Tag Archives: Activism

Mali: a French War for Uranium

Google for Mali War in French, and it seems nobody in France is fooled: France is going to war in Mali for oil, gas, gold and… uranium just across the border in Niger. Have you ever heard of a war for sunshine or wind? Let’s get on with solar and wind for energy independence, including from wars for fuels.

Even Le Monde politely asks the question, Pourquoi la France intervient-elle au Mali? Why is France intervening in Mali?

matL : Quels sont les enjeux stratégiques majeurs que présente le Mali, non seulement pour la France mais pour la région entière ? matL : What are the important policy challenges posed by Mali, not only for France but for the entire region?
Les enjeux sur les ressources extractives, à savoir notamment le pétrole et le gaz sur le site de Taoudenni qui se trouve à cheval sur trois pays, Mauritanie, Mali et Algérie. Ensuite, l’uranium puisqu’il en a été découvert dans l’Adar des Iforas. Mais ces trois ressources extractives ne sont pas encore en état d’exploitation. En revanche, le Mali est le troisième producteur d’or sur le continent africain. Ce sont là les enjeux géostragégiques. Issues of extractive resources, notably including oil and gas on the site Taoudenni which straddles three countries, Mauritania, Mali and Algeria. Then, since uranium has been discovered in the Adrar des Iforas. But these three extractive resources are not yet ready to use. However, Mali is the third largest gold producer in Africa. These are the geostratigic issues.
S’il y avait implosion du Mali par la prise du pouvoir central par les groupes armés djihadistes, il y aurait nécessairement des conséquences négatives sur l’ensemble des pays de la sous-région. If there was implosion of Mali by making the central government by armed groups jihadists, there would have negative consequences for all countries in the sub-region.
Visiteur : Bonjour, le gisement d’uranium exploité par Areva se trouve au Niger à quelques centaines de kilomètres à l’est de la zone de combats. Pensez-vous qu’il existe un lien entre l’intervention et la protection éventuelle de cette source d’énergie vitale pour la France ? Caller: Hello, the uranium deposit is operated by Areva in Niger a few hundred kilometers east of the combat zone. Do you think there is a link between the intervention and the possible protection of this vital energy source for France?
En tout cas, l’hypothèse n’est pas du tout à écarter car il y aura des conséquences sur l’ensemble de la sous-région. In any case, the hypothesis is not at all ruled out because there will be an impact on the entire sub-region.

Stéphane Lhomme was more blunt in Le nouvel Observateur yesterday, Guerre au Mali : sécuriser notre approvisionnement en uranium, War in Mali: secure our provisions of uranium,

Continue reading

Failed concrete: the bane of nuclear reactors

Let’s not forget the failed concrete on which Plant Vogtle’s unprotected stranded reactor vessel is supposed to sit.

A week before the reactor vessel train wreck, news stories said concrete pouring was delayed due to “noncompliant rebar”. Thomas Clements elaborated for the Aiken Leader 14 January 2013, Vogtle AP1000 Nuclear Reactor Vessel Discovered Unprotected, Stranded in Savannah Port since December 15 Shipment Failure,

Due to chronic delays in the pouring of “nuclear concrete” for the basemat of the AP1000 units at Vogtle and VC Summer, it remains unknown when or if any reactor vessels can actually be placed into the excavated holes at the sites. A January 10 meeting of the NRC confirmed that another basemat-related “license amendment request” (LAR) was soon to be filed by SCE&G for its AP1000 project and that the target date for granting of the LAR was March 18. It appears that the Vogtle project has fallen behind the V.C. Summer project and no strategy for the filing of a similar and necessary LAR by Southern Company is known.

Concrete, the long-time bane of Seabrook Station and also what’s keeping Crystal River shut down because nobody wants to pay the billions of dollars it would take to fix it.

 

What say we call the whole thing off, like Dominion Power did with its existing Kewaunee nuke, and TEPCO and NRG did with their plans for new South Texas nukes.

 

Maybe it’s a sign that meanwhile Google has invested a billion dollars in wind and solar and gotten 2 gigawatts of power, almost as much as the 2.2 GW the two new Vogtle nukes were supposed to produce, except Google’s solar and wind projects are online on time, and for less than just the cost overruns at Vogtle.

The Georgia legislature is in session. You can contact your legislator or the PSC today about toppling Southern Company’s three-legged nuclear regulatory-capture stool and fixing that 1973 Territoriality Law so we can get on with solar and wind in Georgia, for jobs and energy independence, and oh by the way clean air and plenty of clean water.

-jsq

Centralized Nuclear Bad Investment?

A writer for Forbes spells out the question of nuclear investment: how can something that expensive, over-budget, late, and phenomenally risky be a good investment, especially when cheaper and faster energy sources are readily available?

Peter Kelly-Detwiler wrote for Forbes today, New Centralized Nuclear Plants: Still an Investment Worth Making?

Just a few years ago, the US nuclear renaissance seemed at hand. It probably shouldn’t have been. Cost overruns from Finland to France to the US were already becoming manifest, government guarantees were in doubt, and shale gas drillers were beginning to punch holes into the ground with abandon.

Then came Fukushima. The latter proved a somewhat astonishing reminder of forgotten lessons about nuclear power risks, unique to that technology: A failure of one power plant in an isolated location can create a contagion in countries far away, and even where somewhat different variants of that technology are in use. Just as Three Mile Island put the kaibosh on nuclear power in the US for decades, Fukushima appears to have done the same for Japan and Germany, at a minimum. It certainly did not help public opinion, and at a minimum, the effect of Fukushima will likely be to increase permitting and associated regulatory costs.

He goes into detail: they take too long (while gas and solar got cheaper), they’re extremely expensive to build and run, and they’re all-or-nothing investments.

I was going to compile this list of recent nuclear financial failures, but he saves us all the trouble:

Continue reading

Vogtle reactor vessel sitting unprotected at Savannah port

What happened to Plant Vogtle’s new reactor vessel after it was in a train wreck a week ago? It went back to Savannah port and sits there unprotected and unguarded.

Thomas Clements wrote for the Aiken Leader 14 January 2013, Vogtle AP1000 Nuclear Reactor Vessel Discovered Unprotected, Stranded in Savannah Port since December 15 Shipment Failure,


Tom Clements, Alliance for Nuclear Accountability

The reactor pressure vessel (RPV) for the chronically delayed Vogtle AP1000 reactor construction project near Waynesboro, Georgia sits stranded and seemingly unprotected in the port of Savannah. The special railroad car carrying the 300-ton vessel had unknown mechanical problems on December 15 on exiting the port. The NRC has said that the vessel only got one-quarter mile before a sound was heard and the car stopped. Plans by Westinghouse and Southern Company to move the vessel are unknown. It is also unknown if the railroad car can be repaired and used or if the railroad company which owns the line is concerned that the rail car might break down again on its line in an in accessible place. Meanwhile, the apparently unguarded reactor might be subject to sabotage and sits in apparent violation of NRC quality assurance and “administrative control” regulations.

The article includes links to several more pictures taken 13 January 2013 by Tom Clements of Alliance for Nuclear Accountability, such as this one with the bridge clearly visible:

Continue reading

Georgia legislature still trying to suck up Tennessee River water

Because Atlanta can’t get a grip on its water usage, the Georgia legislature is still trying to suck up Tennessee River water. If the legislature is willing to try that, how long before they try sucking up our Floridan Aquifer water for Atlanta?

Prefiled in December to be up early as the Georgia legisture starts meeting today, is a bill to try to move the northern border of Georgia to match an eighteenth century boundary that just happens to include a bit of the Tennessee River in Georgia. HR 4, Georgia and Tennessee; boundary dispute; propose settlement, was filed by Rep. Harry Geisinger, R – Roswell, District 48, and says in part:

WHEREAS, the State of Georgia proposes to the State of Tennessee that the dispute be resolved by the states agreeing that the current boundary between the two states reflecting the flawed 1818 survey be adopted as the legal boundary between the states except for an area described as follows which shall be made a part of the State of Georgia by which Georgia shall be able to exercise its riparian water rights to the Tennessee River at Nickajack:

Georgia is already in a three-decade-long dispute with Alabama and Florida over the Chattahoochee River. Does adding a dispute over the Tennessee River seem like a good idea to you?

And how can we best stop Atlanta from coming for our Floridan Aquifer?

-jsq

Overwhelming majority of Americans want clean water and renewable energy –poll

A new poll says 94% want new energy balanced with clean air and water, 86% want to shift from coal and nuclear to wind and water power, and 79% are concerned about shale gas fracking affecting water quality.

A few excerpts from the PR Water is High Priority for Bipartisan Majority of Americans, 10 January 2013,

  • 92 percent of Americans think “U.S. energy planning and decision making” should be based on “a comprehensive understanding of what our national water resources are” — a national water roadmap that Congress asked for, but which was never produced. The national water roadmap attracts the support of 92 percent of Republicans, 89 percent of Independents, and 94 percent of Democrats.
  • 86 percent of Americans want leadership on shifting from coal and nuclear energy to wind and solar. Support for this approach exists across party lines, including 72 percent of Republicans, 83 percent of Independents, and 97 percent of Democrats.
  • 86 percent of Americans “support more studies of the health and environmental consequences of the chemicals” used in fracking. Supporters of this approach include 81 percent of Republicans, 84 percent of Independents, and 89 percent of Democrats.
  • Three quarters of Americans have heard of fracking, with 51 percent saying they are very or somewhat familiar with it. 79 percent of Americans are concerned about fracking “as it relates to water quality.”

What is to be done?

Continue reading

The water is not lost. —Forrest H. Williams

Valdosta resident Forrest H. Williams replied in the VDT today to my op-ed of 6 January. His information seems a bit out of date. For example, he cites Progress Energy’s Crystal River nuke as a good example, when it’s been down since 2009 and is still producing zero percent power, both according to the NRC. Readers of this blog know that the blog version of my op-ed already links to sources for everything I said. I may respond more later, but no doubt there are other people who want to get involved in this discussion. And I do thank Forrest H. Williams for airing the sort of disinformation that is out there, so others can dispel it.

Oh, and saying water that is evaporated is not lost is like saying trees that are burned are not lost. Evaporated water is not available for agricultural or wildlife or drinking water use, and thus is indeed lost.

Continue reading

Gretchen LCDP v. Austin Scott GA-08 on WCTV

Gretchen with LAKE video camera Hearing a representative was in town, Gretchen took the LAKE video camera down to the Chamber of Commerce. Greg Gullberg of WCTV invited her to rebut Rep. Austin Scott (R GA-08) in her role as Chair of the Lowndes County Democratic Party (LCDP). After some back and forth, the WCTV story shows transparency winning, and Gretchen with the last word.

Rep. Scott GA-08 Gretchen as LCDP Chair

But their [sic] is one thing they both agree on.

“I quite honestly think both sides ought to put their budgets on C-Span and maybe we ought to have those negotiations on C-Span,” said Scott.

“So I’m all for having everything all out on the table for all citizens to see,” said Quarterman.

Scott speaking Gretchen speaking

Hey, what if the Lowndes County Commission put its board packets and budgets out on the web for all us taxpayers to see?

Here’s the WCTV video. The video Gretchen took will follow.

Continue reading

Fire in Texas nuclear reactor

Do fires at nuclear plants like Plant Hatch actually still occur? Yep, at the South Texas Nuclear Project, just this week. And that STP Unit 2 is a different design and newer (1989) than Hatch 1 or 2. Austin has been trying to sell its share in that lemon since 1981. Even TEPCO cancelled plans for new reactors there in 2011, due to cost overruns and the Fukushima disaster. What say we cancel our new nuclear lemons at Plant Vogtle?

According to the NRC event report for 9 January 2013:

UNUSUAL EVENT DECLARED DUE TO MAIN TRANSFORMER FIRE

“Fire in Unit 2 main transformer 2A. Reactor trip. Two train of offsite power lost to Unit 2.”

“An Unusual Event was declared based on EAL HU-2—Fire or explosion in protected area or switchyard which affects normal plant operations.”

At 1655 CST, South Texas Unit 2 declared an Unusual Event due to a main transformer fire. Unit 2 tripped from 100% power and is currently at 0% power in Mode 3. The transformer fire is out. In addition to the loss of the main transformer, several safety related electrical busses and non-safety electrical busses lost offsite power. The appropriate emergency diesel generators started and powered the safety related busses. Unit 2 is currently stable and on natural circulation due to the loss of power to the reactor coolant pumps. Auxiliary feedwater is functioning as required and decay heat is being removed through the steam generator atmospheric relief valves. Unit 1 was unaffected by the event.

The licensee notified the NRC Resident Inspector.

Notified DHS SWO, FEMA, DHS NICC and NuclearSSA via email.

According to the NRC, they still don’t know Continue reading

How are we paying on something that was 100% paid off? —John S. Quarterman @ LCC 2013-01-08

Why are we furloughing librarians to save $30,000 when we apparently floated bonds for unbudgeted millions on the county palace? That’s essentially what I asked the Lowndes County Commission at their 8 January 2013 Regular Session. Nobody had an answer.

Just to add to what Commissioner Lee said, in addition to everyone appreciating all your service, I’m sure we all appreciate all his long years of service.

Of course there are some things that have come up since he was first on the Commission. For example, Internet access.

The Internet is the roads of the future.

Perhaps funding that might be as important as striping roads. It’s a thought.

For more on that, see what Idelle Dear said just before.

And I really appreciate that clock there. It’s a sign that sometimes change is good.

At least they are doing a few things differently.

When this building complex was opened in 2010, the county put out a double-sheet flyer saying it was completely paid off out of SPLOST money, with zero dollars owed. I’m wondering how it is that then, either in November or December, the Commission just before your one here, refinanced bonds that included I think it was six or seven million dollars for this very building complex? I’m very confused by that. I wonder if someone could clarify how we’re paying on something that was completely 100% paid off with zero owed.

It’s actually about $8.9 million. Why are we paying that? Nobody answered. County Manager Joe Pritchard, pictured below, on that 2010 flyer I mentioned, paid no attention.

A prominent local member of the fourth estate said nobody was allowed to answer. Actually, the Commission’s own Policies and Procedures for Citizens Wishing to be Heard include these lines:

Continue reading