Category Archives: Economy

Millage Rate Meeting @ LCC Millage 2020-08-11

The board packet for the Tuesday Lowndes County Commission Regular Session says, on page 65, which is the agenda sheet for agenda item 6.a. Adoption of Millage Rate:

HISTORY, FACTS AND ISSUES: The Board of Commissioners is required to set the county-wide millage rate for 2020. A public hearing was held prior to this adoption as required. The county-wide millage should be set at 10.851 mills with the County receiving 8.601 mills, the Industrial Authority receiving 1.00 mill and the Parks and Recreation Authority receiving 1.25 mills. This represents a reduction of 0.087 mills.

I wondered: when was this public hearing?

[10.851 mills, 8.601 County, 1.00 VLDA, 1.25 VLPRA. reduction of 0.087 mills.]
10.851 mills, 8.601 County, 1.00 VLDA, 1.25 VLPRA. reduction of 0.087 mills.

According to the county’s online calendar, it hasn’t hapened yet, because it’s 5:00 PM that same Tuesday.

So if you’re going to the Regular Session, might as well show up half an hour earlier for the Millage Rate Meeting. Chances are, you’ll be the only member of the public there.

-jsq

Investigative reporting costs money, for open records requests, copying, web hosting, gasoline, and cameras, and with sufficient funds we can pay students to do further research. You can donate to LAKE today!

Packet: $0.9 million paving project, reduction of millage rate, 3 small rezonings @ LCC 2020-08-10

For the Monday morning Work session and Tuesday evening voting Regular Session, the Lowndes County Commission has only one item that has “BUDGET IMPACT” in its agenda sheet, but it’s a doozy:
Cost What
$899,744.40 Ridgecrest, Woodland and Glenview Paving & Drainage Project
$899,744.4Total

The agenda sheet says:

Lowndes County solicited bids for Ridgecrest, Woodland and Glenview Grading, Drainage, Base and Paving. The project will consist of Grading, Drainage, Base and Paving of Ridgecrest and Woodland and the installation of a box culvert under Glenview Drive. Vendors present for the pre-bid meeting held on July 21, 2020, were James Warren & Associates, Southland Contractors, Reames & Son Construction, Rountree Construction, and The Scruggs Company. Three bids were received on August 4, 2020.

Here are the bids:

[Bids, NC-TIA 2019-04: Ridgecrest Street and Woodland Drive]
Bids, NC-TIA 2019-04: Ridgecrest Street and Woodland Drive

Where is that? South of the west end of W Savanna Ave, near I-75 Exit 16.

[Google map: Ridgecrest Street & Woodland Drive]
Google map: Ridgecrest Street & Woodland Drive

Ah, yes, I got stuck in traffic there not so long ago, trying to get around a stopped train.

We know this much because LAKE obtained a copy of the board packet through an open records request; it’s on the LAKE website.

I suppose if we rummage around enough we’ll find details of NC-TIA 2019-04 somewhere on the county’s website.

Here is the agenda.

LOWNDES COUNTY BOARD OF COMMISSIONERS
PROPOSED AGENDA
WORK SESSION, MONDAY, AUGUST 10, 2020, 8:30 a.m.
REGULAR SESSION, TUESDAY, AUGUST 11, 2020, 5:30 p.m.
327 N. Ashley Street – 2nd Floor

Continue reading

Stick with old budget for now @ LCC 2020-06-26 @ LCC 2020-06-26

The Lowndes County Commission did not pass a new budget, and nobody seems to know or at least be willing to say why, even though that was on the agenda for that Tuesday meeting.

Instead, they’ve scheduled a “Special Called Meeting on Friday, June 26, 200, at 9:00 a.m., to consider a resolution to temporarily continue the operation of the 2020 Fiscal Year budget.”

We don’t have the new draft budget, but here’s the general fund expenditure chart from the old budget they’re extending:

[General Fund Expenditures]
General Fund Expenditures
37.12% + 12.17% = 49.29%

I wonder if this delay has anything to do with sales tax revenues being way down due to the pandemic, and nobody really knowing when they might recover?

There’s no video of the meeting, but fortunately the VDT was on the job. Chris Herbert, Valdosta Daily Times, 24 June 2020, Lowndes County Commission tables 2021 budget, Continue reading

Budget, Bevel Creek Lift Station, Val Tech Road widening, Appointments: ZBOA, Library, VLPRA, Construction @ LCC 2020-06-22

The big item on the Lowndes County Commission agenda for Monday to vote on Tuesday evening is the Adoption of Fiscal Year 2021 Budget totaling $59,443,920, with $22,774,781 or 38% to Public safety, i.e., the Sheriff’s department, including the jail.

[A RESOLUTION ADOPTING THE FISCAL YEAR 2021 OPERATING BUDGET]
A RESOLUTION ADOPTING THE FISCAL YEAR 2021 OPERATING BUDGET
PDF

The board packet is on the LAKE website after we obtained it through an open records request.

Although I hear the hotel/motel tax is down 80% due to virus pandemic, the Hotel/Motel Tax FY 2021 County Budget Budgeted Proceeds are $400,000.00. They are budget to go to:

$171,429.00 Transfer to Lowndes County’s Special Services Fund from which the County funds (i) services the County provides primarily for the benefit of the unincorporated area and
(ii) the County’s share of funding of services the County and one or more municipalities jointly fund

$171,429.00 Transfer to Valdosta-Lowndes County Conference Center and Tourism Authority
to promote tourism, convention, and trade shows in accordance with the FY 2021 Budget Plan of said Authority for same which is made a part of this Budget Plan

$57,142.00 Transfer to Valdosta-Lowndes County Parks and Recreation Authority
for capital costs and operating expenses of parks and recreational facilities owned and operated by said Authority

A rare no-match federal grant: Acceptance of FY20 Coronavirus Emergency Supplemental Funding brings the total expected expenditures from this Tuesday’s Regular Session down to less than a quarter million dollars:

Cost What
$148,345.58 Val Tech Road Grading, Drainage, Base and Paving
$82,000.00 Bevel Creek Manhole Emergency Repair
$57,300.00 The Modernization/Upgrade of the Elevator in the Governmental Building
($58,008)
in Federal Funding.
There is no local match requirement.
Acceptance of FY20 Coronavirus Emergency Supplemental Funding
$229,637.58Total

I commend Lowndes County Utilities for moving ahead to fix the recent manhole collapse at the Bevel Creek Lift Station on GA 376 near Loch Laurel Road. See also Sewer line repair between manholes, Bevel Creek Lift Station @ LCC 2020-06-22.

Photo: Terry Richards, The Valdosta Daily Times, Heavy rains cause problems in Lowndes 2020-06-08.
Photo: Terry Richards, The Valdosta Daily Times, Heavy rains cause problems in Lowndes 2020-06-08.

It’s a busy agenda for appointments, to Continue reading

Storm drains, Smart Community Challenge Grant @ VCC 2020-06-11

I give them credit for livestreaming while they work out the kinks in for example better sound.

City Manager Mark Barber is reading questions from citizens. First one is about how to prevent situations like with George Floyd. Second one is about unnecessary use of force, more funding for educators, minimum wage, etc.

[Vcc-facebook-live]
Vcc-facebook-live

Valdosta City Council’s own facebook livestream. Continue reading

Notice: Budget Work Session @ LCC 2020-05-27

This is all we know:

[Notice]
Notice

Date: May 27, 2020

Time: 9:30 AM

Location: Board of Commissioners Administration Building

Address: 327 N. Ashley Street
2nd Floor—Multipurpose Room
Valdosta, GA 31601

Well, we know they never video these budget meetings.

-jsq

Investigative reporting costs money, for open records requests, copying, web hosting, gasoline, and cameras, and with sufficient funds we can pay students to do further research. You can donate to LAKE today!

Videos: Hamm Estates roads, Deannexation, Rezonings, Right of Way, Software, Health Insurance, Repairs, KLVB @ LCC 2020-02-25

The longest regular item at 4 minutes on this voting Regular Session agenda was 6.b. Accept Hamm Estates Dr. into the County Road Inventory. Longer were two Citizens who spoke at the end about Keep Lowndes-Valdosta Beautiful (KLVB).

Hamm Estates

Here again are the costs found in the agenda sheets for the items, from most expensive down, with links back into the agenda.

CostWhat
$290,000.00 2020 Administrative Services Agreement with Allied Benefit Systems, Inc.
$50,433.00 Bid for Repairs to Knights Academy Road; emergency repairs for Culvert Aprons
$43,245.50 Approval of Clyattstone Rd.-Simpson Ln. ROW Purchases
$24,613.44 Microsoft Server 2019 Data Center License
$11,535.00 Approval of Clyattstone Rd.-Simpson Ln. ROW Acquisition
$419,826.94Total

The actual cost for the Clyattstone Road-Simpson Lane project is larger; more like $77,696.50 so far, before grading, base, and paving; see the LAKE notes on the preceding morning’s Work Session.

Below are links to each LAKE video of each agenda item, with a few notes. See also Continue reading

Videos: Deannexation, Rezonings, Right of Way, Software, Health Insurance, Road Repairs @ LCC 2020-02-24

The longest item of those I videoed (yes, I was late to this Work Session) was 6.f. Deannexation of Ganas Property by Lake Park, which apparently doesn’t cost the county anything. Directly, at least. Maybe even net positive, due to property taxes.

Deannexation

Here are the costs found in the agenda sheets for the items, from most expensive down, with links back into the agenda.

CostWhat
$290,000.00 2020 Administrative Services Agreement with Allied Benefit Systems, Inc.
$50,433.00 Bid for Repairs to Knights Academy Road; emergency repairs for Culvert Aprons
$43,245.50 Approval of Clyattstone Rd.-Simpson Ln. ROW Purchases
$24,613.44 Microsoft Server 2019 Data Center License
$11,535.00 Approval of Clyattstone Rd.-Simpson Ln. ROW Acquisition
$419,826.94Total

The actual cost for one item is larger; see below for Clyattstone Road and Simpson Lane ROW Purchases.

Below are links to each LAKE video of each agenda item, with a few notes. See also Continue reading

Notes: Special Called Meeting @ LCC 2020-04-16

Twelve minutes for their first-ever dial-in Lowndes County Commission meeting.

That’s longer than many of their in-person meetings, maybe because the Chairman had the Clerk call roll for the Commissioners for each vote. Both votes were unanimous with no discussion. Nobody explained why these items were important enough for a Special Called Meeting.

[Only two items]
Only two items

Before the meeting, in the room they had already Continue reading

Dialin to Special Called Meeting, Lowndes County Commission 2020-04-16 @ LCC 2020-04-16

Update 2020-04-16: LAKE Notes taken during the conference call.

Something good out of a pandemic: the first-ever telephone listen-in for a Lowndes County Commission meeting.

[With dialin instructions]
With dialin instructions

I assume listen-in because there is no Citizens To Be Heard on the agenda. While Madison County, Florida, BOCC, weeks ago had a participatory conference call meeting, I can’t imagine Lowndes County Commission doing that.

The only agenda items are how to spend the Hotel/Motel Tax (assuming there is any) for Tourism, and paying for right of way (ROW) for one parcel so TSPLOST paving of Clyattstone Road and Simpson Lane can continue. I don’t know why that one paving project is so important.

Special Called Meeting
April 16, 2020, 9:30 AM
@ In an effort to respect social distancing, a conference call line has been set up for this meeting. The call in number 813-769-0500 and the access code is 373-829-614#

There are only two items being addressed due to them needing immediate attention.

More Details

That “More Details” link goes to a page that has exactly the same information.

Agenda

However, unlike most Special Called Meetings, for this one they did post an agenda. We don’t know whether they will video the meeting. That would be good, since LAKE can’t go into the building to do that. See also Continue reading