Category Archives: Solar

Wind and Solar 77% of New U.S. electricity generation in November 2014

And more new capacity year to date than natural gas in 2014, according to FERC’s own numbers, despite FERC betting on the wrong horse.

Joshua S. Hill, CleanTechnica, 23 November 2014, Wind & Solar = 77% Of New US Electricity Generating Capacity In November (Exclusive),

The United States Federal Energy Regulatory Commission’s (FERC) Office of Energy Projects released its monthly “Energy Infrastructure Update” on Tuesday, and the big winners from the month of November seem to be wind and solar, which combined added up to over 70% of all new electrical generating capacity placed into service during the month. If you add in our estimate for non-utility-scale solar, the market share of solar and wind rises to 77%.

Continue reading

Solar bills in the Georgia legislature

Every year since about 2000 one or more solar bills have been before the Georgia legislature to modify the 1973 Territorial Electric Service Act to enable solar financing. 2015 could be the year one of them finally passes, what with influential people finally waking up to the cost-saving and energy-independence power of solar panels. If you want real energy reliability, lower power bills, and local jobs, you can help pass whichever bill gets before the legislature this year, and right now is a good time to help draft that bill.

Here are a few recent bills.

Rooftop solar catching on; 1973 anti-finance law really needs fixing

People are starting to wake up as the solar sun rises above their horizon. This could be the year the Georgia legislature finally passes a bill to amend the law that inhibits solar financing. Even the City of Valdosta seems suddenly interested in helping with that.

Michael Caputo and Grant Blankenship, GPB, 12 December 2014, (VIDEO) Will Solar Power’s Surge in Georgia Make It To Homeowners?,

Early adopter Creighton Rosental of Macon is what you’d call a solar pioneer. The early adopter said that he had the 4-kilowatt panels installed on the backyard side of his roof about five years ago. Two-thirds of the upfront cost—about $30,000—was covered by a federal tax credit and a Georgia state credit.

“They built a frame and mounted it to the roof, which was a substantial fairly substantial enterprise.” Rosental said.

Continue reading

Valdosta recognized for solar power, LED lighting, wastewater improvements

City of Valdosta PR today 5 December 2014, Valdosta Named “Smart Energy Municipality of the Year”,

The City of Valdosta was named “Smart Energy Municipality of the Year” by the Technology Association of Georgia (TAG) on Dec. 4, at an awards banquet held at the Georgia Tech Wardlaw Building in Atlanta, Ga. The event recognized successful individuals, businesses and municipalities who have shown dynamic leadership over the past year in Georgia’s large and growing Smart Energy sector.

Sixty nominations were received collectively in the three categories. In the municipality category, which includes cities, counties and state government agencies, the City of Valdosta was one of two finalists and the overall recipient of the award ” the other finalist was the Georgia Department of Corrections.

“We are extremely honored Continue reading

Bloomberg notices solar now cheaper than all other forms of energy

What Jon Wellinghoff predicted a year ago is starting to filter 300x199 Solar prices dropped below all other energy sources, in Georgia solar breakeven, by John S. Quarterman, 30 November 2014 into the news media: solar is going to win, and very quickly. Welcome to a sunny world!

Tom Randall, Bloomberg, 29 October 2014, While You Were Getting Worked Up Over Oil Prices, This Just Happened to Solar,

After years of struggling against cheap natural gas prices and variable subsidies, solar electricity is on track Continue reading

Sabal Trail’s eminent domain argument applied to FPL headquarters

300x72 Between the Atlantic and the canal, in FPL Headquarters, by John S. Quarterman, 24 November 2014 The alleged “Project Need” in Sabal Trail’s Friday FERC docket CP15-17 permit application to get eminent domain for its 100-foot-wide gouge for a yard-wide hazardous fracked methane pipeline is: Sabal Trail claims it has contracts to sell the gas. Let’s apply that logic to Sabal Trail co-owner FPL’s headquarters.

This is FPL headquarters at 700 Universe Blvd., Juno Beach, Florida, in the Palm Beach County Property Appraiser’s map: Continue reading

Sabal Trail newspaper assertions contradicted by Spectra corporate documents and FERC filings –John S. Quarterman to FERC

“I ask you and FERC to stop Sabal Trail from telling newspapers things that Spectra Energy’s own corporate documents refute, and to start paying attention to multiple requests by county commissions and other affected parties.”

Back in December, Spectra’s Andrea Grover and Brian Fahrenthold were “not familiar” with Spectra’s lengthy safety rap sheet (see above picture). Yesterday’s VDT had Sabal Trail: Eminent domain accusation ‘hard to believe’ by Joe Adgie. Meanwhile, the Moultrie Observer has picked up the VDT story. Maybe some newspapers will also publish better information than what trained pipeline PR people seem not to remember or believe, despite copious evidence of the actual facts.

Filed with FERC 19 November 2014 accession Number: 20141119-5232. The attachments are in the PDF, and they’re all in the links in the HTML version below. -jsq Continue reading

SONAT pipeline break in Berrien County, GA on offshoot of same line Sabal Trail proposes to parallel –John S. Quarterman to FERC

300x225 The break in the ditch across from 986 Bradford Road, in Berrien break, by John S. Quarterman, 6 November 2014 “The SONAT pipeline that broke in Berrien County, Georgia was only a 9- or 10-inch line, I’m told at 800PSI. Sabal Trail proposes a 36-inch line, at much higher pressure. I’m no expert, but that seems like at least twenty times the explosive capacity. I don’t want that risk for any of my neighbors anywhere.”

Filed with FERC 15 November 2014 (PDF), posted by FERC 17 November 2014 as Accession Number: 20141117-5040. Continue reading

Keystone XL pipeline rejected in U.S. Senate

We are all Indians to the fossil fuel cowboys, but this time the Indians won. The U.S. Senate yesterday rejected the Keystone XL pipeline. It won’t end there, but it should, because solar power is cheaper, faster, cleaner, and actually does bring jobs to the U.S.


Picture from US Uncut

Of course, TransCanada has a backup plan for getting its dirty Alberta tar sands oil to overseas market: a pipeline entirely through Canada to New Brunswick. Which means the past several years of TransCanada insistence that Keystone XL was necessary was just so much bs. Which indicates how much we should believe other Keystone XL claims, such as those about jobs the pipeline would supposedly create.


Source: Reuters

Angelo Young, International Business Times, 8 October 2014, No Keystone XL Pipeline? No Problem, Says Canadian Firm Planning To Send Crude East Instead Of South, Continue reading

Even more U.S. solar jobs than in coal or oil and gas extraction

In a year solar jobs increased more than 20% to 142,000, according to the National Solar Jobs Census 2013.

Let’s remember Politifact Rhode Island rated as true Senator Sheldon Whitehouse’s claim that there are already more solar jobs than coal mining jobs. And already last year there were more solar jobs than in production and nonsupervisory oil and gas extraction. That was 119,000 solar jobs according to the National Solar Jobs Census 2012 by the Solar Foundation; thus the 20% increase.

Meanwhile, “production and nonsupervisory employees” in the oil and gas extraction industry increased 4% from 106,400 in September 2013 to 110,600 in September 2014, according to Oil and Gas Extraction: NAICS 211 by the U.S. Bureau of Labor Statistics. Total oil and gas industry employment increased 8% from 197,500 to 213,100 in the same period.

Of course, we really should be using the 2013 (not 2014) oil and gas figures to compare Continue reading