Public hearings for the event center rezoning and the Abandonment of a Portion of Worthington Triangle are on the agenda for the Monday morning Work Session and for voting in the Tuesday evening Regular Session. That rezoning is also (back) on Planning Commission agenda for Monday evening.
And back on the County Commission agenda is the Withlacoochee River Flood Inundation Map Project; see LAKE videos from the previous County Commission meetings, and a modest suggestion.
Also in water, another LAS Pump Motor Repair and a Foxborough Pressure Reducing Valve/Vault. It was actually an LAS pump control panel last month.
LOWNDES COUNTY BOARD OF COMMISSIONERS
PROPOSED AGENDA
WORK SESSION, MONDAY, JULY 25, 2016, 8:30 a.m.
REGULAR SESSION, TUESDAY, JULY 26, 2016, 5:30 p.m.
327 N. Ashley Street – 2nd Floor
- Call to Order
- Invocation
- Pledge of Allegiance to the Flag
- Minutes for Approval
- Appointments
- Public Hearings
- REZ-2016-13 Ed and Evelyn Lund, 4701 Knights Ferry Rd, PD-R Amendment, Community Well and Septic, ~15 acres
TRC Recommendation: Pending 07/19 Meeting
GLPC Recommendation: Pending 07/25 MeetingDocuments:Rezoning Case REZ-2016-12.pdf
- Abandonment of a Portion of Worthington Triangle
Abandon the Right of WayDocuments:Abandonment of Worthington Triangle.pdf
- For Consideration
- Transportation Service Contract Addendum
Approve the Addendum to the Contract- Land Exchange between Georgia DOT and Lowndes County
Authorize Chairman to Sign Quit Claim Deed and Accept the Quit Claim Deed from GDOT
Documents:Land Exchange between Georgia DOT and Lowndes County.pdf
- LAS Pump Motor Repair
150 hp pump motor at LAS inoperable, needs to be rewound. Staff recommends Smith Electric make needed repairs to motor for $6,789.12Documents:LAS Pump Motor Repair.pdf
- Foxborough Pressure Reducing Valve/Vault
Foxborough Subdivision is experiencing high water pressure due to the new booster station from Kinderlou. Staff recommends a PRV & Vault be installed by Standard Contractors for $8,987.00Documents:Foxborough Pressure Reducing Valve.pdf
- ACCG IRMA Liabilty Program Renewal
Approve property and liability deductibles at the current levels of $2,500.00, per occurrence and $5,000.00, per occurrence for law enforcement and public officials liability.Documents:ACCG IRMA Liability Program Renewal.pdf
- Withlacoochee River Flood Inundation Map Project
Request direction be provided to staff regarding funding for the development of a flood inundation map for a section of the Withlacoochee River in Lowndes County.Documents:Withlacoochee River Flood Inundation Map Project.pdf
- Worthington Triangle Right-of-Way Quitclaim Deeds
Approve quitclaim deeds and authorize the Chairman to signDocuments:Worthington Triangle Right-of-Way Quitclaim Deeds.pdf
- Reports – County Manager
- Citizens Wishing to be Heard-Please State Your Name and Address
- Adjournment
-jsq
Investigative reporting costs money, for open records requests, copying, web hosting, gasoline, and cameras, and with sufficient funds we can pay students to do further research. You can donate to LAKE today!
Short Link:
Pingback: Videos: Vacant seat Behavioral Health Board, Rezoning also on GLPC Monday, road abandonment, land exchange, and flood map project @ LCC 2016-07-25 | On the LAKE front