778.

The Fire District Millage Rate is continuing at 2.5 mil. The commission plans to continue this rate for 5 years from the start date. This is probably year 3, so apparently 2 more years.

[Collage @ LCC 15 October 2024]
Collage @ LCC 15 October 2024

They actually did table the 5.a. TXT-2024-03 ULDC Text Amendments and the rezoning 5.b. REZ-2024-15 Loch Laurel – Carroll Ulmer so the Planning Commission could hear them at the October 28 meeting and then voted on at the November 12 Lowndes County Commission Regular Meeting.

There was quite a bit of discussion between Commissioners and Lowndes County Manager Paige Dukes and Utilities Director Steve Stalvey about the Sprayfield Expansion. Continue reading

Videos: Forestry, Weather, ULDC text amendments, Loch Winn LTD rezoning, adoption of millage rates, USGS stream gauges, sprayfield expansion, watermain interconnection @ LCC Work 2024-10-14

Update 2024-10-17: Videos: Millage Public Hearing @ LCC 2024-10-15.

Only in the Work Session this morning, and if you weren’t there, only in these LAKE videos:

[Collage @ LCC Regular 14 October 2024]
Collage @ LCC Regular 14 October 2024

In regular items, County Planner JD Dillard recommended tabling the ULDC Text Amendments until stakeholders have more time to comment. He referred to the copy Commissioners had in their packet. We the taxpayers and voters do not have a copy.

He also recommended tabling 5.b. REZ-2024-15 Loch Laurel – Carroll Ulmer until the Planning Commission can review it. Which indicates that GLPC did not meet last month, even though there was no announcement that it had been cancelled.

Finance Director Stephanie Black said there would be a Millage Public Hearing at 5PM tomorrow, Tuesday, October 15, before the 5:30 PM Regular Session.

There was discussion in 7.a. Sprayfield Expansion Phase I. Continue reading

Agenda: ULDC text amendments, Loch Winn LTD rezoning, adoption of millage rates, USGS stream gauges, sprayfield expansion, watermain interconnection @ LCC 2024-10-14

Update 2024-10-14: Videos: Forestry, Weather, ULDC text amendments, Loch Winn LTD rezoning, adoption of millage rates, USGS stream gauges, sprayfield expansion, watermain interconnection @ LCC Work 2024-10-14.

The long-quorum-and-hurricane–delayed REZ-2024-15 Loch Winn LTD rezoning will probably be decided Tuesday evening by the Lowndes County Commission. Before that, it will be heard at the Work Session Monday morning 8:30 AM, along with suprise ULDC text amendments, two millage rates, river gauges, sprayfield, and watermain interconnection between two northside subdivisions.

The adoption of the regular and Fire District millage rates will presumbably get presentations much like the last Millage Public Hearing on September 19.

We get a one-paragraph summary of TXT-2024-03 ULDC Text Amendments, but not the actual text.

We would have seen the text in the GLPC packet, but back in June the Greater Lowndes Planning Commission abdicated oversight of ULDC text amendments. And in June, the Lowndes County Commission rubberstamped that abdication.

The agenda item says, “9/2024 VDT Advertisements Published (Public Notice)” but I can’t find that in GeorgiaPublicNotice.com.

What is it the county planners and Commissioners do not want the public to see?

[ULDC text amendments, Loch Winn rezoning, millage rates, river gauges, sprayfield expansion, watermain interconnection: Grove Pointe, Nelson Hill @ LCC 2024-10-14]
ULDC text amendments, Loch Winn rezoning, millage rates, river gauges, sprayfield expansion, watermain interconnection: Grove Pointe, Nelson Hill @ LCC 2024-10-14

Here’s a refresher for where this would be, between Old US 41 North and Val Del Road: Grove Pointe Nelson Hill Watermain Interconnection. Continue reading