Apparently
ADS’s landfill gas project
wants to take in methane from the closed old landfill, as well,
according to a public notice today that proposes
a pipeline from the old
Evergreen Landfill
to the
Pecan Row Landfill that has the natural gas turbine.
Nevermind
the
$27,500 fine for PCBs or
that
coal ash in the landfill that nobody on the Lowndes County Commission
or Valdosta City Council or Deep South Solid Waste Authority (SWA) can be bothered to check on.
Nevermind the
unaccounted for tipping fees
or
host fees.
I wonder if cutting through that vegetative buffer will let the coal ash and PCBs reach the Withlacoochee River more easily?
The yellow path indicated for the pipeline is just a guess.
In the VDT today, PUBLIC ADVISORY NOTICE,
The proposed project located west of Valdosta, in Lowndes County, GA along Wetherington Lane near the Pecan Row Landfill facility (2995 Wetherington Lane, Valdosta, GA, 31601) involves buffer encroachments necessary to install a 30-inch gas pipeline. This pipeline will Continue reading