Category Archives: Transportation

Bicycles noted in appointment to VLMPO Citizens Advisory Committee @ LCC 2012 03 27

Lowndes County cares about bicycles? That’s news!

The Lowndes County Commission appointed Edward Rawls, retired professional engineer and Blake Waagner, owner of Valdosta Bike Center to the Valdosta-Lowndes County Metropolitan Planning Organization (VLMPO) Citizens Advisory Committee. Commissioner Crawford Powell surprisingly said:

I think the perspective from the bicycle group would be interesting on the MPO.
Interesting development!

Also, the Commission continued the tradition which I believe was started by Commissioner Joyce Evans of attempting to get all applicants for appointed boards to introduce themselves. I think that’s a good thing.

Here’s the video:


Bicycles noted in appointment to VLMPO Citizens Advisory Committee
Regular Session, Lowndes County Commission (LCC),
Valdosta, Lowndes County, Georgia, 27 March 2012.
Video by Gretchen Quarterman for Lowndes Area Knowledge Exchange (LAKE).

-jsq

Austin solar sunflowers

What does a city with clean industry and clean energy do to attract more of it? One such city planted a solar sunflower array along its main interstate corridor.

Ariel Schwartz wrote for Inhabitant.com 17 August 2009, Solar Sunflower Field Energizes Austin, Texas

A retail lot in Austin, Texas recently sprouted a stunning field of solar sunflowers that soak up the sun’s rays to provide shade while generating a steady stream of renewable energy. Designed by public art team Harries/Heder, the installation consists of 15 flower-like solar photovoltaic panels located on a pedestrian and bike path between the village of Mueller and Austin’s highway I-35. According to Harries/Heder, the flowers are “an icon for the sustainable, LEED certified Mueller Development and a highly visible metaphor for the energy conscious City of Austin.”


View Larger Map

Are these solar sunflowers practically profitable? Perhaps:

In addition to providing shade for walkers and bikers, the solar flowers collect energy during the day to power the installation’s blue LED lights at night. Leftover power is sent to the grid to offset the cost of maintaining the installation.
But practicality of this particular field of solar flowers is not the point.

This is the point: Continue reading

County quantifies some infrastructure payback times @ LCC 2012 03 31

Water and sewer take decades for return on investment, and roads and bridges probably aren’t any better. That’s worth remembering whenever solar, busses, or trains come up.

David Rodock wrote for the VDT Sunday, Commission wraps up annual retreat: Utility payments, road projects and waste disposal discussed

The cost of one mile of construction for water takes 23 years for a return on the initial investment; sewer takes 21.3 years.

The VDT didn’t specify the similar return times for road paving or bridge construction, but it’s a safe bet they’re at least as long. The farther water or sewer lines or roads or bridges are from population centers, the more they cost both directly in installation and indirectly in trips for fire and sheriff vehicles, and especially school busses. The county commissioned a report on that several years ago, as Gretchen reminded them last year. In the particular rezoning case on Cat Creek they were discussing then (Nottinghil), they made a decision to table which seems to have caused the developer never to come back with that particular sprawl plan. I congratulated the Commissioners at that time, and I congratulate them again on not promoting sprawl.

Sprawl costs the county, payback takes years, and longer the farther out it goes. What if we did something different? More on that later.

-jsq

 

 

Alcohol ordinance and license plus two road abandonments @ LCC 2012 02 13-14

What does a Community Corrections Director do? What is the proposed modification to the alcohol ordinance? We don’t know, because the county doesn’t post the details of agenda items, just cryptic shorthand that may mean something to Commissioners or staff, but that means nothing to the public.

At this morning’s work session and tomorrow evening’s regular session, the Lowndes County Commission has a brief but eventful agenda, including a modification to the alcohol ordinance, an alcohol license, a DHS grant a GDOT grant for a road project on Davidson Road (presumably related to the new Moody AFB gate), two road abandonments, and this interesting item:

6.h. Request from Superior Court to establish salary of the Community Corrections Director
Your guess is as good as mine.

Here’s the agenda.

-jsq

LOWNDES COUNTY BOARD OF COMMISSIONERS
PROPOSED AGENDA
WORK SESSION, MONDAY, FEBRUARY 13, 2012, 8:30 a.m.
REGULAR SESSION, TUESDAY, FEBRUARY 14, 2012, 5:30 p.m.
327 N. Ashley Street – 2nd Floor
Continue reading

Commission had not seen Moody AFB gate contract with Scruggs before Work Session @ LCC 2012 01 23

We still don’t know what the county is going to do about that cost overrun for the Moody AFB gate. Nobody said at the work session yesterday morning; maybe they’ll say at the regular session tonight when they vote on a contract with some sort of revised dollar figures in it.

County Manager Mike Fletcher waved around a copy of the revised contract with Scruggs Company for the new Moody AFB gate, but said he had not provided it to the Commissioners. I wonder if they’ll see it before they vote tonight? He said it was 226 pages long, but most of that was DOT boilerplate, and only something like 20 pages was the actual county contract. Seems like they could read that much by tonight.

So could we, the public, if it was somewhere we could see it.

He also didn’t say what happened to the $128,497.05 cost overrun. The Commissioners asked no questions.

Here’s the video:


Commission had not seen Moody AFB gate contract with Scruggs before Work Session @ LCC 2012 01 23
Work Session, Lowndes County Commission (LCC),
Valdosta, Lowndes County, Georgia, 23 January 2012.
Videos by Gretchen Quarterman for LAKE, the Lowndes Area Knowledge Exchange.

-jsq

Abandoning part of Bethany Road contentious and enlightening @ LCC

Quite a few people showed up at the Lowndes County Commission public hearing about abandoning part of Bethany Road, speaking pro and con. We learned many interesting reasons for abandoning that road, which would apply to many dirt and maybe paved roads in the county, many of which are on the county’s paving list. More about that and an interesting view of the press in later posts. First, here’s what we’re talking about.

12 December 2011 Work Session

Here are the minutes:
Abandonment of a Portion of Bethany Road, County Engineer, Mike Fletcher, presented a request by citizens for the abandonment of a portion of Bethany Road. Mr. Fletcher explained that the Commission was being asked to make an initial determination that either the section of the county road system has been ceased to be used by the public to the extent that no substantial purpose is served by it, or that its removal from the county road system is otherwise in the best public interest. Mr. Fletcher added that once the initial determination was made, staff would move forward with the appropriate advertising of a public hearing at which time the Commission could make a final decision.
Here’s video in which County Engineer Mike Fletcher said the part of Bethany Road to be abandoned runs from Bethany Drive down through the Stith and Turner family properties towards Old US 41 North as far as the Rykard property, and that all residents would still have access out to other roads. County Manager Joe Pritchard noted that Continue reading

How much will we pay for a new gate? LCC meets Monday AM and Tuesday PM, 2012 January 23-24

A VLMPO appointment, a rezoning, five special lighting districts, and refunding taxes? What’s this one:
7.a. Grant Re-Application for the Rural Transportation Program and Associated Resolution
Is that for T-SPLOST? Is it about the discretionary funding? Or is it about re-applying for $12 million to widen old US 41 North? Or is it a periodic update for the MIDS bus system? If they put the agenda packets on the web with the agenda, we’d know.

Oh, and this one:

8. For Consideration – Contract with the Scruggs Company for Davidson Road Project
Maybe we’ll hear some answers to some of the questions raised by that project last time.

Here’s the agenda:

LOWNDES COUNTY BOARD OF COMMISSIONERS
PROPOSED AGENDA
WORK SESSION, MONDAY, JANUARY 23, 2012, 8:30 a.m.
REGULAR SESSION, TUESDAY, JANUARY 24, 2012, 5:30 p.m.
327 N. Ashley Street – 2nd Floor
Continue reading

Commission voted for $128,497.05 road cost overrun without discussion @ LCC 2012 Jan 10

Discrepancy? What discrepancy?

Staff presented the agenda item “7.b. Entrance Gate at Davidson and Roberts Roads”:

Lowndes County received a $2M grant from the Federal Highway Administration for construction of a new Moody AFB entrance gate, the gate to be located located at the intersection of Davidson and Roberts Roads. $477,991 of this money has already been taken for the railroad crossing improvements, leaving a balance of $1.52 million. The low bid is from Scruggs Company, $1,648,497.05.
Wait, what? The low bid is for more than the funds available? Surely somebody will explain that?

Nope, no discussion. Instead, Commissioner Crawford Powell said:

I’ll make a motion we approve the bid as presented by staff.
Commissioner Evans seconded, and they all voted for it. Hey, what $128,497.05 discrepancy?

Here’s Part 1 of 2:


Commission voted for $128,497.05 road cost overrun without discussion @ LCC 2012 Jan 10 Part 1 of 2:
Regular Session, Lowndes County Commission (LCC),
Valdosta, Lowndes County, Georgia, 10 January 2012.
Videos by Gretchen Quarterman for LAKE, the Lowndes Area Knowledge Exchange.

If we look at the previous morning’s work session (9 January 2012), we do find a bit more information. The grant was presented as involving both the Federal Highway Administration and Homeland Security, and:

Mr. Fletcher has additional information.
Continue reading

Videos of 10 Jan 2012 LCC Regular Session

The Tuesday 10th January 2012 Lowndes County Commission meeting was pretty brief, except for all the speakers regarding
7. Public Hearings-Abandonment of a portion of Bethany Road (CR 1271)
More about that later.

Here’s the agenda.

Here’s the playlist:

Videos of 10 Jan 2012 LCC Regular Session
Regular Session, Lowndes County Commission (LCC),
Valdosta, Lowndes County, Georgia, 10 January 2012.
Videos by Gretchen Quarterman for LAKE, the Lowndes Area Knowledge Exchange.

-jsq

Videos of 9 Jan 2012 LCC Work Session

This was mostly an ordinary Lowndes County Commission Work Session, except for a few items, perhaps most notably this one:
9.b. Entrance Gate at Davidson and Roberts Roads
More about that later.

Here’s the agenda.

Here’s the playlist for the entire meeting:


Videos of 9 Jan 2012 LCC Work Session
Work Session, Lowndes County Commission (LCC),
Valdosta, Lowndes County, Georgia, 9 January 2012.
Videos by Gretchen Quarterman for LAKE, the Lowndes Area Knowledge Exchange.

-jsq