In what the County Planner calls “central Lowndes County” there’s
a sinkhole in a garage,
deeper than a hoe handle.
Michael McCormick called me up yesterday and told me about this
sinkhole in his garage at 4326 Norman Hall Road.
Naturally he’s a bit concerned about this problem.
He thinks his insurance may cover it, but he’s looking for other
options in case.
So far, nobody seems to know what to do.
Which can’t be the case:
this isn’t the first sinkhole in Lowndes County.
We’re helping get the word out to help find whoever does know more about
sinkholes and what resources are available to deal with them.
It’s not only straight down and under the carport concrete.
The vocal protests in Valdosta are long gone, but the controversy
over the proposed Biomass plant lingers. This time not for concerns
of health safety, but over the land.
The Valdosta-Lowndes County Industrial Authority plans to sue
Wiregrass Power LLC to end its contract.
Ban the Burn Go 100% Solar.
The proposed Biomass Plant was supposed to be a low-cost source of
efficient energy. Supporters say it would have created hundreds of
jobs. But opponents say the health risks include cancer, lung
disease and respiratory disease.
750,000 gallons of water each day
Tell me, Col. Ricketts, doesn’t it feel better to be visibly on the side
of the people, instead of having to defend a bad business deal?
Far to the north of here, a botanical garden installed
more than a megawatt of solar power a year ago.
Maybe Georgia Power should ask them how it’s done.
June 16, 2011, Kennett Square, PA — Longwood Gardens today
commissioned a new, ground-mounted solar field spanning more than 10
acres at the horticultural showplace in Kennett Square,
Pennsylvania.
One of the largest examples of clean emission-free energy in the
region, the solar field produces 1.2 MW (megawatts) of power and
will produce 1.5 MW when the final panels are installed in the
coming weeks. The fixed-tilt, 1.5 MW solar installation will produce
enough electricity to offset the usage of approximately 138 average
Pennsylvania homes and reduce Longwood’s annual carbon dioxide
emissions by 1,367 tons.
“We are always looking for ways to advance our sustainable
practices,” said Paul Redman, Longwood Gardens Director.
“It is integral to Longwood’s mission to decrease our
dependence on fossil fuels.” We want to establish best
practices and lead the way in showing communities how to live
responsibly,” said Redman.
Imagine if Georgia Power and Southern Company acted responsibly
and led the way in solar power!
Did you know
last night’s Planning Commission meeting included
a public hearing about changes to the county’s
Unified Land Development Code (ULDC)
related to land disturbances and water quality?
You wouldn’t have found out about that in the agenda,
because
it wasn’t posted anywhere you’d be likely to see it.
(Where does GLPC post the one physical copy of the agenda required by law,
anyway?)
Supposedly it was advertised in the Valdosta Daily Times,
but a search
of Public Notices in Statewide Database of Public Notices from Georgia’s Legal Organ Newspapers
for 1 June 2012 through 27 August 2012 finds nothing.
From a procedural standpoint the amendment has been advertised in
the Valdosta Daily Times to fulfill legal requirements. Beyond
legal requirements staff has plans to post this agenda
item and draft ULDC on the Lowndes County Website at
http://www.lowndescounty.com/content.asp?pid=23&id=224. Regarding
staff review of the amendments, the TRC recommended for their approval
at their 08/16 regular meeting.
If you’d happened to look several levels deep on the Lowndes County website
you would have found
that undated announcement:
Ever heard of solar panels or windmills shutting down due to heat?
Me, neither.
Nuclear plants, yes, such as Millstone unit 2 in Connecticut,
closed for two weeks.
Connecticut's nuclear power plant has returned to full service
nearly two weeks after one of its two units was forced to shut down
because seawater used to cool it down was too warm.
Millstone Power Station spokesman Ken Holt said Monday that Unit 2
returned to 100 percent power Saturday. It shuttered Aug. 12 after
record heat in July contributed to overheated water from Long Island
Sound.
Water is used to cool key components of the plant and is discharged
back into the sound. The water's temperature was averaging 1.7
degrees above the 75-degree limit.
The temperature has since dropped to 72 degrees, Holt said.
"The water temperature cooled sufficiently to support operations and
that, combined with the weather forecast, has given us the
confidence to restart," he said.
Wait, wasn't the whole point of big distributed baseload power plants
supposed to be reliable dependable power?
Millstone provides half of all power in Connecticut and 12 percent
in New England.
Some scientists believe the partial Millstone shutdown was the first
involving a nuclear plant pulling water from an open body of water.
A few nuclear plants that draw water from inland sources have
powered down because of excessively warm water.
Time to think again!
Distributed solar and wind power doesn't have this problem,
and a smart grid can get their power where it's needed.
Alliant Energy in Iowa is celebrating an emission-reduction
technology that will help a power plant meet new standards —
creating 400 jobs in the process. One recent study found that
“EPA’s two new air quality rules create 1.5 million
jobs.”….
“The OGS [Ottumwa Generating Station] project is a win-win for
Iowa’s economy and environment,” said Pat Kampling, president
and CEO of Alliant Energy. “The project at OGS will create
approximately 400 good-paying construction jobs for Iowa’s working
families and foster future economic growth while making Iowa’s air
cleaner.”
Better for public health, better for less climate change,
and better the economy: more jobs for Iowans.
The
Lowndes County Commission’s calendar
does not list this meeting;
it doesn’t list any Planning Commission meetings.
The county website also has no description of GLPC that I can find.
It does get a mention three levels deep, under
Planning.
Purpose: The mission of the Greater Lowndes
Planning Commission (GLPC) is to look beyond short-term solutions in
planning for the future of the Greater Lowndes community; to improve the
public health, safety, convenience and welfare; and to provide for the
social, economic and physical development of communities on a sound and
orderly basis, within a governmental framework and economic environment
which fosters constructive growth and efficient administration.
I’d heard a rumor that some sort of lawsuit about the biomass site
was the subject of some of the Industrial Authority executive
sessions for real estate discussions.
VLCIA has finally said in public what their position is.
The Valdosta-Lowndes County Industrial Authority plans to send a
petition to Lowndes County Superior Court to sue Wiregrass Power,
LLC, for a clear title on the land purchased for the development of
a biomass energy plant.
The Authority believes Wiregrass defaulted on a lease agreement to
build the plant, placing ownership of the 22.22-acre tract back in
their hands, but Wiregrass denies the allegations. This denial casts
“a cloud” of suspicion on the Authority that may prevent
it from re-marketing the property, according to the petition,
leading to the suit.
Sounds like they’re publicizing their intent
to try to scare Sterling off without having to sue.
I’m for that.
LAKE videoing George videoing Gretchen canvassing on Summerlin Street in Valdosta,
Canvassing, Lowndes County Commission (GretchenForLowndes.com),
Videos by John S. Quarterman for Lowndes Area Knowledge Exchange (LAKE),
and by George Boston Rhynes for bostongbr on YouTube,
Valdosta, Lowndes County, Georgia, 25 August 2012.
Gretchen mentioned she’d been going to County Commission meetings
for about four years now, and thought it was her turn to serve.
George asked why she was canvassing on the west side of Valdosta,
and she answered:
The thing that is important for people to know is that every
single citizen in the county gets to vote,
Whether you live in Valdosta, Hahira, Lake Park, Dasher, Remerton,
or the unincorporated areas.
Every single person who lives in Lowndes County
who is a registered voter gets to vote.
You have until October 8th to register
to vote for the November 6th election.
You can register at the Board of Elections at 2808 North Oak Street,
or there are people going around with forms you can fill in and mail
in or they will hand carry down there.
Participatory media!
Doing what traditional media could do, George Boston Rhynes
interviewed Gretchen Quarterman as she canvassed on
Summerlin Street in Valdosta Saturday.
Doing what traditional media can’t do, I videoed
George videoing Gretchen, and he later videoed me
helping Gretchen canvass.
Thanks you so much for keeping us informed and it is still a
disgrace that our elected officials cannot publish their meetings to
all citizens. When will our Mayor; Council and County Commissioners
start informing all the citizens and not just a select few of
conservatives?
When will it all end? The time has come for change to take place in
Valdosta for the good of all citizens and visitors. We need and
should demand television, radio, internet and other means of
distributing information to citizens.
How sad in 2012?
George included a video
of his thoughts on elections hereabouts and elsewhere:
Words from our YOUTHS….and where are you?
Indeed George Rhynes is out there reporting the truth as he sees it,
this time along with two VSU students.